| {{#Wiki_filter:PR.IC3R.I EY'(ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9410190146 DOC.DATE: 94/10/12 NOTARIZED: | | {{#Wiki_filter:PR.IC3R.I EY' (ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) |
| NO DOCKET g FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M. | | ACCESSION NBR:9410190146 DOC.DATE: 94/10/12 NOTARIZED: NO DOCKET g FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH. NAME AUTHOR AFFILIATION LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) |
| Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Forwards supplemental info in support of 941009 proposed amend to TS 3/4.8.2,"DC Sources-Operating," submitted under emergency circumstances. | | Forwards supplemental info in support of 941009 proposed i |
| DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR L ENCL i SIZE: TITLE: OR Submittal: | | amend to TS 3/4.8.2, "DC Sources Operating," submitted under emergency circumstances. |
| General Distribution 0 NOTES:Standardized plant.05000529 R RECIPIENT ID CODE/NAME PD4-2 LA HOLIAN, B INTERNAL: ACRS NRR/DE/EELB NRR/DRPW NRR/DSSA/SRXB OGC/HDS2 EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 6 6 1 1 1 1 1 1 1 0 1 1 RECIPIENT ID CODE/NAME PD4-2 PD TRAN,L LE CENT~0 NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D 0 C U N NOTE TO ALL"RIDS" RECIPIENTS:
| | DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution L ENCL SIZE: |
| PLEAsr I~EL>Us To Rr DUcr;ivASTE!cONTAc r I HF DOCI:-CLIENT cONTROL DESK, ROOM PI-37 (EXT.504.0083)TO ELIihIINATE YOUR NAiIE FRO>I DISTRIBUTION LISTS I:OR DOCl'b,IEi'I'S YOI.'ON"I'LEI)I TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 19 | | 0 NOTES:Standardized plant. 05000529 R RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 HOLIAN, B 1 1 TRAN,L 1 1 INTERNAL: ACRS 6 6 LE CENT~0 1 1 NRR/DE/EELB 1 1 NRR/DRCH/HICB 1 1 NRR/DRPW 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D |
| ~I V'd IJ Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O.BOX 52034~PHOENIX, ARIZONA 85072-2034 JAMES M.LEVINE VICE PRESIOENT NUCLEAR PROOUCTION U.S.Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-37 Washington, D.C.20555 102-03147-JML/AKK/R JR October 12, 1994 | | 0 C |
| | U N |
| | NOTE TO ALL"RIDS" RECIPIENTS: |
| | PLEAsr I~EL> Us To Rr DUcr; ivASTE! cONTAc r I HF DOCI:-CLIENT cONTROL DESK, ROOM PI-37 (EXT. 504.0083 ) TO ELIihIINATEYOUR NAiIE FRO>I DISTRIBUTION LISTS I:OR DOCl'b,IEi'I'S YOI.'ON"I'LEI)I TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 19 |
| | |
| | ~ I V |
| | 'd IJ |
| | |
| | Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 102-03147-JML/AKK/RJR JAMES M. LEVINE VICE PRESIOENT October 12, 1994 NUCLEAR PROOUCTION U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-37 Washington, D.C. 20555 |
|
| |
|
| ==Dear Sirs:== | | ==Dear Sirs:== |
|
| |
|
| ==Reference:== | | ==Reference:== |
| | Letter No. 102-03144, dated October 9, 1994, "Proposed Technical Specification Amendment to Specification 3/4.8.2, D.C. Sources, Under Emergency Circumstances" |
| | |
| | ==Subject:== |
| | Palo Verde Nuclear Generating Station (PVNGS) |
| | Unit 2 Docket No. STN 50-529 Supplemental Information in Support of Proposed Technical Specification Amendment to Specification 3/4.8.2, D.C. Sources, Under Emergency Circumstances File: 94-056-026'4-005%19.05 Based upon a meeting held with NRC Staff on October 12, 1994, Arizona Public Service Company (APS) is providing the enclosed supplemental information in support of the proposed amendment to Technical Specification 3/4.8.2, D.C. Sources - Operating. |
| | Should you have any questions, please contact Scott A. Bauer of my staff at (602) 393-5978. |
| | Sincerely, JML/AKK/RJR/rv Enclosure cc: L. J. Callan (all w/enclosure) |
| | K. E. Perkins B. E. Holian K. E. Johnston A. V. Godwin (ARRA) |
