ML18192B912: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Area and Utility Estimated Area Load Estimated Generating Capacity 59.6 and above 59.5 to 59.1 59.0 to 58.6 58.5 to 58.1 58.0 to 57.6 Automatic Load Shedding Schedule MW Frequency Setting of Relays Hz 57.5 to 57.0 Manual Shedding MW and Hz Total Est.Load Shed MW 59.9 59'59.7 59.6 59.5 59.4 59.3 59.2 Load Restoration Automatic Relay Setting and Megawatts 59.1 Time Delay in Minutes Manual or Superv.MW PVNGS-1,2&3 ER SHORT TERM POWER SHORTAGFS Table BA-1 OPFRATIONS COMMITTEE LOAD SHEDDING AND RESTORATION SUMMARy, 1973 (Sheet 2 of 2)Area No.11 Arizona Public Service 1670 1948 (b)142 423 330 149 1044 63 867 Area No.11 USBR Reg 3 (Lo.Co.)]2 (c)563 368 155(f)297(f)452 (f)20 432 Area No.11 Salt River Project 1525 1265 44 446 305 151 946 946 Area No.11 Tucson Gas&Electric 640 765 39 70 169 268 286 Area No.11 Citizens Information Not Available Utilities Area No.11 Nevada Power Company 934 7 3 8 (e)205 169 94 468 468 Area No.15 Southern California Edison 10390 13400 68 1893 2052 1960 1102 7075 7075 Area No.15 Municipal Water District 317 317 317 317 317 b.Does not include 203.7 MW of firm capacity purchases c.CRSP Firm Schedule to AZ d.Does not include 584 MW of firm capacity purchases e.Does not include 309 MW of firm capacity purchases f.Includes Parker-Davis
{{#Wiki_filter:PVNGS-1,2&3 ER Automatic Load Shedding Schedule                                                  Load Restoration                                              SHORT TERM POWER SHORTAGFS MW                                                    Automatic Relay Setting and Megawatts Frequency Setting    of Relays                                                                                                                      Table BA-1 Hz                        Manual  Total Shedding Est.                                                                  Time  Manual          OPFRATIONS COMMITTEE LOAD Area           Estimated     Estimated   59.6   59.5     59. 0     58.5    58.0 57. 5   MW    Load                                                                Delay    or            SHEDDING AND RESTORATION and            Area      Generating  and      to      to        to      to  to     and    Shed                                                                  in  Superv.        SUMMARy, 1973  (Sheet  2 of 2)
&CRSP Loads S6-BA-3 (BA-5)Supplement No.6 October 10 1975 126}}
Utility          Load        Capacity  above    59. 1    58.6      58. 1    57.6 57.0     Hz     MW     59. 9 59 '   59.7   59.6   59. 5   59.4 59.3   59.2 59.1 Minutes   MW Area No. 11 Arizona Public               1670       1948 (b)           142     423       330       149                 1044     63                                                                 867 Service Area No. 11 (c )
USBR                    ]2 368                       155(f)     297(f)                         452 (f) 20                                                                 432 Reg  3 (Lo. Co .)              563 Area No. 11 Salt River                 1525       1265                 44     446       305       151                 946                                                                         946 Project Area No. 11 Tucson Gas             640       765                 39     70       169                           268                                                                         286
  & Electric Area No. 11 Citizens     Information Not Available Utilities Area No. 11 Nevada (e )
Power                   934       7 38                      205       169         94                 468                                                                         468 Company Area No. 15 Southern             10390       13400                 68   1893       2052     1960 1102           7075                                                                         7075 California Edison Area No. 15               317       317                                                           317   317                                                                         317 Municipal Water District
: b. Does   not include 203.7 MW of firm capacity purchases
: c. CRSP Firm Schedule to AZ
: d. Does not include 584 MW of firm capacity purchases
: e. Does not include 309 MW of firm capacity purchases
: f. Includes Parker-Davis & CRSP Loads S6-BA-3             Supplement No. 6 (BA-5)             October   10 1975 126}}

Latest revision as of 21:36, 20 October 2019

Table 8A-1, PVNGS-1,2&3 Er Short-Term Power Shortages, Operations Committee Load Shedding and Restoration Summary, 1973 (Sheet 2 of 2).
ML18192B912
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/10/1975
From:
Arizona Public Service Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18192B912 (1)


Text

PVNGS-1,2&3 ER Automatic Load Shedding Schedule Load Restoration SHORT TERM POWER SHORTAGFS MW Automatic Relay Setting and Megawatts Frequency Setting of Relays Table BA-1 Hz Manual Total Shedding Est. Time Manual OPFRATIONS COMMITTEE LOAD Area Estimated Estimated 59.6 59.5 59. 0 58.5 58.0 57. 5 MW Load Delay or SHEDDING AND RESTORATION and Area Generating and to to to to to and Shed in Superv. SUMMARy, 1973 (Sheet 2 of 2)

Utility Load Capacity above 59. 1 58.6 58. 1 57.6 57.0 Hz MW 59. 9 59 ' 59.7 59.6 59. 5 59.4 59.3 59.2 59.1 Minutes MW Area No. 11 Arizona Public 1670 1948 (b) 142 423 330 149 1044 63 867 Service Area No. 11 (c )

USBR ]2 368 155(f) 297(f) 452 (f) 20 432 Reg 3 (Lo. Co .) 563 Area No. 11 Salt River 1525 1265 44 446 305 151 946 946 Project Area No. 11 Tucson Gas 640 765 39 70 169 268 286

& Electric Area No. 11 Citizens Information Not Available Utilities Area No. 11 Nevada (e )

Power 934 7 38 205 169 94 468 468 Company Area No. 15 Southern 10390 13400 68 1893 2052 1960 1102 7075 7075 California Edison Area No. 15 317 317 317 317 317 Municipal Water District

b. Does not include 203.7 MW of firm capacity purchases
c. CRSP Firm Schedule to AZ
d. Does not include 584 MW of firm capacity purchases
e. Does not include 309 MW of firm capacity purchases
f. Includes Parker-Davis & CRSP Loads S6-BA-3 Supplement No. 6 (BA-5) October 10 1975 126