ML17333A193: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 08/27/1993
| issue date = 08/27/1993
| title = Forwards fitness-for Duty Program Semiannual Performance Rept for Period of Jan-June 1993
| title = Forwards fitness-for Duty Program Semiannual Performance Rept for Period of Jan-June 1993
| author name = LEVINE J M
| author name = Levine J
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.ACCELERAT~DOCUMENT DISmIQVTION SYSTEM REGULA Z INFORMATION DISTRIBUTIO YSTEM (RIDS)ACCE'SSION NBR:9309080255 DOC.DATE: 93/08/27 NOTARIZED:
{{#Wiki_filter:. ACCELERAT ~ DOCUMENT DISmIQVTION SYSTEM REGULA     Z   INFORMATION DISTRIBUTIO         YSTEM   (RIDS)
NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit'1, Arizona Publi 05000528 STN-,)'0-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M.
ACCE'SSION NBR:9309080255             DOC.DATE:     93/08/27   NOTARIZED: NO         DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit'1, Arizona Publi 05000528 STN-,)'0-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME             AUTHOR AFFILIATION LEVINE,J.M.             Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME             RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)                       I
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)I  


==SUBJECT:==
==SUBJECT:==
Forwards fitness-for duty program semiannual performance rept for period of Jan-June 1993.DISTRIBUTION CODE: A021D COPIES RECEIVED:LTR ENCL SIZE: TITLE: "Semiannual Pitness for Duty Program Performance Rept/Data" NOTES:STANDARDIZED PLANT Standardized plant.Standardized plant.D 10CFR26.7 I 05000528 05000529 05000530 RECIPIENT ID CODE/NAME PDV PD TRAN,L INTERNAL: ACRS NUDOCS-ABSTRACT RGN5.02 EXTERNAL: NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT, ID CODE/NAME TRAMMELL,C NRR/DRSS/PSGB Ol NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D D D NOTE TO ALL eRIDS" RECIPIENTS:
Forwards     fitness-for duty       program semiannual performance                 D rept for period of Jan-June 1993.
PLEASE HELP US TO REDUCE WASTE!CON1'ACI'HE DOCUMENT CON1'ROL DESK, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DIS I'RIBUT!ON I.ISTS FOR DOCUMENTS YOU DON'T NEED!D TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 JAMES M.LEVINE VICE PRESIDENT NUCLEAR PRODUCTION 10 CFR 26.71(d)Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O.BOX 52034~PHOENIX, ARIZONA 85072-2034 102-02621-JML/TRB/8EC August 27, 1993 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, D.C.20555  
DISTRIBUTION CODE: A021D             COPIES RECEIVED:LTR         ENCL       SIZE:
TITLE: "Semiannual Pitness           for Duty   Program Performance     Rept/Data" 10CFR26.7 I
NOTES:STANDARDIZED PLANT                                                               05000528 Standardized plant.                                                           05000529 Standardized plant.                                                           05000530 RECIPIENT             COPIES              RECIPIENT,          COPIES ID CODE/NAME            LTTR ENCL        ID CODE/NAME         LTTR ENCL          D PDV PD                       1      1      TRAMMELL,C              1    1 TRAN,L                       1      1 INTERNAL: ACRS                           1     1     NRR/DRSS/PSGB           1    1 NUDOCS-ABSTRACT              1      1                      Ol       1     1 RGN5        .      02        1     1 EXTERNAL: NRC PDR                        1     1     NSIC                    1     1 D
D D
NOTE TO ALLeRIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CON1'ACI'HE DOCUMENT CON1'ROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DIS I'RIBUT!ON I.ISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 10   ENCL     10
 
10 CFR 26.71(d)
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA 85072-2034 102-02621-JML/TRB/8EC JAMES M. LEVINE                                                  August 27, 1993 VICE PRESIDENT NUCLEAR PRODUCTION U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, D.C. 20555


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 Fitness-for-Duty Program Semiannual Performance Report File: 93-056-026 93-001-703 Arizona Public Service Company hereby provides as an enclosure to this letter the Fitness-for-Duty Program Semiannual Performance Report for the reporting period of January 1993 through June 1993.Should you have any questions, please contact Thomas R.Bradish at (602)393-5421.Sincerely, JML/TRB/8EC/rv Enclosure cc: W.F.Conway B.H.Faulkenberry L.L.Bush J.A.Sloan (all w/enclosure) gvpog7 9309080255 930827 PDR ADQCN 05000528 R , PDR IV~a<1 ENCLOSURE ARIZONA PUBLIC SERVICE COMPANY FITNESS-FOR-DUTY PROGRAM SEMIANNUAL PERFORMANCE REPORT JANUARY 1993 THROUGH JUNE 1993
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Fitness-for-Duty Program Semiannual Performance Report File: 93-056-026 93-001-703 Arizona Public Service Company hereby provides as an enclosure to this letter the Fitness-for-Duty Program Semiannual Performance Report for the reporting period of January 1993 through June 1993.
Should you have any questions, please contact Thomas R. Bradish at (602) 393-5421.
Sincerely, JML/TRB/8EC/rv Enclosure cc:     W. F. Conway         (all w/enclosure)
B. H. Faulkenberry L. L. Bush J. A. Sloan gvpog7 9309080255 930827 PDR     ADQCN 05000528 R     ,               PDR


Introduction The Arizona Public Service Company (APS)Fitness-for-Duty (FFD)Program continues to demonstrate success in its mission to maintain a drug-free workplace.
IV
During the reporting period, APS performed 3,258 drug and alcohol tests.Of these tests, 1,919 were administered on a random basis.This constitutes an equivalent annual random testing rate slightly in excess of 107 percent.The percentage of confirmed positive random drug and alcohol tests remains approximately the same as in the previous two reporting periods.Of the 1,919 random drug and alcohol tests conducted during this reporting period, APS attained a confirmed.positive rate of 0.26 percent.APS attributes its success in attaining this low confirmed positive rate to the continuing efforts in the area of awareness training and communications.
    ~a <
Anal sis of Pro ram Results The confirmed positive drug test results for this reporting period by type of test and type of drug are summarized in Tables 1 and 2, respectively, and are discussed below: Pre-Access Testin: Marijuana Alcohol Amphetamines 6 2 2 Total: 10 confirmed positive test results Comments: A total of 1,248 individuals were tested during pre-access screening.
1
The two individuals who registered a positive test for alcohol were within the category of APS employees.
 
One was a current APS employee who was applying for access to the Protected Area, and the other was a candidate for employment.
ENCLOSURE ARIZONA PUBLIC SERVICE COMPANY FITNESS-FOR-DUTY PROGRAM SEMIANNUALPERFORMANCE REPORT JANUARY 1993 THROUGH JUNE 1993
The individual who applied for access to the Protected-Area was suspended for forty hours, referred to the company's Employee Assistance Program, and placed in the Follow-Up Program.The offer of employment to the other individual was withdrawn.
 
All others registering positive test results were short-term contractors.
Introduction The Arizona Public Service Company (APS) Fitness-for-Duty (FFD) Program continues to demonstrate success in its mission to maintain a drug-free workplace. During the reporting period, APS performed 3,258 drug and alcohol tests. Of these tests, 1,919 were administered on a random basis. This constitutes an equivalent annual random testing rate slightly in excess of 107 percent.
1 of 4 1 For-Cause Testin includin ost accident and observed behavior: Marijuana Alcohol 2 2 Total: 4 confirmed positive test results Comments: APS tested 40 individuals within the observed behavior category during this reporting period.Reasons for testing included: suspected adulteration of urine specimens, odor of alcohol on individuals, and behavioral observations.
The percentage of confirmed positive random drug and alcohol tests remains approximately the same as in the previous two reporting periods. Of the 1,919 random drug and alcohol tests conducted during this reporting period, APS attained a confirmed     .
positive rate of 0.26 percent. APS attributes its success in attaining this low confirmed positive rate to the continuing efforts in the area of awareness training and communications.
Anal sis of Pro ram Results The confirmed positive drug test results for this reporting period by type of test and type of drug are summarized in Tables 1 and 2, respectively, and are discussed below:
Pre-Access Testin:
Marijuana               6 Alcohol                 2 Amphetamines           2 Total:                 10 confirmed positive test results Comments: A total of 1,248 individuals were tested during pre-access screening.
The two individuals who registered a positive test for alcohol were within the category of APS employees. One was a current APS employee who was applying for access to the Protected Area, and the other was a candidate for employment.
The individual who applied for access to the Protected-Area was suspended for forty hours, referred to the company's Employee Assistance Program, and placed in the Follow-Up Program. The offer of employment to the other individual was withdrawn. All others registering positive test results were short-term contractors.
1 of 4
 
