ML18009A021: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 9: | Line 9: | ||
| docket = | | docket = | ||
| license number = | | license number = | ||
| contact person = Sheehan N | | contact person = Sheehan N | ||
| document type = - No Document Type Applies | | document type = - No Document Type Applies | ||
| page count = 9 | | page count = 9 | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:NRC Region I Twitter posts from Oct. 1 to Dec. 31, 2017 Oct. 2, 2017 | {{#Wiki_filter:NRC Region I Twitter posts from Oct. 1 to Dec. 31, 2017 Oct. 2, 2017 A new #NRC Senior Resident Inspector is on the job at the #Millstone #nuclear power plant. | ||
Learn more: https://www.nrc.gov/reading-rm/doc-collections/news/2017/17-031.i.pdf . | |||
Oct. 2, 2017 | |||
#NRC has okayed an extension for the #FitzPatrick #nuclear plant to comply with with new cybersecurity requirements: https://adams.nrc.gov/wba/ | |||
Oct. 10, 2017 | |||
#NRC's Senior Resident Inspector at the Beaver Valley #nuclear plant spoke to a group of environmental journalists when they visited 10/5. | |||
View Tweet activity Oct. 10, 2017 The #NRC has approved deferral of remaining seismic and flooding reviews for the Indian Point | |||
View Tweet activity Oct. 10, 2017 | |||
The #NRC has approved deferral of remaining seismic and flooding reviews for the Indian Point | |||
#nuclear plant, due to close as of 2021. | #nuclear plant, due to close as of 2021. | ||
View Tweet activity Oct. 16, 2017 | View Tweet activity Oct. 16, 2017 The results of the latest annual survey of federal employees are out, and the #NRC once again scored high marks: https://www.nrc.gov/reading-rm/doc-collections/news/2017/17-044.pdf . | ||
Oct. 18, 2017 Tunnel vision: #NRC inspectors recently inspected a tunnel housing reactor-related equipment | |||
The results of the latest annual survey of federal employees are out, and the | @ the Calvert Cliffs #nuclear plant in #Md. | ||
#NRC once again scored high marks: | |||
https://www.nrc.gov/reading-rm/doc- | |||
Oct. 19, 2017 Based on the results of a Sept. team inspection, the #NRC will return the Oyster Creek | |||
#nuclear plant in #NJ to a normal level of oversight. | |||
Oct. 19, 2017 Based on the results of a Sept. team inspection, the #NRC will return the Oyster Creek #nuclear plant in #NJ to a normal level of oversight. | |||
Nov. 1, 2017 | Nov. 1, 2017 The #Salem 2 #nuclear power plant in #NJ has returned to a normal level of oversight after an | ||
#NRC team inspection: https://www.nrc.gov/reactors/operating/oversight/actionmatrix-summary.html Reply View Tweet activity Nov. 15, 2017 | |||
The # | The #NRC has issued its third-quarter inspection report for the #Pilgrim #nuclear power plant. It identifies seven "Green" Non-Cited Violations: https://adams.nrc.gov/wba/ . | ||
# | View Tweet activity Nov. 17, 2017 The #NRC has approved a power uprate for the #PeachBottom #nuclear power plant in #York County, Pa.: https://www.nrc.gov/reading-rm/doc-collections/news/2017/17-046.pdf . It allows for an increase in generating capacity of roughly 1,66 percent. | ||
# | Nov. 21, 2017 | ||
https://www.nrc.gov/ | |||
The #NRC has issued a Confirmatory Order over security-related violations at the #Millstone | |||
#nuclear power plant in #Connecticut: https://www.nrc.gov/reading-rm/doc-collections/news/2017/17-032.i.pdf . | |||
Nov. 27, 2017 The #NRC has taken another step toward the development of new regulations in the area of | |||
#nuclear power plant decommissioning. The regulatory basis for proposed changes has now been released: https://www.nrc.gov/reading-rm/doc-collections/news/2017/17-047.pdf . | |||
Nov. 30, 2017 Heightened oversight at #Pilgrim #nuclear plant in Massachusetts is entering a new phase. | |||
https://www.facebook.com/nrcgov/photos/a.730738480322948.1073741828.688703877859742/ | |||
#Millstone | 1658097394253714/?type=3 | ||
: https://www.nrc.gov/reading-rm/doc-collections/news/2017/17-032.i.pdf | |||
#nuclear power plant decommissioning. The regulatory basis for proposed changes has now been released: https://www.nrc.gov/reading-rm/doc-collections/news/2017/17-047.pdf | |||
#Pilgrim #nuclear plant in Massachusetts is entering a new phase. https://www.facebook.com/nrcgov/photos/a.730738480322948.1073741828.688703877859742/ | |||
1658097394253714/?type=3 | |||
Dec. 18, 2017 The #NRC has approved an extension of certain cybersecurity requirements for the #Pilgrim and #IndianPoint | Dec. 18, 2017 The #NRC has approved an extension of certain cybersecurity requirements for the #Pilgrim and #IndianPoint #nuclear power plants. The extension for Pilgrim runs to late 2020, the Indian Point extension to late 2018. The approvals can be found here: https://adams.nrc.gov/wba/ . | ||
Dec. 22, 2017 | |||
The #NRC has issued a report on a Problem Identification & Resolution team inspection performed in September at the | The #NRC has issued a report on a Problem Identification & Resolution team inspection performed in September at the #Pilgrim #nuclear power plant: | ||
#Pilgrim #nuclear power plant: | https://www.nrc.gov/docs/ML1735/ML17355A479.pdf . | ||
https://www.nrc.gov/docs/ML1735/ML17355A479.pdf | Dec. 26, 2017 The #NRC has approved an extension of certain cybersecurity requirements for the | ||
#OysterCreek #nuclear power plant in #NewJersey: | |||
#NewJersey | https://www.nrc.gov/docs/ML1728/ML17289A222.pdf . | ||
Dec. 28, 2017 An extension of a cybersecurity compliance deadline for the permanently shutdown | |||
#VermontYankee #nuclear power plant has been approved by the #NRC: | |||
#NRC: https://www.nrc.gov/docs/ML1733/ML17335A505.pdf | https://www.nrc.gov/docs/ML1733/ML17335A505.pdf .}} |
Latest revision as of 06:42, 22 October 2019
ML18009A021 | |
Person / Time | |
---|---|
Issue date: | 01/08/2018 |
From: | NRC Region 1 |
To: | |
Sheehan N | |
References | |
Download: ML18009A021 (9) | |
Text
NRC Region I Twitter posts from Oct. 1 to Dec. 31, 2017 Oct. 2, 2017 A new #NRC Senior Resident Inspector is on the job at the #Millstone #nuclear power plant.
