{{#Wiki_filter:PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 LR-N17-0192 DEC 2 2 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Generating Station, Units 1 and 2 PSEG Nuclear LLC Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311  
{{#Wiki_filter:PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 PSEG Nuclear LLC LR-N17-0192 DEC 22 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311


==Subject:==
==Subject:==
Anchor Darling Double Disc Gate Valve Information and Status  
Anchor Darling Double Disc Gate Valve Information and Status


==References:==
==References:==
: 1) Letter from Greg Krueger (NEI) to John Lubinski (U.S. Nuclear Regulatory Commission), Anchor Darling Double Disc Gate Valve Industry Resolution Plan Update (Project 689), dated August 4, 2017 2) Letter from Joe Pollock (NEI) to Brian Holian (U.S. Nuclear Regulatory Commission), NSIAC Concurrence on Anchor Darling Double Disc Gate Valve Industry Response Actions (Project 689), dated October 26,2017 3) BWROG Topical Report TP-16-1-112, Revision 4, Recommendations to Resolve Flowserve 1 OCFR Part 21 Notification Affecting Anchor Darling Double Disc Gate Valve Wedge Pin Failure In Reference 1, the Nuclear Energy Institute (NEI) provided the NRC a resolution plan for the U.S. Nuclear Industry to address the known Anchor Darling Double Disk Gate Valve (ADDDGV) issues. Reference 2 indicated each utility will provide a listing of their Anchor Darling valve population with active safety functions along with relevant valve information, including the results of susceptibility evaluations, repair status, and a repair schedule for each susceptible valve not yet repaired.
: 1) Letter from Greg Krueger (NEI) to John Lubinski (U.S. Nuclear Regulatory Commission), Anchor Darling Double Disc Gate Valve Industry Resolution Plan Update (Project 689), dated August 4, 2017
This letter serves to provide this information for Salem Generating Station, Units 1 and 2. The Attachment to this letter contains the following information for each ADDDGV:
: 2) Letter from Joe Pollock (NEI) to Brian Holian (U.S. Nuclear Regulatory Commission), NSIAC Concurrence on Anchor Darling Double Disc                     i Gate Valve Industry Response Actions (Project 689), dated October               i-26,2017
: 3) BWROG Topical Report TP-16-1-112, Revision 4, Recommendations to Resolve Flowserve 1OCFR Part 21 Notification Affecting Anchor Darling Double Disc Gate Valve Wedge Pin Failure In Reference 1, the Nuclear Energy Institute (NEI) provided the NRC a resolution plan for the U.S. Nuclear Industry to address the known Anchor Darling Double Disk Gate Valve (ADDDGV) issues. Reference 2 indicated each utility will provide a listing of their Anchor Darling valve population with active safety functions along with relevant valve information, including the results of susceptibility evaluations, repair status, and a repair schedule for each susceptible valve not yet repaired. This letter serves to provide this information for Salem Generating Station, Units 1and 2.
The Attachment to this letter contains the following information for each ADDDGV:
* Plant Name, Unit, and Valve ID.
* Plant Name, Unit, and Valve ID.
* System.
* System.
* Valve Functional Description.
* Valve Functional Description.
* Valve Size.
* Valve Size.
* Active Safety Function (open, close, both). i i-LR-N17-0192 Page 2
* Active Safety Function (open, close, both).
 