| | I B.'0 89 1 94101'7I014b 941012 ADQCK 0500052'P PDR P? .......PDR |
|
| |
|
| Letter No.102-03144, dated October 9, 1994,"Proposed Technical Specification Amendment to Specification 3/4.8.2, D.C.Sources, Under Emergency Circumstances"
| | f c- f l |
| | Lg Ee |
|
| |
|
| ==Subject:==
| | ENCLOSURE SUPPLEMENTAL INFORMATION IN SUPPORT OF PROPOSED AMENDMENTTO TECHNICAL SPECIFICATION |
| Palo Verde Nuclear Generating Station (PVNGS)Unit 2 Docket No.STN 50-529 Supplemental Information in Support of Proposed Technical Specification Amendment to Specification 3/4.8.2, D.C.Sources, Under Emergency Circumstances File: 94-056-026'4-005%19.05 Based upon a meeting held with NRC Staff on October 12, 1994, Arizona Public Service Company (APS)is providing the enclosed supplemental information in support of the proposed amendment to Technical Specification 3/4.8.2, D.C.Sources-Operating.
| | . SECTION 3/4.8.2, D.C. SOURCES UNDER EMERGENCY CIRCUMSTANCES |
| Should you have any questions, please contact Scott A.Bauer of my staff at (602)393-5978.Sincerely, JML/AKK/R JR/rv Enclosure cc: L.J.Callan K.E.Perkins B.E.Holian K.E.Johnston A.V.Godwin I B.'0 89 1 (all w/enclosure)(ARRA)94101'7I014b 941012 PDR ADQCK 0500052'P P?.......PDR f c-f l Lg Ee ENCLOSURE SUPPLEMENTAL INF ORMATION IN SUPPORT OF PROPOSED AMENDMENT TO TECHNICAL SPECIFICATION
| | |
| .SECTION 3/4.8.2, D.C.SOURCES UNDER EMERGENCY CIRCUMSTANCES | | ~ V ENCLOSURE On October 12, 1994, a meeting was held with the NRC to discuss APS'ro'posed amendment to Technical Specification 3/4.8.2, D.C. Sources. In the meeting, and in telephone calls subsequent to the meeting, APS presented additional/revised compensatory measures to be implemented between now and the fifth refueling outage for Unit 2 in view of the degradation observed in the four battery banks. These additional/revised compensatory measures are described below.. |
| ~V ENCLOSURE On October 12, 1994, a meeting was held with the NRC to discuss APS'ro'posed amendment to Technical Specification 3/4.8.2, D.C.Sources.In the meeting, and in telephone calls subsequent to the meeting, APS presented additional/revised compensatory measures to be implemented between now and the fifth refueling outage for Unit 2 in view of the degradation observed in the four battery banks.These additional/revised compensatory measures are described below..h APS is replacing a combined total of 23 cells in the bank A and C batteries. | | h APS is replacing a combined total of 23 cells in the bank A and C batteries. The replaced cells will be used to form four control groups of 4 cells each. Testing of these four'roups will be performed at approximately 30 day intervals as follows: |
| The replaced cells will be used to form four control groups of 4 cells each.Testing of these four'roups will be performed at approximately 30 day intervals as follows: Time From Present and T e of Test Control Grou¹October November December Jenuerlr 1.2 3 4 S N/A, N/A N/A N/A S N/A N/A N/A N/A S N/A.N/A N/A N/A S Legend: S=Battery Service Test (performed to the bank A battery load profile)This testing is being performed to provide assurance that the degradation mechanism is primarily related to discharge/recharge cycling of the batteries and to demonstrate that the batteries in the unit are capable of meeting the design duty cycle.After each test, an evaluation of the performance of each group will be'performed using the following acceptance criteria: 1.The control group results meet the bank A battery design duty cycle;and.2.No individual cell reversal occurs (<1.0 volts).The results of the tests will be used to verify the degradation model and will be provided to the NRC.If the above criteria'are not met, the unit will enter the action statement for Specification 3.8.2.1 and will take appropriate actions. | | Time From Present and T e of Test Control Grou ¹ October November December Jenuerlr 1 S N/A N/A . N/A |
