ML19070A356: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of NEXTERA ENERGY SEABROOK, LLC
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of NEXTERA ENERGY SEABROOK, LLC                           Docket No. 50-443-LA-2 (Seabrook Station, Unit 1)
NOTIFICATION The U.S. Nuclear Regulatory Commission staff is filing this notification to inform the Commission and parties that, on March 11, 2019, the Staff issued a final no significant hazards consideration determination and license amendment to NextEra Energy Seabrook, LLC. The amendment revises the Seabrook Station, Unit 1 Updated Final Safety Analysis Report to adopt a methodology for the analysis of seismic Category I structures with concrete affected by alkali-silica reaction.
Respectfully submitted,
                                                  /Signed (electronically) by/
Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 415-0764 E-mail: anita.ghoshnaber@nrc.gov Dated at Colorado Springs, Colorado this 11th day of March 2019


Docket No.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of NEXTERA ENERGY SEABROOK, LLC                             Docket No. 50-443-LA-2 (Seabrook Station, Unit 1)
50-443-LA-2 (Seabrook Station, Unit 1
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing notification, dated March 11, 2019, have been filed through the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 11th day of March 2019.
)    NOTIFICATION The U.S. Nuclear Regulatory Commission staff is filing this notification to inform the Commission and parties that, on March 11, 2019, the Staff issued a final no significant hazards consideration determination and license amendment to NextEra Energy Seabrook, LLC
                                                      /Signed (electronically) by/
. The amendment revises the Seabrook Station, Unit 1 Updated Final Safety Analysis Report to adopt a methodology for the analysis of seismic Category I structures with concrete affected by alkali
Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 415-0764 E-mail: anita.ghoshnaber@nrc.gov}}
-silica reaction. Respectfully submitted,  /Signed (electronically) by/
Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14
-A44 Washington, DC 20555 Telephone: (301) 415
-0764 E-mail: anita.ghoshnaber@nrc.gov Dated at Colorado Springs, Colorado this 11 th day of March 2019 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of NEXTERA ENERGY SEABROOK, LLC Docket No.
50-443-LA-2 (Seabrook Station, Unit 1
)      CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing notification, dated March 11, 2019, have been filed through the Electronic Information Exchange, the NRC's E
-Filing System, in the above
-captioned proceeding, this 11th day of March 2019.         /Signed (electronically) by/
Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44       Washington, DC 20555 Telephone: (301) 415
-0764       E-mail: anita.ghoshnaber@nrc.gov}}

Latest revision as of 23:16, 19 October 2019

NRC Staff Commission Notification Re Issuance of Amendment
ML19070A356
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/11/2019
From: Naber A
NRC/OGC
To:
NRC/OCM
SECY RAS
References
50-443 LA-2, ASLBP-17-953-02-LA-BD01, RAS 54851
Download: ML19070A356 (2)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of NEXTERA ENERGY SEABROOK, LLC Docket No. 50-443-LA-2 (Seabrook Station, Unit 1)

NOTIFICATION The U.S. Nuclear Regulatory Commission staff is filing this notification to inform the Commission and parties that, on March 11, 2019, the Staff issued a final no significant hazards consideration determination and license amendment to NextEra Energy Seabrook, LLC. The amendment revises the Seabrook Station, Unit 1 Updated Final Safety Analysis Report to adopt a methodology for the analysis of seismic Category I structures with concrete affected by alkali-silica reaction.

Respectfully submitted,

/Signed (electronically) by/

Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 415-0764 E-mail: anita.ghoshnaber@nrc.gov Dated at Colorado Springs, Colorado this 11th day of March 2019

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of NEXTERA ENERGY SEABROOK, LLC Docket No. 50-443-LA-2 (Seabrook Station, Unit 1)

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing notification, dated March 11, 2019, have been filed through the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 11th day of March 2019.

/Signed (electronically) by/

Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 415-0764 E-mail: anita.ghoshnaber@nrc.gov