LR-N17-0192 Page 2
* Are multiple design basis post-accident strokes are required (yes/no).
* Are multiple design basis post-accident strokes are required (yes/no).
* Expert Panel Risk Ranking (high, medium, low).
* Expert Panel Risk Ranking (high, medium, low).
* Result of susceptibility evaluation (susceptible or not susceptible).
* Result of susceptibility evaluation (susceptible or not susceptible).
* Is the susceptibility evaluation in general conformance with TP16-1-112R4 (Reference 3)?
* Is the susceptibility evaluation in general conformance with TP16-1-112R4 (Reference 3)?
* Does the susceptibility evaluation rely on thread friction?
* Does the susceptibility evaluation rely on thread friction? If yes, was the COF greater than 0.1 0? For cases where thread-friction was relied upon, information is provided whether the coefficient of friction was above or below 0.1.
If yes, was the COF greater than 0.1 0? For cases where thread-friction was relied upon, information is provided whether the coefficient of friction was above or below 0.1.
* Was an initial stem-rotation check performed? If yes, include rotation criteria (i.e.
* Was an initial stem-rotation check performed?
:510 degrees or :55 degrees).
If yes, include rotation criteria (i.e. :510 degrees or :55 degrees).
* Was the diagnostic test data reviewed for failure precursors described in TP16       112R4 (Reference 3)?
* Was the diagnostic test data reviewed for failure precursors described in TP16-1-112R4 (Reference 3)?
* The valve's repair status (i.e. repaired or not repaired).
* The valve's repair status (i.e. repaired or not repaired).
* A repair schedule for each susceptible valve. There are no regulatory commitments in this letter. Should you have any questions or require additional information, please contact Mr. Justin Wearne at 856-339-1351.
* A repair schedule for each susceptible valve.
Sincerely, Paul J. Davison VP Nuclear Engineering PSEG Nuclear ako Attachment 1: Salem Units 1 and 2 ADDDGV Listing LR-N17-0192 Page 3 cc: Mr. David Lew, Regional Administrator-NRC Region 1 Ms. Carleen Parker, Project Manager-US NRC Mr. Patrick Finney, USNRC Senior Resident Inspector-Salem Mr. Patrick Mulligan, Manager IV, NJBNE Mr. Lee Marabella, Corporate Commitment Tracking Coordinator Mr. Thomas Cachaza, Salem Commitment Tracking Coordinator LR-N17-0192 Attachment 1 Salem Units 1 and 2 ADDDGV Listing LR-N17-0192 Salem Units 1 and 2 ADDDGV Listing Was an initial stem-Active Does the susceptibility rotation check Are multiple Expert Panel Result of evaluation rely on thread performed?
There are no regulatory commitments in this letter.
Safety design basis post Risk Ranking susceptibility friction?
Should you have any questions or require additional information, please contact Mr.
If yes, include Was diagnostic test Valve repair status Plant Valve ID Valve Function Is the susceptibility If yes, was the COF (repaired or Name Unit Functional Location (MOV) System Valve Functional Description Size (Open, accident strokes (High, evaluation evaluation in general greater than 0.10? rotation criteria data reviewed for not repaired)
Justin Wearne at 856-339-1351.
Comments (inches) Close, required?
Sincerely,
Medium, (susceptible or not conformance with TP16*1* (No), (No), failure precursors Both) (Yes/No) Low) suceptlble) 112R4?(A) (Yes, >0.10), (Yes, S10 deg.), described in TP 16-1-(Yes/No) (Yes, :50.10) (Yes, ss deg.) 112 R4? (Yes/No) 2 Safety Injection 14" Both Yes Medium No Y (using thread friction)
?~}*\)~
Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem S2SJ -21SJ44-MTRY CONT SUMP SUCT VALVE Note 2 Repair scoped into 2R23 2 Safety Injection 14" Both Yes Medium No Y (using thread friction)
Paul J. Davison VP Nuclear Engineering PSEG Nuclear ako : Salem Units 1 and 2 ADDDGV Listing
Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem S2SJ -22SJ44-MTRY CONT SUMP SUCT VALVE Note 2 Repair scoped into 2R23 1 Safety Injection 14" Both Yes Medium No Y (using thread friction)
 
Yes COF > 0.10 Yes,< 5 deg. Yes Repaired Salem S1SJ -11SJ44-MTRY CONT SUMP SUCT VALVE Note 2 No Further action required.
LR-N17-0192 Page 3 cc:   Mr. David Lew, Regional Administrator- NRC Region 1 Ms. Carleen Parker, Project Manager- US NRC Mr. Patrick Finney, USNRC Senior Resident Inspector- Salem Mr. Patrick Mulligan, Manager IV, NJBNE Mr. Lee Marabella, Corporate Commitment Tracking Coordinator Mr. Thomas Cachaza, Salem Commitment Tracking Coordinator
Note 1 1 Safety Injection 14" Both Yes Medium No Y (using thread friction)
 
Yes COF > 0.10 Yes,< 5 deg. Yes Repaired Salem S1SJ -12SJ44-MTRY CONT SUMP SUCT VALVE Note 2 No Further action required.
LR-N17-0192 Attachment 1 Salem Units 1 and 2 ADDDGV Listing
Note 1 1 Safety Injection 4" Both Yes Low No Y (using thread friction)
 
Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 51SJ -1SJ12-MTRY BIT OUTLET MOV Note 2 1R26 or 1R27 1 Safety Injection 4" Both Yes Low No Y (using thread friction)
LR-N17-0192                                                                                                                                               Salem Units 1 and 2 ADDDGV Listing Was an initial stem-Does the susceptibility   rotation check Active                                                                                evaluation rely on thread Are multiple   Expert Panel     Result of                                                               performed?
Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 51SJ -1SJ13-MTRY BIT OUTLET MOV Note 2 1R26 or 1R27 1 Safety Injection 4" Both Yes Low No Y (using thread friction)
Safety                                                                                         friction?                                                  Valve repair status Valve          design basis post Risk Ranking   susceptibility                                                           If yes, include   Was diagnostic test Plant                             Valve ID                                                                                             Function                                                       Is the susceptibility     If yes, was the COF                                                   (repaired or Unit                                                       System                   Valve Functional Description   Size           accident strokes     (High,       evaluation                                                             rotation criteria    data reviewed for                                      Comments Name                    Functional Location (MOV)                                                                                      (Open,                                                        evaluation in general      greater than 0.10?                                                   not repaired)
Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 51SJ -1SJ4-MTRY BIT INLET MOV Note 2 1R26 or 1R27 1 Safety Injection 4" Both Yes Low No Y (using thread friction)
(inches)             required?       Medium,   (susceptible or not                                                               (No),        failure precursors Close,                                                    conformance with TP16*1*               (No),
Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 51SJ -1SJ5-MTRY BIT INLET MOV Note 2 1R26 or 1R27 1 Safety Injection 8" Open No Medium No Y (using thread friction)
(Yes/No)         Low)         suceptlble)               112R4?(A)               (Yes, >0.10),       (Yes, S10 deg.),   described in TP 16                                                                                                                                               Both)
Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Medium Risk must be repaired in Salem S1SJ -11SJ45-MTRY RHR TO 51 PMPS STOP MOV Note 2 1R26 1 Safety Injection 8" Open No Medium No Y (using thread friction)
(Yes/No)                 (Yes, :50.10)       (Yes, ss deg.)           112 R4?
Yes COF > 0.10 Yes,< 5 deg. Yes Repaired Salem 51SJ -12SJ45-MTRY RHR TO CHG Sl PMPS STOP MOV Note 2 No Further action required.
(Yes/No)
Note 1 1 Containment Spray 8" Both Yes Low No Y (using thread friction)
Y (using thread friction) 2                                                    Safety Injection                                              14"     Both         Yes         Medium             No                                           Yes COF > 0.10         Yes,< 5 deg.             Yes             Not Repaired Salem                     S2SJ -21SJ44-MTRY                                                     CONT SUMP SUCT VALVE                                                                                               Note 2                                                                                                   Repair scoped into 2R23 Y (using thread friction) 2                                                   Safety Injection                                             14"     Both         Yes         Medium             No                                           Yes COF > 0.10         Yes,< 5 deg.             Yes             Not Repaired Salem                     S2SJ -22SJ44-MTRY                                                     CONT SUMP SUCT VALVE                                                                                               Note 2                                                                                                   Repair scoped into 2R23 Y (using thread friction) 1                                                  Safety Injection                                               14"     Both         Yes         Medium           No                                             Yes COF > 0.10         Yes,< 5 deg.             Yes               Repaired Salem                     S1SJ -11SJ44-MTRY                                                     CONT SUMP SUCT VALVE                                                                                             Note 2                                                                                                   No Further action required. Note 1 Y (using thread friction) 1                                                   Safety Injection                                               14"     Both         Yes           Medium           No                                             Yes COF > 0.10         Yes,< 5 deg.             Yes               Repaired Salem                     S1SJ -12SJ44-MTRY                                                     CONT SUMP SUCT VALVE                                                                                             Note 2                                                                                                   No Further action required. Note 1 Y (using thread friction) 1                                                   Safety Injection                                               4"     Both         Yes             Low           No                                             Yes COF > 0.10         Yes,< 5 deg.             Yes           Not Repaired Salem                     51SJ -1SJ12-MTRY                                                       BIT OUTLET MOV                                                                                                   Note 2                                                                                                   1R26 or 1R27 Y (using thread friction) 1                                                   Safety Injection                                               4"     Both         Yes             Low           No                                             Yes COF > 0.10         Yes,< 5 deg.             Yes           Not Repaired Salem                     51SJ -1SJ13-MTRY                                                       BIT OUTLET MOV                                                                                                   Note 2                                                                                                   1R26 or 1R27 Y (using thread friction) 1                                                  Safety Injection                                               4"     Both         Yes             Low           No                                             Yes COF > 0.10         Yes,< 5 deg.               Yes           Not Repaired Salem                     51SJ -1SJ4-MTRY                                                       BIT INLET MOV                                                                                                     Note 2                                                                                                   1R26 or 1R27 Y (using thread friction) 1                                                   Safety Injection                                               4"     Both         Yes             Low             No                                             Yes COF > 0.10         Yes,< 5 deg.               