| 0 1 E PVNGS will also initiate the following additional compensatory actions for Unit 2: 1.Maintenance limitations for important equipment:
| | .2 N/A, S N/A N/A 3 N/A N/A S N/A 4 N/A N/A N/A S Legend: S = Battery Service Test (performed to the bank A battery load profile) |
| PVNGS will use PRA to review all 125 VDC system and related auxiliaries corrective/preventative maintenance work.The need to perform long-term maintenance and achieve long-term availability of important-to-safety equipment will be balanced.Controls for electrical supply integrity PVNGS will issue a night order to the Unit 1 Control Room stating that Unit 2 offsite power supplies and associated 13.8 kV buses should not be interrupted. | | This testing is being performed to provide assurance that the degradation mechanism is primarily related to discharge/recharge cycling of the batteries and to demonstrate that the batteries in the unit are capable of meeting the design duty cycle. After each test, an evaluation of the performance of each group will be'performed using the following acceptance criteria: |
| Access to the switchyard will be limited.All emergent switchyard work will be reviewed by the Unit 1 Shift Supervisor. | | : 1. The control group results meet the bank A battery design duty cycle; and |
| Manual operation of the Auxiliary Feedwater. | | .2. No individual cell reversal occurs (<1.0 volts). |
| Pump Turbine and Atmospheric Dump Valves will be reviewed with the Unit 2 operators. | | The results of the tests will be used to verify the degradation model and will be provided to the NRC. |
| Increase the following battery testing to every other week for all cells.Testing will be staggered between trains.Parameter Limits/Allowable Actions to be Taken if Outside Limits Float Voltage Float Current>2.18 Volts<500 ma Avg of all connected cells>1.290 Specific Gravity>1.280 Battery Inoperable'attery Inoperable Restore within limits within 7 days Restore within limits within 7 days Not more than 0.020 below average of all connected cells Battery Inoperable Avg of all connected cells,>1.280 Battery Inoperable 1 h j f I l Mar in Calculation As discussed in the October 12, 1994, meeting the electrical load calculation for bank B battery will be completed by October 14, 1994.This action will ensure the bank A load profile is the worst-case profile.Root Cause Anal sis Disassembly and inspection of the remaining 2 cells at the CBD Facility will be'performed. | | If the above criteria 'are not met, the unit will enter the action statement for Specification 3.8.2.1 and will take appropriate actions. |
| Any significant findings from the root cause analysis, surveillance testing or any other source that invalidate APS'onclusion(s) will be promptly communicated with the NRC.Final results of the root cause analysis will be provided to the NRC.Additional Data As requested in the meeting and subsequent conversations, attached is the battery bank 2A design duty cycle load profile, the results of capacity discharge tests for 5 cells from battery bank 2A, and a list of the Unit 2 battery bank required capacities. | | |
| t I' Batter A Load Profile Step DU ration Corrected Load Load Cumulative Amp-Hr 515 184 298 I84 298 184 298 184 298 184 298 184 298 184 298 184 240 ocument 0 24 1 14 1 14 1 17 1 12 18 1 11 1 1 1 SOURCE: D 561.35 200.56 324.82 20Q.56 324.S2 200.56 324.82 200.56 324.82 200.56 324.82 20Q.56 324.82 20Q.56 324.82 200.56 261.60 2-EC-AK-207 9.36 80.22 5.41 46.80 5.4 I 46.8Q 5.41 56.83 5.41 40.11 5.41 60.17 5.41 36.77 5.41 3.34 4.36 9.36 89.58 94.99 141.79 147.20 194.00 199.42 256.24 261.65 301.77 307.18 367.35 372.76 409.53 414.94 418.29 422.65 | | 1 E 0 |
| : t.