1 For-Cause Testin     includin   ost accident and observed behavior:
Marijuana               2 Alcohol                 2 Total:                 4 confirmed positive test results Comments: APS tested 40 individuals within the observed behavior category during this reporting period. Reasons for testing included: suspected adulteration of urine specimens, odor of alcohol on individuals, and behavioral observations.
All four individuals who registered positive test results were short-term contractor personnel.
All four individuals who registered positive test results were short-term contractor personnel.
~Rd d Marijuana Alcohol Amphetamines g*1 2*Total: 6 confirmed positive test results involving five individuals
~Rd     d Marijuana               g*
*One individual registered a confirmed positive test result for both marijuana and amphetamines.
Alcohol                1 Amphetamines            2*
Comments: APS tested 1,919 individuals who were randomly selected for drug and alcohol testing during this reporting period.This constituted an equivalent annual testing rate slightly in excess of 107 percent.Of the five individuals who registered a positive test result, four were APS employees and one was a short-term contractor.
Total:                 6 confirmed positive test results involving five individuals
Follow-U Testin: A total of 48 tests were performed as part of the APS Follow-Up Testing Program during this reporting period;all tests were negative.At the end of the reporting period, five individuals are being monitored by the Follow-Up Testing Program.2of4  
* One individual registered a confirmed positive test result for both marijuana and amphetamines.
Comments: APS tested 1,919 individuals who were randomly selected for drug and alcohol testing during this reporting period. This constituted an equivalent annual testing rate slightly in excess of 107 percent. Of the five individuals who registered a positive test result, four were APS employees and one was a short-term contractor.
Follow-U   Testin:
A total of 48 tests were performed as part of the APS Follow-Up Testing Program during this reporting period; all tests were negative. At the end of the reporting period, five individuals are being monitored by the Follow-Up Testing Program.
2of4


APS experienced two violations involving the alcohol prohibition policy during this reporting period.Both individuals were short-term contractor personnel.
APS experienced two violations involving the alcohol prohibition policy during this reporting period. Both individuals were short-term contractor personnel. One individual violated the five-hour abstention requirement. The other individual brought four bottles of beer onto the site. In both cases, a joint investigation was conducted by the APS Corporate Security investigators assigned to PVNGS, and the Fitness-for-Duty Supervisor. In both cases, access to both the Protected Area and to the site was revoked.
One individual violated the five-hour abstention requirement.
A short-term contractor was asked to submit to a For Cause test because of unusual behavior observed by his management. The individual refused to submit
The other individual brought four bottles of beer onto the site.In both cases, a joint investigation was conducted by the APS Corporate Security investigators assigned to PVNGS, and the Fitness-for-Duty Supervisor.
        'to testing. As a result, the individual's site access was revoked and he was directed to return to his employer. The individual did not have access to the Protected Area.
In both cases, access to both the Protected Area and to the site was revoked.A short-term contractor was asked to submit to a For Cause test because of unusual behavior observed by his management.
Two other individuals were tested within this category due to a positive test for opiates. The Medical Review Officer (MRO) determined that the positive test was related to poppy seed consumption. The APS policy requires that an individual, who is suspected of testing positive due to poppy seed consumption, refrain from consuming poppy seeds for ten days. During the ten-day period, the individual is required to submit to drug and alcohol testing. In the instances cited, the individuals were tested within the ten-day period and test results were negative.
The individual refused to submit'to testing.As a result, the individual's site access was revoked and he was directed to return to his employer.The individual did not have access to the Protected Area.Two other individuals were tested within this category due to a positive test for opiates.The Medical Review Officer (MRO)determined that the positive test was related to poppy seed consumption.
No actions are taken by APS based on presumptive positive test results until confirmed by the MRO. In each case of a confirmed positive (illegal) drug test result, an APS employee's Protected Area access and site access are terminated. APS employees who register a confirmed positive test result for illegal drugs are discharged from employment.
The APS policy requires that an individual, who is suspected of testing positive due to poppy seed consumption, refrain from consuming poppy seeds for ten days.During the ten-day period, the individual is required to submit to drug and alcohol testing.In the instances cited, the individuals were tested within the ten-day period and test results were negative.No actions are taken by APS based on presumptive positive test results until confirmed by the MRO.In each case of a confirmed positive (illegal)drug test result, an APS employee's Protected Area access and site access are terminated.
APS employees who experience a single occurrence with a confirmed positive test result for alcohol receive a disciplinary suspension, evaluation, and treatment prior, to reinstatement of unescorted Protected Area access. In addition, these individuals are placed in a follow-up testing program. Contractor personnel who register a confirmed positive test result for illegal drugs or alcohol have their Protected Area and site access terminated.
APS employees who register a confirmed positive test result for illegal drugs are discharged from employment.
~P<<         ~
APS employees who experience a single occurrence with a confirmed positive test result for alcohol receive a disciplinary suspension, evaluation, and treatment prior, to reinstatement of unescorted Protected Area access.In addition, these individuals are placed in a follow-up testing program.Contractor personnel who register a confirmed positive test result for illegal drugs or alcohol have their Protected Area and site access terminated.
APS is continuing its communication efforts to enhance employee awareness of the FFD and Employee Assistance Program, with an emphasis on employee involvement.
~P<<~APS is continuing its communication efforts to enhance employee awareness of the FFD and Employee Assistance Program, with an emphasis on employee involvement.
3of4
3of4 (1
A Radiation'rotection technician accompanied a member of the FFD Staff to the APS primary Department of Health and Human Services certified laboratory in March.The purpose of the visit was to provide an overview of the analytical testing process and the controls used to protect the chain of custody.The technician also visited with a representative of the laboratory to discuss the testing process and other related issues.With the assistance of FFD personnel, the technician will develop a presentation for frontline employees.
Four individuals appealed their test determination during this reporting period.The Appeals Board reviewed the relevant material and upheld the original determination in all cases.APS determined that, due to a human error, an NRC contract individual (DOE employee)was not subjected to a pre-access test prior to being granted access to the PVNGS Protected and Vital Areas.Protected and Vital Area access was withdrawn the following day upon discovery of the error, and the individual completed pre-access testing prior to access being reinstated.
Changes have been implemented during this reporting period to ensure that all individuals in this category are included in the PVNGS program when so requested by the NRC.Summa of Pro ram Chan es No program changes were implemented during this reporting period.Re ortable Events On January 27, 1993, an APS foreman registered a confirmed positive test for marijuana.
An investigation was conducted jointly by the APS Corporate Security investigators assigned to PVNGS, and the Fitness-for-Duty Supervisor.
As a result of the investigation, the individual's access to the Protected Area and to the site, as well as the individual's employment, were terminated.
The individual appealed the determination.
The Appeals Board reviewed all materials relevant to the individual's case and upheld the original determination.
Planned Actions A trailer designed specifically for specimen collection and alcohol testing is being installed next to the main Fitness-for-Duty facility.The trailer will allow Fitness-for-Duty personnel to process a larger number of individuals for outage periods.Specimens will not be stored in the trailer.4of4