Learn more: https://www.nrc.gov/reading-rm/doc-collections/news/2017/17-031.i.pdf .
Oct. 2, 2017
- NRC has okayed an extension for the #FitzPatrick #nuclear plant to comply with with new cybersecurity requirements: https://adams.nrc.gov/wba/
Oct. 10, 2017
- NRC's Senior Resident Inspector at the Beaver Valley #nuclear plant spoke to a group of environmental journalists when they visited 10/5.
View Tweet activity Oct. 10, 2017 The #NRC has approved deferral of remaining seismic and flooding reviews for the Indian Point
- nuclear plant, due to close as of 2021.
View Tweet activity Oct. 16, 2017 The results of the latest annual survey of federal employees are out, and the #NRC once again scored high marks: https://www.nrc.gov/reading-rm/doc-collections/news/2017/17-044.pdf .
Oct. 18, 2017 Tunnel vision: #NRC inspectors recently inspected a tunnel housing reactor-related equipment
@ the Calvert Cliffs #nuclear plant in #Md.
Oct. 19, 2017 Based on the results of a Sept. team inspection, the #NRC will return the Oyster Creek
- nuclear plant in #NJ to a normal level of oversight.
Nov. 1, 2017 The #Salem 2 #nuclear power plant in #NJ has returned to a normal level of oversight after an
- NRC team inspection: https://www.nrc.gov/reactors/operating/oversight/actionmatrix-summary.html Reply View Tweet activity Nov. 15, 2017
The #NRC has issued its third-quarter inspection report for the #Pilgrim #nuclear power plant. It identifies seven "Green" Non-Cited Violations: https://adams.nrc.gov/wba/ .
View Tweet activity Nov. 17, 2017 The #NRC has approved a power uprate for the #PeachBottom #nuclear power plant in #York County, Pa.: https://www.nrc.gov/reading-rm/doc-collections/news/2017/17-046.pdf . It allows for an increase in generating capacity of roughly 1,66 percent.
Nov. 21, 2017
The #NRC has issued a Confirmatory Order over security-related violations at the #Millstone
- nuclear power plant in #Connecticut: https://www.nrc.gov/reading-rm/doc-collections/news/2017/17-032.i.pdf .
Nov. 27, 2017 The #NRC has taken another step toward the development of new regulations in the area of
- nuclear power plant decommissioning. The regulatory basis for proposed changes has now been released: https://www.nrc.gov/reading-rm/doc-collections/news/2017/17-047.pdf .
Nov. 30, 2017 Heightened oversight at #Pilgrim #nuclear plant in Massachusetts is entering a new phase.
https://www.facebook.com/nrcgov/photos/a.730738480322948.1073741828.688703877859742/
1658097394253714/?type=3
Dec. 18, 2017 The #NRC has approved an extension of certain cybersecurity requirements for the #Pilgrim and #IndianPoint #nuclear power plants. The extension for Pilgrim runs to late 2020, the Indian Point extension to late 2018. The approvals can be found here: https://adams.nrc.gov/wba/ .
Dec. 22, 2017
The #NRC has issued a report on a Problem Identification & Resolution team inspection performed in September at the #Pilgrim #nuclear power plant:
https://www.nrc.gov/docs/ML1735/ML17355A479.pdf .
Dec. 26, 2017 The #NRC has approved an extension of certain cybersecurity requirements for the
- OysterCreek #nuclear power plant in #NewJersey:
https://www.nrc.gov/docs/ML1728/ML17289A222.pdf .
Dec. 28, 2017 An extension of a cybersecurity compliance deadline for the permanently shutdown
- VermontYankee #nuclear power plant has been approved by the #NRC: