ML18005B096: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED D1SlBUT1ON I~DEMONSTRQON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8910170305 DOC.DATE: 89/10/11 NOTARIZED:
{{#Wiki_filter:ACCELERATED               D1SlBUT1ON                         DEMONSTRQON                SYSTEM I ~
YES FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CUTTER,A.B.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Carolina Power&Light Co.RECIP.NAME RECIPXENT AFFILIATXON Document Control Branch (Document Control Desk)
ACCESSION NBR:8910170305                         DOC.DATE: 89/10/11   NOTARIZED: YES           DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                               05000400 AUTH. NAME             AUTHOR AFFILIATION CUTTER,A.B.           Carolina Power & Light Co.
RECIP.NAME             RECIPXENT AFFILIATXON Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Application for amend to License NPF-63,revising TS re RHR min flow requirements during refueling operations.
Application for amend to License NPF-63,revising TS re RHR min flow requirements during refueling operations.
DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:
DISTRIBUTION CODE: A001D                       COPIES RECEIVED:LTR       ENCL       SIZE:
General Distribution NOTES:Application for permit renewal filed.DOCKET 05000400 05000400 RECIPIENT ID'ODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS NRR/DEST/ESB 8D NRR/DEST/MTB 9H NRR/DOEA/TSB 11 OC G FIL 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 5'6 6 1 1 1 1 1 1 1 0 1 1 1 1 1 1 RECIPXENT ID CODE/NAME PD2-1 PD NRR/DEST/ADS 7E NRR/DEST/ICSB NRR/DEST/RSB 8E NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 NOZE TO ALL'KIDS" RZCZPEWIS'URSE K?XiP US TO RECCE HASTE!QMChCZ'IHE DOQJMEÃZ~ROL DESKi RXH Pl-37 (EXT.20079)I ELIKBQXB Y00R HOME PBGH DISTRIBUTION TOTAL NUMBER&PRNRPRP(%%Em.
TITLE: OR     Submittal: General Distribution NOTES:Application for permit renewal filed.                                                     05000400 RECIPIENT                       COPIES          RECIPXENT            COPIES ID'ODE/NAME                       LTTR ENCL      ID CODE/NAME        LTTR ENCL PD2-1 LA                             1    1    PD2-1 PD                1    1 BECKER,D                             5' INTERNAL: ACRS                                     6    6    NRR/DEST/ADS 7E          1    1 NRR/DEST/ESB 8D                      1    1    NRR/DEST/ICSB            1   1 NRR/DEST/MTB 9H                      1    1    NRR/DEST/RSB 8E          1    1 NRR/DOEA/TSB 11                      1    1    NUDOCS-ABSTRACT         1    1 OC                                    1    0    OGC/HDS1                 1    0 G  FIL      01                    1    1    RES/DSIR/EIB             1   1 EXTERNAL: LPDR                                      1     1     NRC PDR                  1   1 NSIC                                  1     1 NOZE TO ALL 'KIDS" I
RPP PP ENCL 25 CARL Carolina Power&Light Company P.O.Bex 1551~Ra'leigh, N.C.27602 0(',T 1.1 1989 A.B CUTTER Vice President Nuclear Sewices Department NLS-89-286 United States Nuclear Regulatory Commission ATTENTION:
RZCZPEWIS'URSE K?XiP US TO RECCE HASTE!               QMChCZ 'IHE DOQJMEÃZ ~ROL   DESKi RXH Pl-37 (EXT. 20079)                 ELIKBQXB Y00R HOME PBGH DISTRIBUTION TOTAL NUMBER       &PRNRPRP(%%Em. RPP                         PP   ENCL     25
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 REQUEST FOR EMERGENCY LICENSE AMENDMENT REFUELING OPERATIONS
 
