| issue date = 04/29/1991
| issue date = 04/29/1991
| title = NPDES Noncompliance Notification:On 910310,bldg Sewage Collection Tank Pump Discovered to Be de-energized During Electrical Bus Outage.Caused by Inoperable Pump.Personnel to Refrain from Using Rest Rooms Until Power Restored
| title = NPDES Noncompliance Notification:On 910310,bldg Sewage Collection Tank Pump Discovered to Be de-energized During Electrical Bus Outage.Caused by Inoperable Pump.Personnel to Refrain from Using Rest Rooms Until Power Restored
| author name = RICHEY R B
| author name = Richey R
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:P~CCELERATED DI<UTION DEMONS'TION SYSTEM I'OTES:Application for permit renewal filed.RECIPIENT, COPIES ID CODE/NAME LTTR ENCL PD2-1 LA.1 1 BECKER,D 1 1 RECIPIENT'D CODE/NAME PD2-1 PD COPIES LTTR ENCL 1 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)4 ACCESSION NBR:9105060044 DOC.DATE: 91/04/29 NOTARIZED:
{{#Wiki_filter:P~CCELERATED DI<                                 UTION   DEMONS'TION               SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 4 ACCESSION NBR:9105060044                       DOC.DATE: 91/04/29   NOTARIZED: NO         DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                         05000400 AUTH. NAME             AUTHOR AFFILIATION RICHEY,R.B.           Carolina Power 6 Light Co.
NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION RICHEY,R.B.
RECIP.NAME             RECIPIENT AFFILIATION-Document Control Branch (Document Control Desk)
Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION-Document Control Branch (Document Control Desk)SUBJECT-: NPDES noncompliance notification:on 910310,bldg sewage collection tank pump discovered to be de-energized during electrical bus outage.Caused by inoperable pump.Personnel refrain from using rest rooms until power restored.DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR (ENCL C SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.DOCKET 05000400 D/05000400 A D D INTERNAL ACNW AEOD/DOA-AEOD/ROAB/DSP NRR/DET/EMEB 7E'RR/DLPQ/LPEB10 NRR/DREP/PRPB11 NRR/DST/SICB 7E NRR/DST/SRXB 8E RES/DSIR/EIB EXTERNAL: EG&G BRYCE,J.H NRC PDR NSIC POORE,W.2 2 1" 1 2 2 1 1 1 1 2 2 1 1 1 1 1 1 3 3 1 1 1 1 ACRS AEOD/DSP/TPAB NRR/DET/ECMB 9H NRR/DLPQ/LHFB11 NRR/DOEA/OEAB NRR/DST/SELB 8D NRR/DS PLB8D1 E 02~RG FILE 01 L ST LOBBY WARD NSIC MURPHYiG~A NUDOCS FULL TXT 2 2 1 1 1 1 1 1 1'1 1 1 1 1.1 1 1 1 1.1 1 1 1 1 R D NOTE TO ALL"RIDS" RECIPIENTS:
SUBJECT-: NPDES     noncompliance notification:on 910310,bldg sewage collection tank pump discovered to be de-energized during electrical bus outage. Caused by inoperable pump. Personnel                             D refrain from using rest rooms until power restored.
PLEASE HELP US TO REDUCE O'ASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P!-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 33 D D
DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ( ENCL                           C SIZE:
TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.
I'OTES:Application
                                                                                                      /
for permit renewal filed.                                          05000400 A
RECIPIENT,                                                                            D ID  CODE/NAME COPIES LTTR ENCL    'DRECIPIENT CODE/NAME COPIES LTTR ENCL PD2-1 LA                              .1    1    PD2-1 PD              1    1          D BECKER,D                               1    1 INTERNAL ACNW                                     2    2    ACRS                  2    2 AEOD/DOA-                             1"    1    AEOD/DSP/TPAB          1    1 AEOD/ROAB/DSP                         2    2    NRR/DET/ECMB 9H        1    1 NRR/DET/EMEB 7E                       1    1    NRR/DLPQ/LHFB11        1    1
          'RR/DLPQ/LPEB10                         1    1    NRR/DOEA/OEAB          1    '1 NRR/DREP/PRPB11                       2    2    NRR/DST/SELB 8D        1    1 NRR/DST/SICB 7E                       1    1    NRR/DS    PLB8D1      1    1.
NRR/DST/SRXB 8E                       1    1            E        02    1    1 RES/DSIR/EIB                           1    1  ~RG      FILE 01        1    1 EXTERNAL: EG&G BRYCE,J.H                         3     3   L ST LOBBY   WARD     1. 1 NRC PDR                                1     1   NSIC MURPHYiG A  ~    1     1 NSIC POORE,W.                         1     1   NUDOCS FULL TXT        1     1           R D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE O'ASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P !-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                       33 ENCL       33


