ML18192B912

From kanterella
Jump to navigation Jump to search
Table 8A-1, PVNGS-1,2&3 Er Short-Term Power Shortages, Operations Committee Load Shedding and Restoration Summary, 1973 (Sheet 2 of 2).
ML18192B912
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/10/1975
From:
Arizona Public Service Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18192B912 (1)


Text

PVNGS-1,2&3 ER Automatic Load Shedding Schedule Load Restoration SHORT TERM POWER SHORTAGFS MW Automatic Relay Setting and Megawatts Frequency Setting of Relays Table BA-1 Hz Manual Total Shedding Est. Time Manual OPFRATIONS COMMITTEE LOAD Area Estimated Estimated 59.6 59.5 59. 0 58.5 58.0 57. 5 MW Load Delay or SHEDDING AND RESTORATION and Area Generating and to to to to to and Shed in Superv. SUMMARy, 1973 (Sheet 2 of 2)

Utility Load Capacity above 59. 1 58.6 58. 1 57.6 57.0 Hz MW 59. 9 59 ' 59.7 59.6 59. 5 59.4 59.3 59.2 59.1 Minutes MW Area No. 11 Arizona Public 1670 1948 (b) 142 423 330 149 1044 63 867 Service Area No. 11 (c )

USBR ]2 368 155(f) 297(f) 452 (f) 20 432 Reg 3 (Lo. Co .) 563 Area No. 11 Salt River 1525 1265 44 446 305 151 946 946 Project Area No. 11 Tucson Gas 640 765 39 70 169 268 286

& Electric Area No. 11 Citizens Information Not Available Utilities Area No. 11 Nevada (e )

Power 934 7 38 205 169 94 468 468 Company Area No. 15 Southern 10390 13400 68 1893 2052 1960 1102 7075 7075 California Edison Area No. 15 317 317 317 317 317 Municipal Water District

b. Does not include 203.7 MW of firm capacity purchases
c. CRSP Firm Schedule to AZ
d. Does not include 584 MW of firm capacity purchases
e. Does not include 309 MW of firm capacity purchases
f. Includes Parker-Davis & CRSP Loads S6-BA-3 Supplement No. 6 (BA-5) October 10 1975 126