-LOW WATER LEVEL Gentlemen:
CARL Carolina Power & Light Company P.O. Bex 1551 ~ Ra'leigh, N.C. 27602 0(',T 1. 1 1989 A. B CUTTER                                                             NLS-89-286 Vice President Nuclear Sewices Department United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington,         DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR EMERGENCY LICENSE AMENDMENT REFUELING OPERATIONS LOW WATER LEVEL Gentlemen:
In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, Carolina Power 6 Light Company hereby requests an emergency license amendment concerning Residual Heat Removal (RHR)minimum flow requirements during refueling operations for the Shearon Harris Nuclear Power Plant.This emergency Technical Specification change request revises Surveillance Requirement 4.9.8.2.2 to impose a minimum flow requirement of 900 gpm when the reactor water level is below the reactor vessel flange.This amendment request was originally submitted on February 22, 1989 and revised by letters dated June 7, 1989 and August 22, 1989.The detailed description of the proposed change is documented in our letter dated August 22, 1989 and remains unchanged.
In accordance with the           Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, Carolina Power 6 Light Company hereby requests an emergency license amendment concerning Residual Heat Removal (RHR) minimum flow requirements during refueling operations for the Shearon Harris Nuclear Power Plant. This emergency Technical Specification change request revises Surveillance Requirement 4.9.8.2.2 to impose a minimum flow requirement of 900 gpm when the reactor water level is below the reactor vessel flange. This amendment request was originally submitted on February 22, 1989 and revised by letters dated June 7, 1989 and August 22, 1989. The detailed description of the proposed change is documented in our letter dated August 22, 1989 and remains unchanged.                   The revised Technical Specification pages are attached for your use.
The revised Technical Specification pages are attached for your use.The basis for the Company's determination that the proposed changes do not involve a significant hazards consideration is documented in our letter dated August 22, 1989 and remains unchanged.
The basis for the Company's determination that the proposed changes do not involve a significant hazards consideration is documented in our letter dated August 22, 1989 and remains unchanged.           The NRC issued the No Significant Hazards Consideration Determination in the Federal Register dated September 26, 1989. The environmental evaluation which demonstrates that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10CFR51.22(c)(9),
The NRC issued the No Significant Hazards Consideration Determination in the Federal Register dated September 26, 1989.The environmental evaluation which demonstrates that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10CFR51.22(c)(9), is documented in our letter dated August 22, 1989 and remains unchanged.
is documented in our letter dated August 22, 1989 and remains unchanged.           Therefore, no environmental impact statement or environmental assessment need to be prepared in connection with the issuance of the amendment.'
Therefore, no environmental impact statement or environmental assessment need to be prepared in connection with the issuance of the amendment.'
gOo(
gOo(89iOT76305 89iOii PDR ADOCK 05000400 p PDC DISCUSSION OF EMERGENCY Due to the recent fire at the Shearon Harris Nuclear Power Plant, the Refueling Outage originally scheduled to begin on October 22, 1989 commenced on October 10, 1989.The requested license amendment is required prior to the plant entering Mode 6 and draining down to mid-loop operation to allow installation of the nozzle dams needed to support Steam Generator Tube inspections.
89iOT76305   89iOii PDR   ADOCK 05000400 p                 PDC
Entry into Mode 6 and these inspections are critical path activities for this outage and any delay in the completion of these activities will directly affect the length of the outage.Entry into Mode 6 is currently scheduled to begin on October 23, 1989.In order to implement revised procedures associated with this Technical Specification change and complete the requisite operator training, issuance of this license amendment is required by October 17, 1989.Therefore, an emergency license amendment is required to avoid delay of startup of the unit.Yours very ly, A.B.Cutter JHE/jhe Attachment cc: Mr.R.A.Becker Mr.Dayne H.Brown Mr.W.H.Bradford Mr.S.D.Ebneter A.B.Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief;and the sources of his information are officers, employees, contractors, and agents of Carolina Power S Light Company.My commission expires: (-7-Q}}
 
DISCUSSION OF EMERGENCY Due to the recent fire at the Shearon Harris Nuclear Power Plant, the Refueling Outage originally scheduled to begin on October 22, 1989 commenced on October 10, 1989. The requested license amendment is required prior to the plant entering Mode 6 and draining down to mid-loop operation to allow installation of the nozzle dams needed to support Steam Generator Tube inspections.
Entry into Mode 6 and these inspections are critical path activities for this outage and any delay in the completion of these activities will directly affect the length of the outage.
Entry into Mode 6 is currently scheduled to begin on October 23, 1989. In order to implement revised procedures associated with this Technical Specification change and complete the requisite operator training, issuance of this license amendment is required by October 17, 1989. Therefore, an emergency license amendment is required to avoid delay of startup of the unit.
Yours very   ly, A. B. Cutter JHE/jhe Attachment cc:   Mr. R. A. Becker Mr. Dayne H. Brown Mr. W. H. Bradford Mr. S. D. Ebneter A. B. Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power Light Company.
S My commission expires: ( Q}}