| | |
| CAPACITY TEST FOR CE<LLS REMOVED FROM BATTERY 2A Cell Number 5 33 34 35 51 AVE<RAGE Battery 2A Cells Projected 10/10/94 Actual 62.3%50.0%40.2/0 56.7%57.1/0 61.7%46.7%51.7%58.1%57 3/0 52.9%55.5%6 From Projected-12.3%+16.5%+4.6%+5.0%-08+2.6% | | PVNGS will also initiate the following additional compensatory actions for Unit 2: |
| | : 1. Maintenance limitations for important equipment: |
| | PVNGS will use PRA to review all 125 VDC system and related auxiliaries corrective/preventative maintenance work. The need to perform long-term maintenance and achieve long-term availability of important-to-safety equipment will be balanced. |
| | Controls for electrical supply integrity PVNGS will issue a night order to the Unit 1 Control Room stating that Unit 2 offsite power supplies and associated 13.8 kV buses should not be interrupted. |
| | Access to the switchyard will be limited. All emergent switchyard work will be reviewed by the Unit 1 Shift Supervisor. |
| | Manual operation of the Auxiliary Feedwater. Pump Turbine and Atmospheric Dump Valves will be reviewed with the Unit 2 operators. |
| | Increase the following battery testing to every other week for all cells. |
| | Testing will be staggered between trains. |
| | Actions to be Parameter Limits/Allowable Taken if Outside Limits Float Voltage >2.18 Volts Battery Inoperable'attery Float Current <500 ma Inoperable Specific Gravity >1.280 Restore within limits within 7 days Avg of all connected Restore within limits within 7 days cells >1.290 Not more than 0.020 Battery Inoperable below average of all connected cells Avg of all connected Battery Inoperable cells, >1.280 |
| | |
| | 1 h |
| | j f |
| | I l |
| | |
| | Mar in Calculation As discussed in the October 12, 1994, meeting the electrical load calculation for bank B battery will be completed by October 14, 1994. This action will ensure the bank A load profile is the worst-case profile. |
| | Root Cause Anal sis Disassembly and inspection of the remaining 2 cells at the CBD Facility will be' performed. Any significant findings from the root cause analysis, surveillance testing or any other source that invalidate APS'onclusion(s) will be promptly communicated with the NRC. Final results of the root cause analysis will be provided to the NRC. |
| | Additional Data As requested in the meeting and subsequent conversations, attached is the battery bank 2A design duty cycle load profile, the results of capacity discharge tests for 5 cells from battery bank 2A, and a list of the Unit 2 battery bank required capacities. |
| | |
| | t I' Batter A Load Profile Step Corrected Cumulative DU ration Load Load Amp-Hr 515 561.35 9.36 9.36 24 184 200.56 80.22 89.58 1 298 324.82 5.41 94.99 14 I84 20Q.56 46.80 141.79 1 298 324.S2 5.4 I 147.20 14 184 200.56 46.8Q 194.00 1 298 324.82 5.41 199.42 17 184 200.56 56.83 256.24 1 298 324.82 5.41 261.65 12 184 200.56 40.11 301.77 298 324.82 5.41 307.18 18 184 20Q.56 60.17 367.35 1 298 324.82 5.41 372.76 11 184 20Q.56 36.77 409.53 1 298 324.82 5.41 414.94 1 184 200.56 3.34 418.29 1 240 261.60 4.36 422.65 SOURCE: Document 0 2-EC-AK-207 |
| | |
| | t. |
| | CAPACITY TEST FOR CE<LLS REMOVED FROM BATTERY 2A Battery 2A Cells Cell Number Projected 10/10/94 Actual 6 From Projected 5 62.3% 50.0% -12.3% |
| | 33 40.2/0 56.7% +16.5% |
| | 34 57.1/0 61.7% +4.6% |
| | 35 46.7% 51.7% +5.0% |
| | 51 58.1% 57 3/0 -08 AVE<RAGE 52.9% 55.5% +2.6% |
| | |
| | ~ |
| | ~ |
| | AMOUNT OF MANUFACTURER'S RATING REQUIRED TO MKKTTHK SAFETY-RELATED FUNCTIONS OF THK UNIT 2 BATTERY BANKS |
| | % OF MANUFACTURER'S RATING 55.2 49 4% |
| | 2C 33.6 30.1 |
| | * Preliminary value. Final value to be issued on 10/14/94, however "A" bank is the worst case profile. |
|
| |
|
| ~~AMOUNT OF MANUFACTURER'S RATING REQUIRED TO MKKT THK SAFETY-RELATED FUNCTIONS OF THK UNIT 2 BATTERY BANKS%OF MANUFACTURER'S RATING 55.2 49 4%2C 33.6 30.1*Preliminary value.Final value to be issued on 10/14/94, however"A" bank is the worst case profile.