Yes           Not Repaired Salem                     51SJ -1SJ5-MTRY                                                       BIT INLET MOV                                                                                                     Note 2                                                                                                   1R26 or 1R27 Y (using thread friction)                                                                                          Medium Risk must be repaired in 1                                                  Safety Injection                                               8"     Open         No           Medium           No                                             Yes COF > 0.10         Yes,< 5 deg.               Yes           Not Repaired Salem                     S1SJ -11SJ45-MTRY                                                     RHR TO 51 PMPS STOP MOV                                                                                           Note 2                                                                                                   1R26 Y (using thread friction) 1                                                    Safety Injection                                               8"     Open         No           Medium           No                                             Yes COF > 0.10         Yes,< 5 deg.               Yes               Repaired Salem                     51SJ -12SJ45-MTRY                                                     RHR TO CHG Sl PMPS STOP MOV                                                                                       Note 2                                                                                                   No Further action required. Note 1 Y (using thread friction) 1                                                 Containment Spray                                                 8"     Both         Yes             Low             No                                             Yes COF > 0.10         Yes,< 5 deg.               Yes           Not Repaired Salem                     S1CS -11CS36-MTRY                                                     RHR CS STOP VALVE                                                                                                 Note 2                                                                                                   1R26 or 1R27 Y (using thread friction) 1                                                Containment Spray                                                 8"     Both         Yes             Low             No                                             Yes COF > 0.10         Yes,< 5 deg.               Yes           Not Repaired Salem                     51CS -12CS36-MTRY                                                     RHR CS STOP VALVE                                                                                                 Note 2                                                                                                   1R26 or 1R27 Y (using thread friction) 1                                                   Safety Injection                                               4"     Both         Yes             Low             No                                             Yes COF > 0.10         Yes,< 5 deg.               Yes           Not Repaired Salem                     S1SJ -11SJ40-MTRY                                                     SJ HDR STOP VALVE                                                                                                 Note 2                                                                                                   Due for Diagnostic testing in 1R26 Y (using thread friction) 1                                                    Safety Injection                                               4"     Both         Yes             Low             No                                             Yes COF > 0.10         Yes,< 5 deg.               Yes               Repaired Salem                     51SJ -12SJ40-MTRY                                                     SJ HDR STOP VALVE                                                                                                 Note 2                                                                                                   No Further action required. Note 1 Y (using thread friction) 2                                                   Safety Injection                                               4"     Both         Yes             Low             No                                             Yes COF > 0.10         Yes,< 5 deg.               Yes           Not Repaired Salem                     52SJ -21SJ40-MTRY                                                     SJ HDR STOP VALVE                                                                                                 Note 2                                                                                                   Repair scoped into 2R23 Y (using thread friction) 2                                                    Safety Injection                                               4"     Both         Yes             Low             No                                             Yes COF > 0.10         Yes,< 5 deg.               Yes           Not Repaired Salem                     52SJ -22SJ40-MTRY                                                     SJ HDR STOP VALVE                                                                                                 Note 2                                                                                                   Repair scoped into 2R23 Salem             1       S1RHR-11RH4-MTRY                       Residual Heat Removal         RHR PUMP SUCT MOV                   14"   Close         No           Medium           No                 Y (Pin Shear only)           No- Note3             Yes,< 5 deg.               Yes           Not Repaired Salem             1       S1RHR-12RH4-MTRY                       Residual Heat Removal         RHR PUMP SUCT MOV                   14"   Close         No           Medium             No                 Y (Pin Shear only)           No- Note 3           Yes,< 5 deg.               Yes           Not Repaired Internal inspection performed Apr-2                                                                                                                   14"   Close         No           Medium             No                 Y (Pin Shear only)           No- Note 3           Yes,< 5 deg.               Yes           Not Repaired     2017. No issue identified during Salem                     S2RHR-21RH4-MTRY                       Residual Heat Removal         RHR PUMP SUCT MOV                                                                                                                                                                                                           internal inspection.
Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem S1CS -11CS36-MTRY RHR CS STOP VALVE Note 2 1R26 or 1R27 1 Containment Spray 8" Both Yes Low No Y (using thread friction)
Salem             2       S2RHR-22RH4-MTRY                       Residual Heat Removal         RHR PUMP SUCT MOV                   14"     Close         No           Medium             No                 Y (Pin Shear only)           No- Note3             Yes,< 5 deg.               Yes           Not Repaired Y (using thread friction) 1                                               Residual Heat Removal                                               8"     Close         No             Low             No                                           Yes COF > 0.10         Yes,< 5 deg.               Yes           Not Repaired Salem                     51RHR-11RH19-MTRY                                                     RHR HX DISCH CROSS CONN MOV                                                                                       Note 2                                                                                                   1R26 or 1R27 Y (using thread friction) 1                                               Residual Heat Removal                                               8"     Close         No             Low             No                                           Yes COF > 0.10         Yes,< 5 deg.               