Table 1 Fitness-For-Duty Program Performance Data Personnel Subject to 10 CFR Part 26 V
( 1 A Radiation'rotection technician accompanied a member of the FFD Staff to the APS primary Department of Health and Human Services certified laboratory in March. The purpose of the visit was to provide an overview of the analytical testing process and the controls used to protect the chain of custody. The technician also visited with a representative of the laboratory to discuss the testing process and other related issues.
Fitness for Duty Program Performance Data Personnel Subject to 10CRF26 Arizona Public Service Company (APS)Company June 30, 1993 e months ending Palo Verde Nuclear Generating Station (PVNGS)Location David N.Heler/Mary F.Maddix Contaot Norns (602)393-7465 Phono ttnclods ataa coda)Cutoffs: Screen/Confirmation (ng/ml)Q Appendix A to 10CFR 26 Marijuana 20/15 Amphetamines 300/300 Benzodiazepines 200/200 Cocaine 0piates 300/150 300/300 Phencyclidine 25/25 Alcohol (%BAC)0.04%Barbiturates 200/200: Tes'tIii'g.'!
With the assistance of FFD personnel, the technician will develop a presentation for frontline employees.
Re's'ult's'icen'see".Emplo'yees':.:
Four individuals appealed their test determination during this reporting period. The Appeals Board reviewed the relevant material and upheld the original determination in all cases.
L'onng-'Tesriii:"'"'"'-'-"'"""':
APS determined that, due to a human error, an NRC contract individual (DOE employee) was not subjected to a pre-access test prior to being granted access to the PVNGS Protected and Vital Areas. Protected and Vital Area access was withdrawn the following day upon discovery of the error, and the individual completed pre-access testing prior to access being reinstated. Changes have been implemented during this reporting period to ensure that all individuals in this category are included in the PVNGS program when so requested by the NRC.
'"::"'-"-'"Sh'o'r't-Te'ram:":::
Summa      of Pro ram Chan es No program changes were implemented during this reporting period.
"'"'."':": ':Cont(ac'to'r.'-'.Pe'r's'onnel;:
Re ortable Events On January 27, 1993, an APS foreman registered a confirmed positive test for marijuana.
""Contract'o'r'::Pe'rsonn'el'":
An investigation was conducted jointly by the APS Corporate Security investigators assigned to PVNGS, and the Fitness-for-Duty Supervisor. As a result of the investigation, the individual's access to the Protected Area and to the site, as well as the individual's employment, were terminated. The individual appealed the determination. The Appeals Board reviewed all materials relevant to the individual's case and upheld the original determination.
Average Number with Unescorted Access 2534 n/a 1047::::,Cate'g'o'iIe's,'::..:.:..;,:..",',:::..:,:.,.::,','.;,,'.,.:,',':;::.::I,',,.",;,.:,, I:: 'ested,.':;:-.';.;.:
Planned Actions A trailer designed specifically for specimen collection and alcohol testing is being installed next to the main Fitness-for-Duty facility. The trailer will allow Fitness-for-Duty personnel to process a larger number of individuals for outage periods. Specimens will not be stored in the trailer.
I:;tPositIv'el::"::,;Tested I:".".;:.P,,o'sitiv'e":,:.:'.:,.''.,.
4of4
I.:.:'-;;;::.:.;Tes'te'd;",;':
 