| | il |
| il~.I 1 Ip l}}
| | ~ . I 1 |
| | Ip l}} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08
[Table view] |
Text
PR.IC3R.I EY' (ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9410190146 DOC.DATE: 94/10/12 NOTARIZED: NO DOCKET g FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH. NAME AUTHOR AFFILIATION LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards supplemental info in support of 941009 proposed i
amend to TS 3/4.8.2, "DC Sources Operating," submitted under emergency circumstances.
DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution L ENCL SIZE:
0 NOTES:Standardized plant. 05000529 R RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 HOLIAN, B 1 1 TRAN,L 1 1 INTERNAL: ACRS 6 6 LE CENT~0 1 1 NRR/DE/EELB 1 1 NRR/DRCH/HICB 1 1 NRR/DRPW 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D
0 C
U N
NOTE TO ALL"RIDS" RECIPIENTS:
PLEAsr I~EL> Us To Rr DUcr; ivASTE! cONTAc r I HF DOCI:-CLIENT cONTROL DESK, ROOM PI-37 (EXT. 504.0083 ) TO ELIihIINATEYOUR NAiIE FRO>I DISTRIBUTION LISTS I:OR DOCl'b,IEi'I'S YOI.'ON"I'LEI)I TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 19
~ I V
'd IJ
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 102-03147-JML/AKK/RJR JAMES M. LEVINE VICE PRESIOENT October 12, 1994 NUCLEAR PROOUCTION U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-37 Washington, D.C. 20555
Dear Sirs:
Reference:
Letter No. 102-03144, dated October 9, 1994, "Proposed Technical Specification Amendment to Specification 3/4.8.2, D.C. Sources, Under Emergency Circumstances"
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No. STN 50-529 Supplemental Information in Support of Proposed Technical Specification Amendment to Specification 3/4.8.2, D.C. Sources, Under Emergency Circumstances File: 94-056-026'4-005%19.05 Based upon a meeting held with NRC Staff on October 12, 1994, Arizona Public Service Company (APS) is providing the enclosed supplemental information in support of the proposed amendment to Technical Specification 3/4.8.2, D.C. Sources - Operating.
Should you have any questions, please contact Scott A. Bauer of my staff at (602) 393-5978.
Sincerely, JML/AKK/RJR/rv Enclosure cc: L. J. Callan (all w/enclosure)
K. E. Perkins B. E. Holian K. E. Johnston A. V. Godwin (ARRA)
I B.'0 89 1 94101'7I014b 941012 ADQCK 0500052'P PDR P? .......PDR
f c- f l
Lg Ee
ENCLOSURE SUPPLEMENTAL INFORMATION IN SUPPORT OF PROPOSED AMENDMENTTO TECHNICAL SPECIFICATION
. SECTION 3/4.8.2, D.C. SOURCES UNDER EMERGENCY CIRCUMSTANCES
~ V ENCLOSURE On October 12, 1994, a meeting was held with the NRC to discuss APS'ro'posed amendment to Technical Specification 3/4.8.2, D.C. Sources. In the meeting, and in telephone calls subsequent to the meeting, APS presented additional/revised compensatory measures to be implemented between now and the fifth refueling outage for Unit 2 in view of the degradation observed in the four battery banks. These additional/revised compensatory measures are described below..
h APS is replacing a combined total of 23 cells in the bank A and C batteries. The replaced cells will be used to form four control groups of 4 cells each. Testing of these four'roups will be performed at approximately 30 day intervals as follows:
Time From Present and T e of Test Control Grou ¹ October November December Jenuerlr 1 S N/A N/A . N/A
.2 N/A, S N/A N/A 3 N/A N/A S N/A 4 N/A N/A N/A S Legend: S = Battery Service Test (performed to the bank A battery load profile)
This testing is being performed to provide assurance that the degradation mechanism is primarily related to discharge/recharge cycling of the batteries and to demonstrate that the batteries in the unit are capable of meeting the design duty cycle. After each test, an evaluation of the performance of each group will be'performed using the following acceptance criteria:
- 1. The control group results meet the bank A battery design duty cycle; and
.2. No individual cell reversal occurs (<1.0 volts).