Yes             Repaired Salem                     51RHR-12RH19-MTRY                                                     RHR HX DISCH CROSS CONN MOV                                                                                       Note 2                                                                                                   No Further action required. Note 1 Salem             1       51CC -1CC117-MTRY                       Component Cooling             RCP CC INLET MOV                     6"     Close         No             Low             No                 Y (Pin Shear only)           No- Note 3           Yes,< 5 deg.               Yes           Not Repaired Salem             1       S1CC -1CC118-MTRY                       Component Cooling             RCP CC INLET MOV                     6"     Close         No             Low             No                 Y (Pin Shear only)           No- Note3             Yes,< 5 deg.             Yes             Not Repaired Salem             1       S1CC -1CC136-MTRY                       Component Cooling             RCP BRG MOV                         6"     Close         No             Low             No                 Y (Pin Shear only)           No- Note 3           Yes,< 5 deg.             Yes             Not Repaired Salem             1       51CC -1CC187-MTRY                       Component Cooling             RCP MOT BRG CC MOV                   6"     Close         No             Low             No                 Y (Pin Shear only)           No- Note 3           Yes,< 5 deg.             Yes             Not Repaired Salem             1       51SJ -1SJ135-MTRY                           Safety Injection           SJ DISCH TO COLD LEGS VLV           4"     Close         No             Low             No                 Y (Pin shear only)           No- Note 3           Yes,< 5 deg.             Yes             Not Repaired Salem             2       52CC -2CC117-MTRY                       Component Cooling             RCP CC INLET MOV                     6"     Close         No             Low             No               Y (Pin Shear only)           No- Note 3           Yes,< 5 deg.             Yes             Not Repaired Salem             2       S2CC -2CC118-MTRY                       Component Cooling             RCP CC INLET MOV                     6"     Close         No             Low             No               Y (Pin Shear only)           No- Note 3           Yes,< 5 deg.             Yes             Not Repaired Salem             2       52CC -2CC136-MTRY                       Component Cooling             RCP BRG MOV                         6"     Close         No             Low             No               Y (Pin Shear only)           No- Note3           Yes,< 5 deg.               Yes             Not Repaired Salem             2       52CC -2CC187-MTRY                       Component Cooling             RCP MOT BRG CC MOV                   6"     Close         No             Low             No               Y (Pin Shear only)           No- Note 3           Yes,< 5 deg.               Yes             Not Repaired Salem             2       52SJ -2SJ135-MTRY                           Safety Injection         SJ DISCH TO COLD LEGS VLV             4"     Close         No             Low             No               Y (Pin Shear only)           No- Note 3           Yes,< 5 deg.               Yes             Not Repaired (A) Applied Wedge Pin Torque must bound anticipated design basis operating torque requirements and current maximum total torque.
Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 51CS -12CS36-MTRY RHR CS STOP VALVE Note 2 1R26 or 1R27 1 Safety Injection 4" Both Yes Low No Y (using thread friction)
NOTES:
Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem S1SJ -11SJ40-MTRY SJ HDR STOP VALVE Note 2 Due for Diagnostic testing in 1R26 1 Safety Injection 4" Both Yes Low No Y (using thread friction)
: 1. The Repair method for the MOV's includes replacing the stem with a new stem with a Integral collar, torquelng the stem/wedge connection to 120 percent of the maximum anticipated design basis operating torque (assuming a 0.20 COF), and pinning the connection with new lnconel718 pins.
Yes COF > 0.10 Yes,< 5 deg. Yes Repaired Salem 51SJ -12SJ40-MTRY SJ HDR STOP VALVE Note 2 No Further action required.
: 2. For all MOVs which required thread friction to validate the current operational capability, PSEG plans to repair all18 valves lAW the schedule above (within the next two refuel outages at each unit)
Note 1 2 Safety Injection 4" Both Yes Low No Y (using thread friction)
: 3. For the remaining 14 MOVs which screened out as acceptable based on PIN shear capability alone, PSEG plans to monitor using normally scheduled diagnostic testing and stem rotation checks per the MOV program requirements lAW NRC GL 96-05.}}
Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 52SJ -21SJ40-MTRY SJ HDR STOP VALVE Note 2 Repair scoped into 2R23 2 Safety Injection 4" Both Yes Low No Y (using thread friction)
Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 52SJ -22SJ40-MTRY SJ HDR STOP VALVE Note 2 Repair scoped into 2R23 Salem 1 S1RHR-11RH4-MTRY Residual Heat Removal RHR PUMP SUCT MOV 14" Close No Medium No Y (Pin Shear only) No-Note3 Yes,< 5 deg. Yes Not Repaired Salem 1 S1RHR-12RH4-MTRY Residual Heat Removal RHR PUMP SUCT MOV 14" Close No Medium No Y (Pin Shear only) No-Note 3 Yes,< 5 deg. Yes Not Repaired Internal inspection performed Apr-2 14" Close No Medium No Y (Pin Shear only) No-Note 3 Yes,< 5 deg. Yes Not Repaired 2017. No issue identified during Salem S2RHR-21RH4-MTRY Residual Heat Removal RHR PUMP SUCT MOV internal inspection.
Salem 2 S2RHR-22RH4-MTRY Residual Heat Removal RHR PUMP SUCT MOV 14" Close No Medium No Y (Pin Shear only) No-Note3 Yes,< 5 deg. Yes Not Repaired 1 Residual Heat Removal 8" Close No Low No Y (using thread friction)
Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 51RHR-11RH19-MTRY RHR HX DISCH CROSS CONN MOV Note 2 1R26 or 1R27 1 Residual Heat Removal 8" Close No Low No Y (using thread friction)
Yes COF > 0.10 Yes,< 5 deg. Yes Repaired Salem 51RHR-12RH19-MTRY RHR HX DISCH CROSS CONN MOV Note 2 No Further action required.
Note 1 Salem 1 51CC -1CC117-MTRY Component Cooling RCP CC INLET MOV 6" Close No Low No Y (Pin Shear only) No-Note 3 Yes,< 5 deg. Yes Not Repaired Salem 1 S1CC -1CC118-MTRY Component Cooling RCP CC INLET MOV 6" Close No Low No Y (Pin Shear only) No-Note3 Yes,< 5 deg. Yes Not Repaired Salem 1 S1CC -1CC136-MTRY Component Cooling RCP BRG MOV 6" Close No Low No Y (Pin Shear only) No-Note 3 Yes,< 5 deg. Yes Not Repaired Salem 1 51CC -1CC187-MTRY Component Cooling RCP MOT BRG CC MOV 6" Close No Low No Y (Pin Shear only) No-Note 3 Yes,< 5 deg. Yes Not Repaired Salem 1 51SJ -1SJ135-MTRY Safety Injection SJ DISCH TO COLD LEGS VLV 4" Close No Low No Y (Pin shear only) No-Note 3 Yes,< 5 deg. Yes Not Repaired Salem 2 52CC -2CC117-MTRY Component Cooling RCP CC INLET MOV 6" Close No Low No Y (Pin Shear only) No-Note 3 Yes,< 5 deg. Yes Not Repaired Salem 2 S2CC -2CC118-MTRY Component Cooling RCP CC INLET MOV 6" Close No Low No Y (Pin Shear only) No-Note 3 Yes,< 5 deg. Yes Not Repaired Salem 2 52CC -2CC136-MTRY Component Cooling RCP BRG MOV 6" Close No Low No Y (Pin Shear only) No-Note3 Yes,< 5 deg. Yes Not Repaired Salem 2 52CC -2CC187-MTRY Component Cooling RCP MOT BRG CC MOV 6" Close No Low No Y (Pin Shear only) No-Note 3 Yes,< 5 deg. Yes Not Repaired Salem 2 52SJ -2SJ135-MTRY Safety Injection SJ DISCH TO COLD LEGS VLV 4" Close No Low No Y (Pin Shear only) No-Note 3 Yes,< 5 deg. Yes Not Repaired (A) Applied Wedge Pin Torque must bound anticipated design basis operating torque requirements and current maximum total torque. NOTES: 1. The Repair method for the MOV's includes replacing the stem with a new stem with a Integral collar, torquelng the stem/wedge connection to 120 percent of the maximum anticipated design basis operating torque (assuming a 0.20 COF), and pinning the connection with new lnconel718 pins. 2. For all MOVs which required thread friction to validate the current operational capability, PSEG plans to repair all18 valves lAW the schedule above (within the next two refuel outages at each unit) 3. For the remaining 14 MOVs which screened out as acceptable based on PIN shear capability alone, PSEG plans to monitor using normally scheduled diagnostic testing and stem rotation checks per the MOV program requirements lAW NRC GL 96-05.}}