.".'".A':.:r,t
Table 1 Fitness-For-Duty Program Performance Data Personnel Subject to 10 CFR Part 26
'".k:;:-,':-''Po's'itiv'e:.':
 
Pre-Access 140 N/A N/A 1108!For.::C'ause.;:
V Fitness for Duty Program Performance Data Personnel Subject to 10CRF26 Arizona Public Service Company (APS)                                                                                                             June 30, 1993 Company                                                                                                      e months ending Palo Verde Nuclear Generating                                     Norns      Station (PVNGS)
Post accident Observed behavior 0 25 0 0 N/A N/A N/A N/A 0 15 0 Random 1533 N/A N/A 386 Follow-up 13 0 N/A N/A 35 0 Other 0 N/A N/A Total 1713 N/A N/A 1545 14 Rev.1/92 Table 2 Breakdown of Confirmed Positive Tests for Specific Substances  
Location David N. Heler / Mary F. Maddix                                                                                                       (602) 393-7465 Contaot                                                                                                Phono ttnclods ataa coda)
~~
Cutoffs: Screen/Confirmation (ng/ml)                                                                 Q       Appendix A to 10CFR 26 Marijuana                         20 / 15                                           Amphetamines                         300 / 300                       Benzodiazepines                                 200 / 200 Cocaine                         300 / 150                                           Phencyclidine                         25 / 25                       Barbiturates                                    200 / 200 0piates                          300 / 300                                          Alcohol (% BAC)                       0.04%
L'onng-'Tesriii:"'"'"'-'-"'"""': '"::"'-"-'"Sh'o'r't-Te'ram:"::: "                             '"'."':"
: Tes'tIii'g.'!  Re's'ult's'icen'see".Emplo'yees':.:                                                                                        : ':Cont(ac'to'r.'-'.Pe'r's'onnel;:                 " "Contract'o'r'::Pe'rsonn'el'":
Average Number with Unescorted Access                                                                                                   2534                                   n/a                                                         1047
                                                                                                                                                                                                                                  .".'".A':.:r,t '".
::::,Cate'g'o'iIe's,'::..:.:..;,:..",',:::..:,:.,.::,','.;,,'.,.:,',':;::.::I,',,.",;,.:,,     I:: 'ested,.':;:-.';.;.: I:;tPositIv'el::" ::,;Tested   I:".".; :.P,,o'sitiv'e":,:.:'.:,.''.,. I.:.:'-;;;::.:.;Tes'te'd;",;': k:;:-,':-''Po's'itiv'e:.':
Pre-Access                                                                                               140                                     N/A                   N/A                               1108
      !For.               Post accident                                                                      0                    0                N/A                  N/A                                    0                            0
::C'ause.;:
Observed behavior                                                                 25                   0               N/A                   N/A                                   15 Random                                                                                                 1533                                     N/A                   N/A                                 386 Follow-up                                                                                               13                   0               N/A                   N/A                                   35                           0 Other                                                                                                                           0               N/A                   N/A Total                                                                                                   1713                                     N/A                   N/A                               1545                           14 Rev. 1/92
 
