ML18096A455: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 04/03/2018 | | issue date = 04/03/2018 | ||
| title = Shine Operating License Pre-Application Meeting (Environmental Presentation Slides) | | title = Shine Operating License Pre-Application Meeting (Environmental Presentation Slides) | ||
| author name = Moser M | | author name = Moser M | ||
| author affiliation = NRC/NRR/DMLR/MENB | | author affiliation = NRC/NRR/DMLR/MENB | ||
| addressee name = | | addressee name = | ||
Line 9: | Line 9: | ||
| docket = 05000608 | | docket = 05000608 | ||
| license number = CPMIF-001 | | license number = CPMIF-001 | ||
| contact person = Moser M | | contact person = Moser M, NRR/DMLR, 415-6509 | ||
| document type = Slides and Viewgraphs | | document type = Slides and Viewgraphs | ||
| page count = 10 | | page count = 10 | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Pre-application Meeting Regarding the SHINE Medical Technologies Operating License Application: | {{#Wiki_filter:Pre-application Meeting Regarding the SHINE Medical Technologies Operating License Application: | ||
}} | Environmental Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission April 3, 2018 | ||
Agenda | |||
* Regulatory background | |||
* Consideration of new information | |||
* Best practices | |||
* Format 2 | |||
Regulatory Background | |||
* 10 CFR 51.95 (b) requires the NRC staff to prepare a supplemental environmental impact statement (EIS) | |||
* The supplemental EIS will: | |||
* update the prior staff review for the construction permit | |||
* describe matters that differ or that reflect significant new information since publication of the final EIS | |||
* The supplemental EIS does not need to include: | |||
* a discussion of matters that are the same or that have not changed since publication of the final EIS 3 | |||
Regulatory Background | |||
* 10 CFR 51.53(b) requires an applicant to prepare an environmental report | |||
* The environmental report should: | |||
* discuss matters that differ or that reflect new information since publication of the final EIS | |||
* The environmental report does not need to include: | |||
* a discussion of matters that are the same or that have not changed 4 | |||
Consideration of New or Different Information | |||
* The applicant should consider all matters described in: | |||
* 10 CFR 51.45, 51.51, and 51.52 | |||
* Interim Staff Guidance Augmenting NUREG-1537, Chapter 19, Environmental Report. | |||
* The level of detail for each new or different matter should: | |||
* be similar to the level of detail in the construction permit final EIS | |||
* be commensurate with the likelihood of impacts, especially in situations where new or different information could lead to a different conclusion 5 | |||
Consideration of New or Different Information | |||
* Changes to the facility design that could affect the environment, for example: | |||
* building footprint | |||
* excavation depth | |||
* stack height | |||
* construction activities that could affect operations or decommissioning | |||
* Changes to facility operation that could affect the environment, for example: | |||
* number of workers | |||
* new or revised production activities that could change air emissions or dose exposures 6 | |||
Consideration of New or Different Information | |||
* Changes to the natural or physical environment, for example: | |||
* clearing or grading on site | |||
* new activities or facilities surrounding the site | |||
* threatened or endangered species listed or new cultural resource identified since publication of the final EIS | |||
* change in air quality designation | |||
* Changes to the regulatory environment, for example: | |||
* new permits required | |||
* new air quality regulations issued | |||
* New environmental information or studies, for example: | |||
* new environmental studies conducted by the applicant or another organization 7 | |||
Best Practices | |||
* Request pre-application meetings with the NRC staff | |||
* If no change has occurred, provide a brief basis for that conclusion, such as: | |||
* no new regulations published | |||
* no change to the building design | |||
* no change in the physical or natural environment on and surrounding the site | |||
* Include copies of correspondence with any Federal, State, or local agencies since publication of the final EIS 8 | |||
Format | |||
* Length of environmental report and supplemental EIS commensurate with the number and extent of changes. | |||
* Following a similar format of the previous environmental report may help to ensure completeness, consistency, and accuracy. | |||
9 | |||
Discussion}} |
Latest revision as of 11:24, 21 October 2019
ML18096A455 | |
Person / Time | |
---|---|
Site: | SHINE Medical Technologies |
Issue date: | 04/03/2018 |
From: | Michelle Moser NRC/NRR/DMLR/MENB |
To: | |
Moser M, NRR/DMLR, 415-6509 | |
References | |
Download: ML18096A455 (10) | |
Text
Pre-application Meeting Regarding the SHINE Medical Technologies Operating License Application:
Environmental Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission April 3, 2018
Agenda
- Regulatory background
- Consideration of new information
- Best practices
- Format 2
Regulatory Background
- 10 CFR 51.95 (b) requires the NRC staff to prepare a supplemental environmental impact statement (EIS)
- The supplemental EIS will:
- update the prior staff review for the construction permit
- describe matters that differ or that reflect significant new information since publication of the final EIS
- The supplemental EIS does not need to include:
- a discussion of matters that are the same or that have not changed since publication of the final EIS 3
Regulatory Background
- 10 CFR 51.53(b) requires an applicant to prepare an environmental report
- The environmental report should:
- discuss matters that differ or that reflect new information since publication of the final EIS
- The environmental report does not need to include:
- a discussion of matters that are the same or that have not changed 4
Consideration of New or Different Information
- The applicant should consider all matters described in:
- 10 CFR 51.45, 51.51, and 51.52
- Interim Staff Guidance Augmenting NUREG-1537, Chapter 19, Environmental Report.
- The level of detail for each new or different matter should:
- be similar to the level of detail in the construction permit final EIS
- be commensurate with the likelihood of impacts, especially in situations where new or different information could lead to a different conclusion 5
Consideration of New or Different Information
- Changes to the facility design that could affect the environment, for example:
- building footprint
- excavation depth
- stack height
- construction activities that could affect operations or decommissioning
- Changes to facility operation that could affect the environment, for example:
- number of workers
- new or revised production activities that could change air emissions or dose exposures 6
Consideration of New or Different Information
- Changes to the natural or physical environment, for example:
- clearing or grading on site
- new activities or facilities surrounding the site
- threatened or endangered species listed or new cultural resource identified since publication of the final EIS
- change in air quality designation
- Changes to the regulatory environment, for example:
- new permits required
- new air quality regulations issued
- New environmental information or studies, for example:
- new environmental studies conducted by the applicant or another organization 7
Best Practices
- Request pre-application meetings with the NRC staff
- If no change has occurred, provide a brief basis for that conclusion, such as:
- no new regulations published
- no change to the building design
- no change in the physical or natural environment on and surrounding the site
- Include copies of correspondence with any Federal, State, or local agencies since publication of the final EIS 8
Format
- Length of environmental report and supplemental EIS commensurate with the number and extent of changes.
- Following a similar format of the previous environmental report may help to ensure completeness, consistency, and accuracy.
9
Discussion