Revision as of 07:50, 22 October 2019

Anchor Darling Double Disc Gate Valve Information and Status
ML17356A023
Person / Time
Site: Salem  PSEG icon.png
Issue date: 12/22/2017
From: Davison P
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N17-0192
Download: ML17356A023 (5)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 PSEG Nuclear LLC LR-N17-0192 DEC 22 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311

Subject:

Anchor Darling Double Disc Gate Valve Information and Status

References:

1) Letter from Greg Krueger (NEI) to John Lubinski (U.S. Nuclear Regulatory Commission), Anchor Darling Double Disc Gate Valve Industry Resolution Plan Update (Project 689), dated August 4, 2017
2) Letter from Joe Pollock (NEI) to Brian Holian (U.S. Nuclear Regulatory Commission), NSIAC Concurrence on Anchor Darling Double Disc i Gate Valve Industry Response Actions (Project 689), dated October i-26,2017
3) BWROG Topical Report TP-16-1-112, Revision 4, Recommendations to Resolve Flowserve 1OCFR Part 21 Notification Affecting Anchor Darling Double Disc Gate Valve Wedge Pin Failure In Reference 1, the Nuclear Energy Institute (NEI) provided the NRC a resolution plan for the U.S. Nuclear Industry to address the known Anchor Darling Double Disk Gate Valve (ADDDGV) issues. Reference 2 indicated each utility will provide a listing of their Anchor Darling valve population with active safety functions along with relevant valve information, including the results of susceptibility evaluations, repair status, and a repair schedule for each susceptible valve not yet repaired. This letter serves to provide this information for Salem Generating Station, Units 1and 2.

The Attachment to this letter contains the following information for each ADDDGV:

  • Plant Name, Unit, and Valve ID.
  • System.
  • Valve Functional Description.
  • Valve Size.
  • Active Safety Function (open, close, both).

LR-N17-0192 Page 2

  • Are multiple design basis post-accident strokes are required (yes/no).
  • Expert Panel Risk Ranking (high, medium, low).
  • Result of susceptibility evaluation (susceptible or not susceptible).
  • Is the susceptibility evaluation in general conformance with TP16-1-112R4 (Reference 3)?
  • Does the susceptibility evaluation rely on thread friction? If yes, was the COF greater than 0.1 0? For cases where thread-friction was relied upon, information is provided whether the coefficient of friction was above or below 0.1.
  • Was an initial stem-rotation check performed? If yes, include rotation criteria (i.e.
510 degrees or :55 degrees).
  • Was the diagnostic test data reviewed for failure precursors described in TP16 112R4 (Reference 3)?
  • The valve's repair status (i.e. repaired or not repaired).
  • A repair schedule for each susceptible valve.