Table 2 Breakdown of Confirmed Positive Tests for Specific Substances
 
~ ~
Breakdown of Confirmed Positive Tests for Specific Substances
Breakdown of Confirmed Positive Tests for Specific Substances
~>,,Cocaine'.".;
:..""-.';-::;::;"':<',k'":,'.::::.,";:Am'phe.=,;:::;::,;':Phency.''.":.:                                                       ',:Borblt;.;~
i:..""-.';-::;::;"':<',k'":,'.::::.,";:Am'phe.=,;:::;::,;':
                                    ~>,,Cocaine'.".; i "';0'plates,::i.;.. ':::"'ltamInes-ii:.:.:,:,iridine!j''i                 i'lcohol .," :,:!:,',to tTe st+i'. 'j,','ze plriii:P~ :;!'iurotes s Ucensee Employees                         0                       0                                                 0                                   0                   0               0     0 0 0 Long-Term Contractors          0         0                       0                         0                     0               0                   0                   0               0     0 0 0 Short-Term Contractors                    0                       0                                                 0                                                       0               0     0 0 0       A Total                      7 "/11'        0                       0                         4k ~                    0                                                       0               0     0 0 0 17 ~ /P1~ ~
Phency.''.":.:
NOTES:
"';0'plates,::i.;..
For those results reported in a split box, the number on the left side records the number of confirmed positive tests reported on the basis of the NRC cut-off level, while the number on the right side records the number of confirmed positive tests reported on the basis of the more restrictive APS cut-off level.
':::"'ltamInes-ii:.:.:,:,iridine!j''i i'lcohol.,":,:!:,',to tTe st+i'.'j,','ze plriii:P~',:Borblt;.;~
One individual tested positive for two drugs (amphetamines and marijuana)
:;!'iurotes s Ucensee Employees Long-Term Contractors Short-Term Contractors Total 0 7"/11'0 0 0 0 0 0 0 0 0 4k~0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 A 17~/P1~~NOTES: For those results reported in a split box, the number on the left side records the number of confirmed positive tests reported on the basis of the NRC cut-off level, while the number on the right side records the number of confirmed positive tests reported on the basis of the more restrictive APS cut-off level.One individual tested positive for two drugs (amphetamines and marijuana) 0}}
 
0}}

Latest revision as of 12:25, 22 October 2019

Forwards fitness-for Duty Program Semiannual Performance Rept for Period of Jan-June 1993
ML17333A193
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/27/1993
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-02621-JML-T, 102-2621-JML-T, NUDOCS 9309080255
Download: ML17333A193 (19)


Text

. ACCELERAT ~ DOCUMENT DISmIQVTION SYSTEM REGULA Z INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCE'SSION NBR:9309080255 DOC.DATE: 93/08/27 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit'1, Arizona Publi 05000528 STN-,)'0-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) I

SUBJECT:

Forwards fitness-for duty program semiannual performance D rept for period of Jan-June 1993.

DISTRIBUTION CODE: A021D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: "Semiannual Pitness for Duty Program Performance Rept/Data" 10CFR26.7 I

NOTES:STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT, COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PDV PD 1 1 TRAMMELL,C 1 1 TRAN,L 1 1 INTERNAL: ACRS 1 1 NRR/DRSS/PSGB 1 1 NUDOCS-ABSTRACT 1 1 Ol 1 1 RGN5 . 02 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALLeRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CON1'ACI'HE DOCUMENT CON1'ROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DIS I'RIBUT!ON I.ISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

10 CFR 26.71(d)

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA 85072-2034 102-02621-JML/TRB/8EC JAMES M. LEVINE August 27, 1993 VICE PRESIDENT NUCLEAR PRODUCTION U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, D.C. 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Fitness-for-Duty Program Semiannual Performance Report File: 93-056-026 93-001-703 Arizona Public Service Company hereby provides as an enclosure to this letter the Fitness-for-Duty Program Semiannual Performance Report for the reporting period of January 1993 through June 1993.

Should you have any questions, please contact Thomas R. Bradish at (602) 393-5421.

Sincerely, JML/TRB/8EC/rv Enclosure cc: W. F. Conway (all w/enclosure)

B. H. Faulkenberry L. L. Bush J. A. Sloan gvpog7 9309080255 930827 PDR ADQCN 05000528 R , PDR

IV

~a <

1

ENCLOSURE ARIZONA PUBLIC SERVICE COMPANY FITNESS-FOR-DUTY PROGRAM SEMIANNUALPERFORMANCE REPORT JANUARY 1993 THROUGH JUNE 1993

Introduction The Arizona Public Service Company (APS) Fitness-for-Duty (FFD) Program continues to demonstrate success in its mission to maintain a drug-free workplace. During the reporting period, APS performed 3,258 drug and alcohol tests. Of these tests, 1,919 were administered on a random basis. This constitutes an equivalent annual random testing rate slightly in excess of 107 percent.

