ML18059A885: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/11/1994
| issue date = 03/11/1994
| title = Rev to 940222 I&C TS Change Request to License DPR-20,adding Surveillance Item 10 to Table 4.2.1 Which Require Verifying SIT Level & Pressure Each Shift & Adding Three Paragraphs to Basis for Proposed Section 3.17
| title = Rev to 940222 I&C TS Change Request to License DPR-20,adding Surveillance Item 10 to Table 4.2.1 Which Require Verifying SIT Level & Pressure Each Shift & Adding Three Paragraphs to Basis for Proposed Section 3.17
| author name = ROGERS D W
| author name = Rogers D
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name =  
| addressee name =  
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 1
| page count = 1
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:consumers P1t1wer POWERINli MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 March 11, 1994 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 David W. Rogers Plant Safety and Licensing Director DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT -TECHNICAL SPECIFICATIONS CHANGE REQUEST -INSTRUMENTATION AND CONTROL -REVISED PAGES. The attachment to this letter contains revised pages for our revised Instrument and Control (l&C) Technical Specifications (TS) change request which was submitted on February 22, 1994. 1) The first revision adds surveillance item 10 to Table 4.2.1 which requires verifying Safety Injection Tank (SIT) Level and Pressure each shift. This same surveillance requirement currently appears as item 13a of Table 4.1.2 in the Palisades TS. It was included in our November 15, 1991 l&C TS change request, but was inadvertently omitted from the February 22, 1994 revision.
{{#Wiki_filter:consumers P1t1wer                                                 David W. Rogers Plant Safety and Licensing Director POWERINli MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 March 11, 1994 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - TECHNICAL SPECIFICATIONS CHANGE REQUEST - INSTRUMENTATION AND CONTROL - REVISED PAGES.
Proposed pages 4-6 through 4-15 are included in the attachment to provide correct page numbering.
The attachment to this letter contains revised pages for our revised Instrument and Control (l&C) Technical Specifications (TS) change request which was submitted on February 22, 1994.
These pages replace pages 4-6 through 4-16 of the February 22, 1994 submittal.  
: 1)     The first revision adds surveillance item 10 to Table 4.2.1 which requires verifying Safety Injection Tank (SIT) Level and Pressure each shift. This same surveillance requirement currently appears as item 13a of Table 4.1.2 in the Palisades TS. It was included in our November 15, 1991 l&C TS change request, but was inadvertently omitted from the February 22, 1994 revision.
: 2) The second revision adds three paragraphs to the basis for proposed section 3.17, under the heading "Minimum Operable Channels".
Proposed pages 4-6 through 4-15 are included in the attachment to provide correct page numbering. These pages replace pages 4-6 through 4-16 of the February 22, 1994 submittal.
This addition of text was suggested by the NRC reviewer, Mr. Ahmed, as clarification of the proposed l&C section. The changes proposed in this letter do not alter the conclusions of the No Significant Hazards Analysis contained in our November 15, 1991 letter on this subject. A copy of this letter has been sent to the State of Michigan.
: 2)     The second revision adds three paragraphs to the basis for proposed section 3.17, under the heading "Minimum Operable Channels". This addition of text was suggested by the NRC reviewer, Mr. Ahmed, as clarification of the proposed l&C section.
CC Administrator, Region Ill, USNRC Resident Inspector, Palisades Attachment  
The changes proposed in this letter do not alter the conclusions of the No Significant Hazards Analysis contained in our November 15, 1991 letter on this subject. A copy of this letter has been sent to the State of Michigan.
.16 OJ1_0_7 _ ,-** 9403170116 940311 PDR ADOCK 05000255 p PDR A CM5 ENERGY COMPANY}}
CC Administrator, Region Ill, USNRC Resident Inspector, Palisades Attachment
                        .16 OJ1_0_7 _
,-** 9403170116 940311 PDR ADOCK 05000255 p                           PDR A CM5 ENERGY COMPANY}}

Latest revision as of 17:43, 21 October 2019

Rev to 940222 I&C TS Change Request to License DPR-20,adding Surveillance Item 10 to Table 4.2.1 Which Require Verifying SIT Level & Pressure Each Shift & Adding Three Paragraphs to Basis for Proposed Section 3.17
ML18059A885
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/11/1994
From: Rogers D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18059A886 List:
References
NUDOCS 9403170116
Download: ML18059A885 (1)


Text

consumers P1t1wer David W. Rogers Plant Safety and Licensing Director POWERINli MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 March 11, 1994 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - TECHNICAL SPECIFICATIONS CHANGE REQUEST - INSTRUMENTATION AND CONTROL - REVISED PAGES.

The attachment to this letter contains revised pages for our revised Instrument and Control (l&C) Technical Specifications (TS) change request which was submitted on February 22, 1994.

1) The first revision adds surveillance item 10 to Table 4.2.1 which requires verifying Safety Injection Tank (SIT) Level and Pressure each shift. This same surveillance requirement currently appears as item 13a of Table 4.1.2 in the Palisades TS. It was included in our November 15, 1991 l&C TS change request, but was inadvertently omitted from the February 22, 1994 revision.

Proposed pages 4-6 through 4-15 are included in the attachment to provide correct page numbering. These pages replace pages 4-6 through 4-16 of the February 22, 1994 submittal.

2) The second revision adds three paragraphs to the basis for proposed section 3.17, under the heading "Minimum Operable Channels". This addition of text was suggested by the NRC reviewer, Mr. Ahmed, as clarification of the proposed l&C section.

The changes proposed in this letter do not alter the conclusions of the No Significant Hazards Analysis contained in our November 15, 1991 letter on this subject. A copy of this letter has been sent to the State of Michigan.

CC Administrator, Region Ill, USNRC Resident Inspector, Palisades Attachment

.16 OJ1_0_7 _

,-** 9403170116 940311 PDR ADOCK 05000255 p PDR A CM5 ENERGY COMPANY