There are no regulatory commitments in this letter.

Should you have any questions or require additional information, please contact Mr.

Justin Wearne at 856-339-1351.

Sincerely,

?~}*\)~

Paul J. Davison VP Nuclear Engineering PSEG Nuclear ako : Salem Units 1 and 2 ADDDGV Listing

LR-N17-0192 Page 3 cc: Mr. David Lew, Regional Administrator- NRC Region 1 Ms. Carleen Parker, Project Manager- US NRC Mr. Patrick Finney, USNRC Senior Resident Inspector- Salem Mr. Patrick Mulligan, Manager IV, NJBNE Mr. Lee Marabella, Corporate Commitment Tracking Coordinator Mr. Thomas Cachaza, Salem Commitment Tracking Coordinator

LR-N17-0192 Attachment 1 Salem Units 1 and 2 ADDDGV Listing

LR-N17-0192 Salem Units 1 and 2 ADDDGV Listing Was an initial stem-Does the susceptibility rotation check Active evaluation rely on thread Are multiple Expert Panel Result of performed?

Safety friction? Valve repair status Valve design basis post Risk Ranking susceptibility If yes, include Was diagnostic test Plant Valve ID Function Is the susceptibility If yes, was the COF (repaired or Unit System Valve Functional Description Size accident strokes (High, evaluation rotation criteria data reviewed for Comments Name Functional Location (MOV) (Open, evaluation in general greater than 0.10? not repaired)

(inches) required? Medium, (susceptible or not (No), failure precursors Close, conformance with TP16*1* (No),

(Yes/No) Low) suceptlble) 112R4?(A) (Yes, >0.10), (Yes, S10 deg.), described in TP 16 Both)

(Yes/No) (Yes, :50.10) (Yes, ss deg.) 112 R4?

(Yes/No)

Y (using thread friction) 2 Safety Injection 14" Both Yes Medium No Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem S2SJ -21SJ44-MTRY CONT SUMP SUCT VALVE Note 2 Repair scoped into 2R23 Y (using thread friction) 2 Safety Injection 14" Both Yes Medium No Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem S2SJ -22SJ44-MTRY CONT SUMP SUCT VALVE Note 2 Repair scoped into 2R23 Y (using thread friction) 1 Safety Injection 14" Both Yes Medium No Yes COF > 0.10 Yes,< 5 deg. Yes Repaired Salem S1SJ -11SJ44-MTRY CONT SUMP SUCT VALVE Note 2 No Further action required. Note 1 Y (using thread friction) 1 Safety Injection 14" Both Yes Medium No Yes COF > 0.10 Yes,< 5 deg. Yes Repaired Salem S1SJ -12SJ44-MTRY CONT SUMP SUCT VALVE Note 2 No Further action required. Note 1 Y (using thread friction) 1 Safety Injection 4" Both Yes Low No Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 51SJ -1SJ12-MTRY BIT OUTLET MOV Note 2 1R26 or 1R27 Y (using thread friction) 1 Safety Injection 4" Both Yes Low No Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 51SJ -1SJ13-MTRY BIT OUTLET MOV Note 2 1R26 or 1R27 Y (using thread friction) 1 Safety Injection 4" Both Yes Low No Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 51SJ -1SJ4-MTRY BIT INLET MOV Note 2 1R26 or 1R27 Y (using thread friction) 1 Safety Injection 4" Both Yes Low No Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 51SJ -1SJ5-MTRY BIT INLET MOV Note 2 1R26 or 1R27 Y (using thread friction) Medium Risk must be repaired in 1 Safety Injection 8" Open No Medium No Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem S1SJ -11SJ45-MTRY RHR TO 51 PMPS STOP MOV Note 2 1R26 Y (using thread friction) 1 Safety Injection 8" Open No Medium No Yes COF > 0.10 Yes,< 5 deg. Yes Repaired Salem 51SJ -12SJ45-MTRY RHR TO CHG Sl PMPS STOP MOV Note 2 No Further action required. Note 1 Y (using thread friction) 1 Containment Spray 8" Both Yes Low No Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem S1CS -11CS36-MTRY RHR CS STOP VALVE Note 2 1R26 or 1R27 Y (using thread friction) 1 Containment Spray 8" Both Yes Low No Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 51CS -12CS36-MTRY RHR CS STOP VALVE Note 2 1R26 or 1R27 Y (using thread friction) 1 Safety Injection 4" Both Yes Low No Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem S1SJ -11SJ40-MTRY SJ HDR STOP VALVE Note 2 Due for Diagnostic testing in 1R26 Y (using thread friction) 1 Safety Injection 4" Both Yes Low No Yes COF > 0.10 Yes,< 5 deg. Yes Repaired Salem 51SJ -12SJ40-MTRY SJ HDR STOP VALVE Note 2 No Further action required. Note 1 Y (using thread friction) 2 Safety Injection 4" Both Yes Low No Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 52SJ -21SJ40-MTRY SJ HDR STOP VALVE Note 2 Repair scoped into 2R23 Y (using thread friction) 2 Safety Injection 4" Both Yes Low No Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 52SJ -22SJ40-MTRY SJ HDR STOP VALVE Note 2 Repair scoped into 2R23 Salem 1 S1RHR-11RH4-MTRY Residual Heat Removal RHR PUMP SUCT MOV 14" Close No Medium No Y (Pin Shear only) No- Note3 Yes,< 5 deg. Yes Not Repaired Salem 1 S1RHR-12RH4-MTRY Residual Heat Removal RHR PUMP SUCT MOV 14" Close No Medium No Y (Pin Shear only) No- Note 3 Yes,< 5 deg. Yes Not Repaired Internal inspection performed Apr-2 14" Close No Medium No Y (Pin Shear only) No- Note 3 Yes,< 5 deg. Yes Not Repaired 2017. No issue identified during Salem S2RHR-21RH4-MTRY Residual Heat Removal RHR PUMP SUCT MOV internal inspection.