The percentage of confirmed positive random drug and alcohol tests remains approximately the same as in the previous two reporting periods. Of the 1,919 random drug and alcohol tests conducted during this reporting period, APS attained a confirmed .

positive rate of 0.26 percent. APS attributes its success in attaining this low confirmed positive rate to the continuing efforts in the area of awareness training and communications.

Anal sis of Pro ram Results The confirmed positive drug test results for this reporting period by type of test and type of drug are summarized in Tables 1 and 2, respectively, and are discussed below:

Pre-Access Testin:

Marijuana 6 Alcohol 2 Amphetamines 2 Total: 10 confirmed positive test results Comments: A total of 1,248 individuals were tested during pre-access screening.

The two individuals who registered a positive test for alcohol were within the category of APS employees. One was a current APS employee who was applying for access to the Protected Area, and the other was a candidate for employment.

The individual who applied for access to the Protected-Area was suspended for forty hours, referred to the company's Employee Assistance Program, and placed in the Follow-Up Program. The offer of employment to the other individual was withdrawn. All others registering positive test results were short-term contractors.

1 of 4

1 For-Cause Testin includin ost accident and observed behavior:

Marijuana 2 Alcohol 2 Total: 4 confirmed positive test results Comments: APS tested 40 individuals within the observed behavior category during this reporting period. Reasons for testing included: suspected adulteration of urine specimens, odor of alcohol on individuals, and behavioral observations.

All four individuals who registered positive test results were short-term contractor personnel.

~Rd d Marijuana g*

Alcohol 1 Amphetamines 2*

Total: 6 confirmed positive test results involving five individuals

  • One individual registered a confirmed positive test result for both marijuana and amphetamines.

Comments: APS tested 1,919 individuals who were randomly selected for drug and alcohol testing during this reporting period. This constituted an equivalent annual testing rate slightly in excess of 107 percent. Of the five individuals who registered a positive test result, four were APS employees and one was a short-term contractor.

Follow-U Testin:

A total of 48 tests were performed as part of the APS Follow-Up Testing Program during this reporting period; all tests were negative. At the end of the reporting period, five individuals are being monitored by the Follow-Up Testing Program.

2of4

APS experienced two violations involving the alcohol prohibition policy during this reporting period. Both individuals were short-term contractor personnel. One individual violated the five-hour abstention requirement. The other individual brought four bottles of beer onto the site. In both cases, a joint investigation was conducted by the APS Corporate Security investigators assigned to PVNGS, and the Fitness-for-Duty Supervisor. In both cases, access to both the Protected Area and to the site was revoked.

A short-term contractor was asked to submit to a For Cause test because of unusual behavior observed by his management. The individual refused to submit

'to testing. As a result, the individual's site access was revoked and he was directed to return to his employer. The individual did not have access to the Protected Area.

Two other individuals were tested within this category due to a positive test for opiates. The Medical Review Officer (MRO) determined that the positive test was related to poppy seed consumption. The APS policy requires that an individual, who is suspected of testing positive due to poppy seed consumption, refrain from consuming poppy seeds for ten days. During the ten-day period, the individual is required to submit to drug and alcohol testing. In the instances cited, the individuals were tested within the ten-day period and test results were negative.

No actions are taken by APS based on presumptive positive test results until confirmed by the MRO. In each case of a confirmed positive (illegal) drug test result, an APS employee's Protected Area access and site access are terminated. APS employees who register a confirmed positive test result for illegal drugs are discharged from employment.

APS employees who experience a single occurrence with a confirmed positive test result for alcohol receive a disciplinary suspension, evaluation, and treatment prior, to reinstatement of unescorted Protected Area access. In addition, these individuals are placed in a follow-up testing program. Contractor personnel who register a confirmed positive test result for illegal drugs or alcohol have their Protected Area and site access terminated.

~P<< ~

APS is continuing its communication efforts to enhance employee awareness of the FFD and Employee Assistance Program, with an emphasis on employee involvement.

3of4

( 1 A Radiation'rotection technician accompanied a member of the FFD Staff to the APS primary Department of Health and Human Services certified laboratory in March. The purpose of the visit was to provide an overview of the analytical testing process and the controls used to protect the chain of custody. The technician also visited with a representative of the laboratory to discuss the testing process and other related issues.

With the assistance of FFD personnel, the technician will develop a presentation for frontline employees.

Four individuals appealed their test determination during this reporting period. The Appeals Board reviewed the relevant material and upheld the original determination in all cases.

