ML17313A755: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:I t
CATEGORY 1 REGULATORY INFORMATION DISTRIBUTIO              SYSTEM (RIDS)
A
                                                                                                    ¹ e
ACCESSION NBR':9901210373            DOC.DATE:    99/01/11      NOTARIZED: NO            DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station,                Unit 1, Arizona Publi        05000528 STN-50-529 Palo Verde Nuclear Station,              Unit 2, Arizona Publi        05000529 STN-50-530 Palo Verde Nuclear Station,              Unit 3, Arizona Publi        05000530 AUTH. NAME            AUTHOR AFFILIATION IDE,W.E.              Arizona Public Service Co.          (formerly Arizona Nuclear      Power RECIP.NAME            RECIPIENT AFFILIATION Records Management Branch        (Document Control Desk)
C
 
==SUBJECT:==
Forwards proprietary missing page in 981211 ltr re charging sys commitments. Proprietary encl withheld,per                                          A 10CFR2.790 (b) (1)    .
T DISTR1BUTION CODE: APOID          COPIES RECEIVED:LTR      1  ENCL  i SIZE: 2 4 TITLE: Proprietary Review Distribution - Pre Operating License 5 Operating !8 NOTES:STANDARDIZED PLANT                                                                0500052$
Standardized plant.                                                              05000529 Standardized plant.                                                              05000538 RECIPIENT            COPIES              RECIPIENT            COPIES ID  CODE/NAME          LTTR ENCL        ID  CODE/NAME        LTTR ENCL PD4-2 LA                  1    1      PD4-2 PD                  1      1 FIELDS,M                  1    1 INTERNAL: ACRS                        1    1          LE CENTER              1      1 OGC/HDS2                  1    0 EXTERNAL: NRC PDR                                                                                    D 8
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                7  ENCL
 
4 1
 
Commitment.Tnnmsaw. &npy.
William E. Ide                                              Mail Station 7605 Palo Verde Nuclear              Vice President                      TEL 602/3934116        P.O. Box 52034 Generating Station              Nuclear Engineering                FAX 602/393-6077        Phoenix, AZ 85072-2034 102-04231-WEI/SAB/GAM U. S. Nuclear Regulatory Commission                                                January 11, 1999 ATl N: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
 
==Reference:==
Letter no. 102-04220-JML/SAB/GAM dated December 11, 1998, from J. M.
Levine, APS to NRC "Responses to September 8, 1998 NRC Request for Additional Information Regarding Charging System Commitments for the Palo Verde Nuclear Generating Station"
 
==Dear Sirs:==
 
I'ubject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3 Docket Nos. STN 50-528/529/530 INissing Page in December 11, 1998 Letter Regarding Charging System Commitments It has been identified that page number 18 of 92 was inadvertently omitted from Attachment 2 (ABB-CE Report 27-AS95-DB-001, Revision 00, December 20, 1995) of the reference letter due to a'copying erroi;" Enclosed is the missing page. Please note that the enclosed page contains information proprietary to ABB Combustion Engineering, as did Attachment 2 of the referenced letter. The affidavit included with Attachment 2 of the referenced letter establishing the basis on which the information should be withheld from public disclosure in accordance with 10 CFR 2.790(b)(1) also applies to the enclosed page 18 of 92. Accoidingly, it is requested that the attached page be withheld from public disclosure in accordance with 10 CFR 2:790(b)(1).
No commitments are being made to the NRC by this letter.
Should you have any questions, please contact Scott A. Bauer at (602) 393-5978.
Sincerely, 990i2i0373 'tl90iii                      ~l PDR        ADOCK      05000528          j P      ,                    PDR
            'I WEI/SAB/GAM/rlh            .  "    ""  Ij-'-~i-"-:.~i".L. 9;,.;,    ~ -= ..-
t,.
cc:      E. W. Merschoff            'without enclosure)
M. B. Fields                (with enclosure)                        Ij'p P-        i J. H. Moorman                (without enclosure)
 