Salem 2 S2RHR-22RH4-MTRY Residual Heat Removal RHR PUMP SUCT MOV 14" Close No Medium No Y (Pin Shear only) No- Note3 Yes,< 5 deg. Yes Not Repaired Y (using thread friction) 1 Residual Heat Removal 8" Close No Low No Yes COF > 0.10 Yes,< 5 deg. Yes Not Repaired Salem 51RHR-11RH19-MTRY RHR HX DISCH CROSS CONN MOV Note 2 1R26 or 1R27 Y (using thread friction) 1 Residual Heat Removal 8" Close No Low No Yes COF > 0.10 Yes,< 5 deg. Yes Repaired Salem 51RHR-12RH19-MTRY RHR HX DISCH CROSS CONN MOV Note 2 No Further action required. Note 1 Salem 1 51CC -1CC117-MTRY Component Cooling RCP CC INLET MOV 6" Close No Low No Y (Pin Shear only) No- Note 3 Yes,< 5 deg. Yes Not Repaired Salem 1 S1CC -1CC118-MTRY Component Cooling RCP CC INLET MOV 6" Close No Low No Y (Pin Shear only) No- Note3 Yes,< 5 deg. Yes Not Repaired Salem 1 S1CC -1CC136-MTRY Component Cooling RCP BRG MOV 6" Close No Low No Y (Pin Shear only) No- Note 3 Yes,< 5 deg. Yes Not Repaired Salem 1 51CC -1CC187-MTRY Component Cooling RCP MOT BRG CC MOV 6" Close No Low No Y (Pin Shear only) No- Note 3 Yes,< 5 deg. Yes Not Repaired Salem 1 51SJ -1SJ135-MTRY Safety Injection SJ DISCH TO COLD LEGS VLV 4" Close No Low No Y (Pin shear only) No- Note 3 Yes,< 5 deg. Yes Not Repaired Salem 2 52CC -2CC117-MTRY Component Cooling RCP CC INLET MOV 6" Close No Low No Y (Pin Shear only) No- Note 3 Yes,< 5 deg. Yes Not Repaired Salem 2 S2CC -2CC118-MTRY Component Cooling RCP CC INLET MOV 6" Close No Low No Y (Pin Shear only) No- Note 3 Yes,< 5 deg. Yes Not Repaired Salem 2 52CC -2CC136-MTRY Component Cooling RCP BRG MOV 6" Close No Low No Y (Pin Shear only) No- Note3 Yes,< 5 deg. Yes Not Repaired Salem 2 52CC -2CC187-MTRY Component Cooling RCP MOT BRG CC MOV 6" Close No Low No Y (Pin Shear only) No- Note 3 Yes,< 5 deg. Yes Not Repaired Salem 2 52SJ -2SJ135-MTRY Safety Injection SJ DISCH TO COLD LEGS VLV 4" Close No Low No Y (Pin Shear only) No- Note 3 Yes,< 5 deg. Yes Not Repaired (A) Applied Wedge Pin Torque must bound anticipated design basis operating torque requirements and current maximum total torque.

NOTES:

1. The Repair method for the MOV's includes replacing the stem with a new stem with a Integral collar, torquelng the stem/wedge connection to 120 percent of the maximum anticipated design basis operating torque (assuming a 0.20 COF), and pinning the connection with new lnconel718 pins.
2. For all MOVs which required thread friction to validate the current operational capability, PSEG plans to repair all18 valves lAW the schedule above (within the next two refuel outages at each unit)
3. For the remaining 14 MOVs which screened out as acceptable based on PIN shear capability alone, PSEG plans to monitor using normally scheduled diagnostic testing and stem rotation checks per the MOV program requirements lAW NRC GL 96-05.