APS determined that, due to a human error, an NRC contract individual (DOE employee) was not subjected to a pre-access test prior to being granted access to the PVNGS Protected and Vital Areas. Protected and Vital Area access was withdrawn the following day upon discovery of the error, and the individual completed pre-access testing prior to access being reinstated. Changes have been implemented during this reporting period to ensure that all individuals in this category are included in the PVNGS program when so requested by the NRC.

Summa of Pro ram Chan es No program changes were implemented during this reporting period.

Re ortable Events On January 27, 1993, an APS foreman registered a confirmed positive test for marijuana.

An investigation was conducted jointly by the APS Corporate Security investigators assigned to PVNGS, and the Fitness-for-Duty Supervisor. As a result of the investigation, the individual's access to the Protected Area and to the site, as well as the individual's employment, were terminated. The individual appealed the determination. The Appeals Board reviewed all materials relevant to the individual's case and upheld the original determination.

Planned Actions A trailer designed specifically for specimen collection and alcohol testing is being installed next to the main Fitness-for-Duty facility. The trailer will allow Fitness-for-Duty personnel to process a larger number of individuals for outage periods. Specimens will not be stored in the trailer.

4of4

Table 1 Fitness-For-Duty Program Performance Data Personnel Subject to 10 CFR Part 26

V Fitness for Duty Program Performance Data Personnel Subject to 10CRF26 Arizona Public Service Company (APS) June 30, 1993 Company e months ending Palo Verde Nuclear Generating Norns Station (PVNGS)

Location David N. Heler / Mary F. Maddix (602) 393-7465 Contaot Phono ttnclods ataa coda)

Cutoffs: Screen/Confirmation (ng/ml) Q Appendix A to 10CFR 26 Marijuana 20 / 15 Amphetamines 300 / 300 Benzodiazepines 200 / 200 Cocaine 300 / 150 Phencyclidine 25 / 25 Barbiturates 200 / 200 0piates 300 / 300 Alcohol (% BAC) 0.04%

L'onng-'Tesriii:"'"'"'-'-"'"""': '"::"'-"-'"Sh'o'r't-Te'ram:"::: " '"'."':"

Tes'tIii'g.'! Re's'ult's'icen'see".Emplo'yees':.:  : ':Cont(ac'to'r.'-'.Pe'r's'onnel;: " "Contract'o'r'::Pe'rsonn'el'":

Average Number with Unescorted Access 2534 n/a 1047

.".'".A':.:r,t '".

,Cate'g'o'iIe's,'::..:.:..;,:..",',:::..:,:.,.::,','.;,,'.,.:,',':;::.::I,',,.",;,.:,, I:: 'ested,.':;:-.';.;.: I:;tPositIv'el::" ::,;Tested I:".".;  :.P,,o'sitiv'e":,:.:'.:,..,. I.:.:'-;;;::.:.;Tes'te'd;",;': k:;:-,':-Po's'itiv'e:.':

Pre-Access 140 N/A N/A 1108

!For. Post accident 0 0 N/A N/A 0 0

C'ause.;:

Observed behavior 25 0 N/A N/A 15 Random 1533 N/A N/A 386 Follow-up 13 0 N/A N/A 35 0 Other 0 N/A N/A Total 1713 N/A N/A 1545 14 Rev. 1/92

Table 2 Breakdown of Confirmed Positive Tests for Specific Substances

~ ~

Breakdown of Confirmed Positive Tests for Specific Substances

..""-.';-::;::;"':<',k'":,'.::::.,";:Am'phe.=,;:::;::,;':Phency..":.: ',:Borblt;.;~

~>,,Cocaine'.".; i "';0'plates,::i.;.. ':::"'ltamInes-ii:.:.:,:,iridine!ji i'lcohol .," :,:!:,',to tTe st+i'. 'j,','ze plriii:P~ :;!'iurotes s Ucensee Employees 0 0 0 0 0 0 0 0 0 Long-Term Contractors 0 0 0 0 0 0 0 0 0 0 0 0 Short-Term Contractors 0 0 0 0 0 0 0 0 A Total 7 "/11' 0 0 4k ~ 0 0 0 0 0 0 17 ~ /P1~ ~

NOTES:

For those results reported in a split box, the number on the left side records the number of confirmed positive tests reported on the basis of the NRC cut-off level, while the number on the right side records the number of confirmed positive tests reported on the basis of the more restrictive APS cut-off level.

One individual tested positive for two drugs (amphetamines and marijuana)

0