J l'
I
 
Enclosure Page 18 of 92 of the Engineering Study 27-AS95-DB-001, Revision 00, December 20, 1995 PROPRIETARY (Affidavit Provided with Letter 102-04220-JML/SAB/GAM, dated December 11, 1998)}}

Latest revision as of 07:38, 29 October 2019

Forwards Proprietary Missing Page in 981211 Ltr Re Charging Sys Commitments.Proprietary Encl Withheld,Per 10CFR2.790(b)(1)
ML17313A755
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/11/1999
From: Ide W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17313A757 List:
References
102-04231-WEI-S, 102-4231-WEI-S, NUDOCS 9901210373
Download: ML17313A755 (6)


Text

I t

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTIO SYSTEM (RIDS)

A

¹ e

ACCESSION NBR':9901210373 DOC.DATE: 99/01/11 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION IDE,W.E. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

C

SUBJECT:

Forwards proprietary missing page in 981211 ltr re charging sys commitments. Proprietary encl withheld,per A 10CFR2.790 (b) (1) .

T DISTR1BUTION CODE: APOID COPIES RECEIVED:LTR 1 ENCL i SIZE: 2 4 TITLE: Proprietary Review Distribution - Pre Operating License 5 Operating !8 NOTES:STANDARDIZED PLANT 0500052$

Standardized plant. 05000529 Standardized plant. 05000538 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 FIELDS,M 1 1 INTERNAL: ACRS 1 1 LE CENTER 1 1 OGC/HDS2 1 0 EXTERNAL: NRC PDR D 8

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 7 ENCL

4 1

Commitment.Tnnmsaw. &npy.

William E. Ide Mail Station 7605 Palo Verde Nuclear Vice President TEL 602/3934116 P.O. Box 52034 Generating Station Nuclear Engineering FAX 602/393-6077 Phoenix, AZ 85072-2034 102-04231-WEI/SAB/GAM U. S. Nuclear Regulatory Commission January 11, 1999 ATl N: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Reference:

Letter no. 102-04220-JML/SAB/GAM dated December 11, 1998, from J. M.

Levine, APS to NRC "Responses to September 8, 1998 NRC Request for Additional Information Regarding Charging System Commitments for the Palo Verde Nuclear Generating Station"

Dear Sirs:

I'ubject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3 Docket Nos. STN 50-528/529/530 INissing Page in December 11, 1998 Letter Regarding Charging System Commitments It has been identified that page number 18 of 92 was inadvertently omitted from Attachment 2 (ABB-CE Report 27-AS95-DB-001, Revision 00, December 20, 1995) of the reference letter due to a'copying erroi;" Enclosed is the missing page. Please note that the enclosed page contains information proprietary to ABB Combustion Engineering, as did Attachment 2 of the referenced letter. The affidavit included with Attachment 2 of the referenced letter establishing the basis on which the information should be withheld from public disclosure in accordance with 10 CFR 2.790(b)(1) also applies to the enclosed page 18 of 92. Accoidingly, it is requested that the attached page be withheld from public disclosure in accordance with 10 CFR 2:790(b)(1).

No commitments are being made to the NRC by this letter.

Should you have any questions, please contact Scott A. Bauer at (602) 393-5978.

Sincerely, 990i2i0373 'tl90iii ~l PDR ADOCK 05000528 j P , PDR

'I WEI/SAB/GAM/rlh . " "" Ij-'-~i-"-:.~i".L. 9;,.;, ~ -= ..-

t,.

cc: E. W. Merschoff 'without enclosure)

M. B. Fields (with enclosure) Ij'p P- i J. H. Moorman (without enclosure)

J l'

I

Enclosure Page 18 of 92 of the Engineering Study 27-AS95-DB-001, Revision 00, December 20, 1995 PROPRIETARY (Affidavit Provided with Letter 102-04220-JML/SAB/GAM, dated December 11, 1998)