The results of the tests will be used to verify the degradation model and will be provided to the NRC.
If the above criteria 'are not met, the unit will enter the action statement for Specification 3.8.2.1 and will take appropriate actions.
1 E 0
PVNGS will also initiate the following additional compensatory actions for Unit 2:
- 1. Maintenance limitations for important equipment:
PVNGS will use PRA to review all 125 VDC system and related auxiliaries corrective/preventative maintenance work. The need to perform long-term maintenance and achieve long-term availability of important-to-safety equipment will be balanced.
Controls for electrical supply integrity PVNGS will issue a night order to the Unit 1 Control Room stating that Unit 2 offsite power supplies and associated 13.8 kV buses should not be interrupted.
Access to the switchyard will be limited. All emergent switchyard work will be reviewed by the Unit 1 Shift Supervisor.
Manual operation of the Auxiliary Feedwater. Pump Turbine and Atmospheric Dump Valves will be reviewed with the Unit 2 operators.
Increase the following battery testing to every other week for all cells.
Testing will be staggered between trains.
Actions to be Parameter Limits/Allowable Taken if Outside Limits Float Voltage >2.18 Volts Battery Inoperable'attery Float Current <500 ma Inoperable Specific Gravity >1.280 Restore within limits within 7 days Avg of all connected Restore within limits within 7 days cells >1.290 Not more than 0.020 Battery Inoperable below average of all connected cells Avg of all connected Battery Inoperable cells, >1.280
1 h
j f
I l
Mar in Calculation As discussed in the October 12, 1994, meeting the electrical load calculation for bank B battery will be completed by October 14, 1994. This action will ensure the bank A load profile is the worst-case profile.
Root Cause Anal sis Disassembly and inspection of the remaining 2 cells at the CBD Facility will be' performed. Any significant findings from the root cause analysis, surveillance testing or any other source that invalidate APS'onclusion(s) will be promptly communicated with the NRC. Final results of the root cause analysis will be provided to the NRC.
Additional Data As requested in the meeting and subsequent conversations, attached is the battery bank 2A design duty cycle load profile, the results of capacity discharge tests for 5 cells from battery bank 2A, and a list of the Unit 2 battery bank required capacities.
t I' Batter A Load Profile Step Corrected Cumulative DU ration Load Load Amp-Hr 515 561.35 9.36 9.36 24 184 200.56 80.22 89.58 1 298 324.82 5.41 94.99 14 I84 20Q.56 46.80 141.79 1 298 324.S2 5.4 I 147.20 14 184 200.56 46.8Q 194.00 1 298 324.82 5.41 199.42 17 184 200.56 56.83 256.24 1 298 324.82 5.41 261.65 12 184 200.56 40.11 301.77 298 324.82 5.41 307.18 18 184 20Q.56 60.17 367.35 1 298 324.82 5.41 372.76 11 184 20Q.56 36.77 409.53 1 298 324.82 5.41 414.94 1 184 200.56 3.34 418.29 1 240 261.60 4.36 422.65 SOURCE: Document 0 2-EC-AK-207
t.
CAPACITY TEST FOR CE<LLS REMOVED FROM BATTERY 2A Battery 2A Cells Cell Number Projected 10/10/94 Actual 6 From Projected 5 62.3% 50.0% -12.3%
33 40.2/0 56.7% +16.5%
34 57.1/0 61.7% +4.6%
35 46.7% 51.7% +5.0%
51 58.1% 57 3/0 -08 AVE<RAGE 52.9% 55.5% +2.6%
~
~
AMOUNT OF MANUFACTURER'S RATING REQUIRED TO MKKTTHK SAFETY-RELATED FUNCTIONS OF THK UNIT 2 BATTERY BANKS
% OF MANUFACTURER'S RATING 55.2 49 4%
2C 33.6 30.1
- Preliminary value. Final value to be issued on 10/14/94, however "A" bank is the worst case profile.
il
~ . I 1
Ip l