ML17313A695: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGUL RY XNFORMATION DISTRIBUTI SYSTEM (RIDS)DOCKET 05000528 05000529 05000530 ACCESSION NBR:9812020080 DOC.DATE: 98/11/23 NOTARXZED:
{{#Wiki_filter:REGUL     RY XNFORMATION     DISTRIBUTI       SYSTEM (RIDS)
NO FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi STN;50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi STN-50-530 Palo Verde Nuclear Station, Unit 3', Arizona Publi AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M.
ACCESSION NBR:9812020080           DOC.DATE:   98/11/23     NOTARXZED: NO                     DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN;50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3', Arizona Publi 05000530 AUTH. NAME           AUTHOR AFFILIATION LEVINE,J.M.         Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME           RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Informs that proposed TS amend originally committed to be submitted by 981130 is in approval process&.will be submitted by 981218.Commitments made by util are listed.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:
Informs that proposed TS amend originally committed to be submitted by 981130 is in approval process &. will be                                         A submitted by 981218.Commitments made by util are listed.
General Distribution NOTES: STANDARDIZED PLANT Standardized plant.Standardized plant.A T 05000528 05000529 0500053(P RECIPIENT ID CODE/NAME PD4-2 LA FIELDS,M COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL'NTERNAL:
T DISTRIBUTION CODE: A001D         COPIES RECEIVED:LTR           ENCL       SIZE:
ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 E NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT 1 1 1 1 1 D EXTERNAL: NOAC NRC PDR N NOTE TO ALL"RIDS" RECIPIENTS:
TITLE: OR Submittal: General Distribution NOTES: STANDARDIZED PLANT                                                                       05000528 Standardized plant.                                                                     05000529 Standardized plant.                                                                     0500053(P RECIPIENT             COPIES              RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL         ID CODE/NAME         LTTR PD4-2 LA                                PD4-2 PD FIELDS,M                                                                ENCL'NTERNAL:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL&
ACRS                                         E                    1 NRR/DE/ECGB/A                           NRR/DE/EMCB                1 NRR/DRCH/HICB                           NRR/DSSA/SPLB              1 NRR/DSSA/SRXB                            NUDOCS-ABSTRACT           1               1         D OGC/HDS2 EXTERNAL: NOAC                                     NRC PDR N
Palo Verde Nuclear Generating Station James M.Levine Senior Vice President Nuclear TEL (602)393-5300 FAX (602)393-6077 Mail Station 7602 P.O.Box 52034 Phoenix, AZ 65072-2034 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 102-04213-JML/SAB/RKR November 23, 1998
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               14   ENCL   &
 
James M. Levine       TEL (602)393-5300     Mail Station 7602 Palo Verde Nuclear        Senior Vice President FAX (602)393-6077     P.O. Box 52034 Generating Station        Nuclear                                    Phoenix, AZ 65072-2034 102-04213-JML/SAB/RKR November 23, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 Schedule for Submitting Revision to Proposed Amendment to Technical Specification 3/4.8.1.1, A.C.Sources-Operating In a July 10, 1998 submittal, APS committed to submit a revised degraded voltage technical specification amendment request by November 30, 1998.The proposed technical specification amendment is in the approval process and will be submitted by December 18, 1998.The following commitments are made in this letter: The proposed technical specification amendment will be submitted by December 18, 1998.Please contact Mr.Scott Bauer at (602)393-5978 if you have any questions or would like additional information regarding this matter.Sincerely, JML/SAB/RKR/rlh Cc: E.W.Merschoff M.B.Fields J.H.Moorman 98i2020080 98ii23 PDR ADOCK 05000528, p PDR J l II I t}}
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Schedule for Submitting Revision to Proposed Amendment to Technical Specification 3/4.8.1.1, A. C. Sources Operating In a July 10, 1998 submittal, APS committed to submit a revised degraded voltage technical specification amendment request by November 30, 1998. The proposed technical specification amendment is in the approval process and will be submitted by December 18, 1998.
The following commitments are made in this letter:
The proposed technical specification amendment will be submitted by December 18, 1998.
Please contact Mr. Scott Bauer at (602) 393-5978 if you have any questions or would like additional information regarding this matter.
Sincerely, JML/SAB/RKR/rlh Cc:     E. W. Merschoff M. B. Fields J. H. Moorman 98i2020080 98ii23 PDR     ADOCK 05000528, p                       PDR
 
J l
II I
t}}

Latest revision as of 07:39, 29 October 2019

Informs That Proposed TS Amend Originally Committed to Be Submitted by 981130 Is in Approval Process & Will Be Submitted by 981218.Commitments Made by Util Are Listed
ML17313A695
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/23/1998
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-04213-JML-S, 102-4213-JML-S, NUDOCS 9812020080
Download: ML17313A695 (3)


Text

REGUL RY XNFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:9812020080 DOC.DATE: 98/11/23 NOTARXZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN;50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3', Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Informs that proposed TS amend originally committed to be submitted by 981130 is in approval process &. will be A submitted by 981218.Commitments made by util are listed.

T DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES: STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 0500053(P RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR PD4-2 LA PD4-2 PD FIELDS,M ENCL'NTERNAL:

ACRS E 1 NRR/DE/ECGB/A NRR/DE/EMCB 1 NRR/DRCH/HICB NRR/DSSA/SPLB 1 NRR/DSSA/SRXB NUDOCS-ABSTRACT 1 1 D OGC/HDS2 EXTERNAL: NOAC NRC PDR N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL &

James M. Levine TEL (602)393-5300 Mail Station 7602 Palo Verde Nuclear Senior Vice President FAX (602)393-6077 P.O. Box 52034 Generating Station Nuclear Phoenix, AZ 65072-2034 102-04213-JML/SAB/RKR November 23, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Schedule for Submitting Revision to Proposed Amendment to Technical Specification 3/4.8.1.1, A. C. Sources Operating In a July 10, 1998 submittal, APS committed to submit a revised degraded voltage technical specification amendment request by November 30, 1998. The proposed technical specification amendment is in the approval process and will be submitted by December 18, 1998.

The following commitments are made in this letter:

The proposed technical specification amendment will be submitted by December 18, 1998.

Please contact Mr. Scott Bauer at (602) 393-5978 if you have any questions or would like additional information regarding this matter.

Sincerely, JML/SAB/RKR/rlh Cc: E. W. Merschoff M. B. Fields J. H. Moorman 98i2020080 98ii23 PDR ADOCK 05000528, p PDR

J l

II I

t