Carolina Power&Light Company P,O.Box 165~New Hill;N.C.27562 R.B.RICHEY Vice President Harris Nuclear Project HARRIS NUCLEAR PROJECT PE 0.Box 165 New Hill, North Carolina 27562'PR 2 9 1991 Letter Number'.HO-910055 (0)United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 SHEARON HARRIS NUCLEAR POWER PLANT Docket No.50-400, License NPF-63 NONROUTINE REPORTEnclosed is a Nonroutine Report pursuant to Append'ix B, Section 5.4.2 of the plant Operating License.This report is a copy of the state NPDES Report as required by this Operating License subsection.
Carolina Power & Light Company P,O. Box 165 ~ New Hill; N. C. 27562 HARRIS NUCLEAR PROJECT PE 0. Box 165 R. B. RICHEY Vice President                  New Hill, North       Carolina Harris Nuclear Project                                                        27562'PR 2 9 1991 Letter       Number'. HO-910055   (0)
Very truly yours, MRH:kjc Enclosure Vice President Harris Nuclear Project cc: Mr.R.A.Becker Mr.S.D.Ebneter Mr.J.E.Tedrow 9105060044 91042x PDR ADOCK 0 000400 PDR MEM/HO-9100550/1/OS1
United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.           20555 SHEARON HARRIS NUCLEAR POWER PLANT Docket No. 50-400, License NPF-63 NONROUTINE REPORT Enclosed        is   a   Nonroutine Report pursuant                         to Append'ix B, Section 5.4.2 of the plant Operating License.                                 This report is a copy of the state NPDES Report as required by                                   this Operating License subsection.
<pS l
Very     truly yours, Vice President Harris Nuclear Project MRH:kjc Enclosure cc:     Mr. R. A. Becker Mr. S. D. Ebneter Mr. J. E. Tedrow 9105060044 91042x PDR   ADOCK 0 000400 PDR
                                                                                                        <pS l
MEM/HO-9100550/1/OS1
 
~
  ~
* F 0
ATTACHMENT TO SHEARON HARRIS NUCLEAR POWER PLANT NPDES REPORT FOR MARCH 1991 Sewa e  'Leaka    e to Storm Drains At approximately 0845 on March 10, -1991, the K Building Sewage collection tank pump was discovered to be de-energized during an electrical bus outage.
The inoperable pump caused the collection tank to overflow leaking about 50 gallons of raw sewage to the area catch basin. The catch basin already contained approximately 500 gallons of rain water. Upon high water level, the catcn basin pump automatically pumped the water to the storm drains.                      The spill was not detected in      time  to i'solate  the  catch basin  since  it  was  estimated
                                                                              'efore that the power to the    collection      tank  pump  was  off for  about  5  hours          the spill was detected.      Immediate    action  was  taken  to  secure    the  K  Building  potable water supply at  0855. A  plant  wide  announcement  was made    to alert  K Building personnel to refrain from using the rest rooms until power was restored. The storm drain runoff collection dike at the plant boundary was checked for dissolved oxygen.
This analysis showed an oxygen concentration of 3.2 ppm. A sample of a small nearby rain pool showed an oxygen concentration of 3.6 ppm, It was concluded that, the sewage would have only a minimum effect on the oxygen in the lake at the storm drain discharge point. Visual inspection of the storm drain discharge poi'nts at the plant boundary and Harris Lake showed no evidence of the sewage.
The plane is evaluating this incident and will implement corrective actions as required.


~~*F 0 ATTACHMENT TO SHEARON HARRIS NUCLEAR POWER PLANT NPDES REPORT FOR MARCH 1991 Sewa e'Leaka e to Storm Drains At approximately 0845 on March 10,-1991, the K Building Sewage collection tank pump was discovered to be de-energized during an electrical bus outage.The inoperable pump caused the collection tank to overflow leaking about 50 gallons of raw sewage to the area catch basin.The catch basin already contained approximately 500 gallons of rain water.Upon high water level, the catcn basin pump automatically pumped the water to the storm drains.The spill was not detected in time to i'solate the catch basin since it was estimated that the power to the collection tank pump was off for about 5 hours'efore the spill was detected.Immediate action was taken to secure the K Building potable water supply at 0855.A plant wide announcement was made to alert K Building personnel to refrain from using the rest rooms until power was restored.The storm drain runoff collection dike at the plant boundary was checked for dissolved oxygen.This analysis showed an oxygen concentration of 3.2 ppm.A sample of a small nearby rain pool showed an oxygen concentration of 3.6 ppm, It was concluded that, the sewage would have only a minimum effect on the oxygen in the lake at the storm drain discharge point.Visual inspection of the storm drain discharge poi'nts at the plant boundary and Harris Lake showed no evidence of the sewage.The plane is evaluating this incident and will implement corrective actions as required.
'}}
'}}

Latest revision as of 06:33, 22 October 2019

NPDES Noncompliance Notification:On 910310,bldg Sewage Collection Tank Pump Discovered to Be de-energized During Electrical Bus Outage.Caused by Inoperable Pump.Personnel to Refrain from Using Rest Rooms Until Power Restored
ML18009A881
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/29/1991
From: Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-910055-(O), NUDOCS 9105060044
Download: ML18009A881 (6)


Text

P~CCELERATED DI< UTION DEMONS'TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 4 ACCESSION NBR:9105060044 DOC.DATE: 91/04/29 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION RICHEY,R.B. Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION-Document Control Branch (Document Control Desk)

SUBJECT-: NPDES noncompliance notification:on 910310,bldg sewage collection tank pump discovered to be de-energized during electrical bus outage. Caused by inoperable pump. Personnel D refrain from using rest rooms until power restored.

DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ( ENCL C SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

I'OTES:Application

/

for permit renewal filed. 05000400 A

RECIPIENT, D ID CODE/NAME COPIES LTTR ENCL 'DRECIPIENT CODE/NAME COPIES LTTR ENCL PD2-1 LA .1 1 PD2-1 PD 1 1 D BECKER,D 1 1 INTERNAL ACNW 2 2 ACRS 2 2 AEOD/DOA- 1" 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DSP 2 2 NRR/DET/ECMB 9H 1 1 NRR/DET/EMEB 7E 1 1 NRR/DLPQ/LHFB11 1 1

'RR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 '1 NRR/DREP/PRPB11 2 2 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/DS PLB8D1 1 1.

NRR/DST/SRXB 8E 1 1 E 02 1 1 RES/DSIR/EIB 1 1 ~RG FILE 01 1 1 EXTERNAL: EG&G BRYCE,J.H 3 3 L ST LOBBY WARD 1. 1 NRC PDR 1 1 NSIC MURPHYiG A ~ 1 1 NSIC POORE,W. 1 1 NUDOCS FULL TXT 1 1 R D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE O'ASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P !-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 33

Carolina Power & Light Company P,O. Box 165 ~ New Hill; N. C. 27562 HARRIS NUCLEAR PROJECT PE 0. Box 165 R. B. RICHEY Vice President New Hill, North Carolina Harris Nuclear Project 27562'PR 2 9 1991 Letter Number'. HO-910055 (0)

United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 SHEARON HARRIS NUCLEAR POWER PLANT Docket No. 50-400, License NPF-63 NONROUTINE REPORT Enclosed is a Nonroutine Report pursuant to Append'ix B, Section 5.4.2 of the plant Operating License. This report is a copy of the state NPDES Report as required by this Operating License subsection.

Very truly yours, Vice President Harris Nuclear Project MRH:kjc Enclosure cc: Mr. R. A. Becker Mr. S. D. Ebneter Mr. J. E. Tedrow 9105060044 91042x PDR ADOCK 0 000400 PDR

<pS l

MEM/HO-9100550/1/OS1

~

~

  • F 0

ATTACHMENT TO SHEARON HARRIS NUCLEAR POWER PLANT NPDES REPORT FOR MARCH 1991 Sewa e 'Leaka e to Storm Drains At approximately 0845 on March 10, -1991, the K Building Sewage collection tank pump was discovered to be de-energized during an electrical bus outage.

The inoperable pump caused the collection tank to overflow leaking about 50 gallons of raw sewage to the area catch basin. The catch basin already contained approximately 500 gallons of rain water. Upon high water level, the catcn basin pump automatically pumped the water to the storm drains. The spill was not detected in time to i'solate the catch basin since it was estimated

'efore that the power to the collection tank pump was off for about 5 hours the spill was detected. Immediate action was taken to secure the K Building potable water supply at 0855. A plant wide announcement was made to alert K Building personnel to refrain from using the rest rooms until power was restored. The storm drain runoff collection dike at the plant boundary was checked for dissolved oxygen.

This analysis showed an oxygen concentration of 3.2 ppm. A sample of a small nearby rain pool showed an oxygen concentration of 3.6 ppm, It was concluded that, the sewage would have only a minimum effect on the oxygen in the lake at the storm drain discharge point. Visual inspection of the storm drain discharge poi'nts at the plant boundary and Harris Lake showed no evidence of the sewage.

The plane is evaluating this incident and will implement corrective actions as required.

'