ML18074A032: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/19/2018 | | issue date = 03/19/2018 | ||
| title = APR1400 P4 Chapter 7 ACRS | | title = APR1400 P4 Chapter 7 ACRS | ||
| author name = Akstulewicz F | | author name = Akstulewicz F | ||
| author affiliation = NRC/NRO/DNRL/LB2 | | author affiliation = NRC/NRO/DNRL/LB2 | ||
| addressee name = Veil A | | addressee name = Veil A | ||
| addressee affiliation = NRC/ACRS | | addressee affiliation = NRC/ACRS | ||
| docket = 05200046 | | docket = 05200046 | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:March 19, 2018 | {{#Wiki_filter:March 19, 2018 MEMORANDUM TO: Andrea D. Veil, Executive Director Advisory Committee on Reactor Safeguards FROM: Frank M Akstulewicz, Director /RA/ | ||
Division of New Reactor Licensing Office of New Reactors | |||
MEMORANDUM TO: | |||
FROM: | |||
==SUBJECT:== | ==SUBJECT:== | ||
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 7, | ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 7, INSTRUMENTATION AND CONTROLS By letter dated December 23, 2014, Korea Electric Power Corporation and Korea Hydro & | ||
Nuclear Power Co. (KHNP), Ltd. submitted an application for a design certification of the Advanced Power Reactor 1400 (APR1400) Standard Design. On March 10, 2017, KHNP submitted a subsequent letter transmitting Revision 1 to the APR1400 design certification application. | |||
By letter dated December 23, 2014, Korea Electric Power Corporation and Korea Hydro & | Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its safety evaluation (SE) with no open items (OIs) for Chapter 7, Instrumentation and Controls (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18074A029). The staffs review was based on Revision 1 of the application. The SE is being provided to support a meeting of the Subcommittee of the ACRS scheduled for April 17-19, 2018. The ACRS Full Committee meeting will be held after the Subcommittee meeting. | ||
Nuclear Power Co. (KHNP), Ltd. submitted an application for a design certification of the Advanced Power Reactor 1400 (APR1400) Standard Design. On March 10, 2017, KHNP submitted a subsequent letter transmitting Revision 1 to the APR1400 design certification application. | The staff concludes that the SE does not contain any information exempt from public disclosure. | ||
However, the U.S. Nuclear Regulatory Commission will withhold the SE from public disclosure for ten business days to allow KHNP the opportunity to verify the staffs conclusion that the SE contains no such exempt information. Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in the Agencywide Documents Access and Management System. | |||
Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its safety evaluation (SE) with no open items (OIs) for Chapter 7, | The staff will inform the ACRS immediately if KHNP requests that any of the information in the SE be withheld from public disclosure. | ||
Docket No.: 52-046 CONTACTS: Mark Lintz, NRO/DNRL 301-415-4051 William R. Ward, NRO/DNRL 301-415-7038 | |||
Subcommittee meeting. | |||
The staff concludes that the SE does not contain any information exempt from public disclosure. However, the U.S. Nuclear Regulatory Commission will withhold the SE from public disclosure for ten business days to allow KHNP the opportunity to verify the | |||
The staff will inform the ACRS immediately if KHNP requests that any of the information in the SE be withheld from public disclosure. | |||
Docket No.: | |||
CONTACTS: | |||
William R. Ward, NRO/DNRL | |||
Ltr: | Pkg: ML18074A028 Memo: ML18074A032 Ltr: ML18074A031 SER: ML18074A029 *via email NRO-002 OFFICE DNRL/LB2: PM DNRL/ LB2: LA DNRL/ LB2: PM DNRL/LB2: BC DNRL: DD NAME MLintz CSmith* WWard MMcCoppin ABradford DATE 03/15/2018 03/15/2018 03/19/2018 03/15/2018 03/19/2018}} |
Latest revision as of 16:59, 21 October 2019
ML18074A032 | |
Person / Time | |
---|---|
Site: | 05200046 |
Issue date: | 03/19/2018 |
From: | Frank Akstulewicz NRC/NRO/DNRL/LB2 |
To: | Andrea Veil Advisory Committee on Reactor Safeguards |
Santos C / 415-7270 | |
Shared Package | |
ML18074A028 | List: |
References | |
Download: ML18074A032 (2) | |
Text
March 19, 2018 MEMORANDUM TO: Andrea D. Veil, Executive Director Advisory Committee on Reactor Safeguards FROM: Frank M Akstulewicz, Director /RA/
Division of New Reactor Licensing Office of New Reactors
SUBJECT:
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 7, INSTRUMENTATION AND CONTROLS By letter dated December 23, 2014, Korea Electric Power Corporation and Korea Hydro &
Nuclear Power Co. (KHNP), Ltd. submitted an application for a design certification of the Advanced Power Reactor 1400 (APR1400) Standard Design. On March 10, 2017, KHNP submitted a subsequent letter transmitting Revision 1 to the APR1400 design certification application.
Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its safety evaluation (SE) with no open items (OIs) for Chapter 7, Instrumentation and Controls (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18074A029). The staffs review was based on Revision 1 of the application. The SE is being provided to support a meeting of the Subcommittee of the ACRS scheduled for April 17-19, 2018. The ACRS Full Committee meeting will be held after the Subcommittee meeting.
The staff concludes that the SE does not contain any information exempt from public disclosure.
However, the U.S. Nuclear Regulatory Commission will withhold the SE from public disclosure for ten business days to allow KHNP the opportunity to verify the staffs conclusion that the SE contains no such exempt information. Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in the Agencywide Documents Access and Management System.
The staff will inform the ACRS immediately if KHNP requests that any of the information in the SE be withheld from public disclosure.
Docket No.: 52-046 CONTACTS: Mark Lintz, NRO/DNRL 301-415-4051 William R. Ward, NRO/DNRL 301-415-7038
Pkg: ML18074A028 Memo: ML18074A032 Ltr: ML18074A031 SER: ML18074A029 *via email NRO-002 OFFICE DNRL/LB2: PM DNRL/ LB2: LA DNRL/ LB2: PM DNRL/LB2: BC DNRL: DD NAME MLintz CSmith* WWard MMcCoppin ABradford DATE 03/15/2018 03/15/2018 03/19/2018 03/15/2018 03/19/2018