Revision as of 05:46, 22 October 2019

Application for Amend to License NPF-63,revising Tech Spec Surveillance Requirement 4.9.8.2.2 to Impose Min Flow Requirement of 900 Gpm When Reactor Water Level Below Reactor Vessel Flange
ML18005B096
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/11/1989
From: Cutter A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18005B097 List:
References
NLS-89-286, NUDOCS 8910170305
Download: ML18005B096 (3)


Text

ACCELERATED D1SlBUT1ON DEMONSTRQON SYSTEM I ~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8910170305 DOC.DATE: 89/10/11 NOTARIZED: YES DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION CUTTER,A.B. Carolina Power & Light Co.

RECIP.NAME RECIPXENT AFFILIATXON Document Control Branch (Document Control Desk)

SUBJECT:

Application for amend to License NPF-63,revising TS re RHR min flow requirements during refueling operations.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPXENT COPIES ID'ODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 BECKER,D 5' INTERNAL: ACRS 6 6 NRR/DEST/ADS 7E 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/RSB 8E 1 1 NRR/DOEA/TSB 11 1 1 NUDOCS-ABSTRACT 1 1 OC 1 0 OGC/HDS1 1 0 G FIL 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOZE TO ALL 'KIDS" I

RZCZPEWIS'URSE K?XiP US TO RECCE HASTE! QMChCZ 'IHE DOQJMEÃZ ~ROL DESKi RXH Pl-37 (EXT. 20079) ELIKBQXB Y00R HOME PBGH DISTRIBUTION TOTAL NUMBER &PRNRPRP(%%Em. RPP PP ENCL 25

CARL Carolina Power & Light Company P.O. Bex 1551 ~ Ra'leigh, N.C. 27602 0(',T 1. 1 1989 A. B CUTTER NLS-89-286 Vice President Nuclear Sewices Department United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR EMERGENCY LICENSE AMENDMENT REFUELING OPERATIONS LOW WATER LEVEL Gentlemen:

In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, Carolina Power 6 Light Company hereby requests an emergency license amendment concerning Residual Heat Removal (RHR) minimum flow requirements during refueling operations for the Shearon Harris Nuclear Power Plant. This emergency Technical Specification change request revises Surveillance Requirement 4.9.8.2.2 to impose a minimum flow requirement of 900 gpm when the reactor water level is below the reactor vessel flange. This amendment request was originally submitted on February 22, 1989 and revised by letters dated June 7, 1989 and August 22, 1989. The detailed description of the proposed change is documented in our letter dated August 22, 1989 and remains unchanged. The revised Technical Specification pages are attached for your use.

The basis for the Company's determination that the proposed changes do not involve a significant hazards consideration is documented in our letter dated August 22, 1989 and remains unchanged. The NRC issued the No Significant Hazards Consideration Determination in the Federal Register dated September 26, 1989. The environmental evaluation which demonstrates that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10CFR51.22(c)(9),

is documented in our letter dated August 22, 1989 and remains unchanged. Therefore, no environmental impact statement or environmental assessment need to be prepared in connection with the issuance of the amendment.'

gOo(

89iOT76305 89iOii PDR ADOCK 05000400 p PDC

DISCUSSION OF EMERGENCY Due to the recent fire at the Shearon Harris Nuclear Power Plant, the Refueling Outage originally scheduled to begin on October 22, 1989 commenced on October 10, 1989. The requested license amendment is required prior to the plant entering Mode 6 and draining down to mid-loop operation to allow installation of the nozzle dams needed to support Steam Generator Tube inspections.

Entry into Mode 6 and these inspections are critical path activities for this outage and any delay in the completion of these activities will directly affect the length of the outage.

Entry into Mode 6 is currently scheduled to begin on October 23, 1989. In order to implement revised procedures associated with this Technical Specification change and complete the requisite operator training, issuance of this license amendment is required by October 17, 1989. Therefore, an emergency license amendment is required to avoid delay of startup of the unit.

Yours very ly, A. B. Cutter JHE/jhe Attachment cc: Mr. R. A. Becker Mr. Dayne H. Brown Mr. W. H. Bradford Mr. S. D. Ebneter A. B. Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power Light Company.

S My commission expires: ( Q