| | issue date = 09/27/2007 | | | issue date = 09/27/2007 |
| | title = G20070585/LTR-07-0553 - Robert Leyse Ltr Nrc'S Reactor Oversight Program | | | title = G20070585/LTR-07-0553 - Robert Leyse Ltr Nrc'S Reactor Oversight Program |
| | author name = Dyer J E | | | author name = Dyer J |
| | author affiliation = NRC/NRR | | | author affiliation = NRC/NRR |
| | addressee name = Leyse R H | | | addressee name = Leyse R |
| | addressee affiliation = - No Known Affiliation | | | addressee affiliation = - No Known Affiliation |
| | docket = 05000346 | | | docket = 05000346 |
|
---|
Category:Letter
MONTHYEARIR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 L-24-025, Submittal of the Updated Final Safety Analysis Report, Revision 352024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) 2024-09-06
[Table view] |
Text
September 27, 2007
Robert H. Leyse P.O. Box 2850 Sun Valley, ID 83353
Dear Mr. Leyse:
I am responding to your e-mail to Dale E. Klein, Chairman of the Nuclear Regulatory Commission (NRC), dated August 20, 2007, regarding the Davis-Besse Exponent report
(AReview and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event@), reactor pressure vessel (RPV) head activities, Energy Northwest and Entergy.
Before I address your questions, I think it is important to note that the NRC has a comprehensive program of inspections for commercial nuclear power plants. NRC stations resident inspectors at each of the nation's operati ng nuclear plants and fuel cycle facilities to carry out daily oversight. Resident inspectors team with region-based specialist inspectors to ensure that licensee programs and performance are adequate and comply with NRC safety requirements. The NRC allocates additional regulatory oversight and inspection resources based on objective indications of licensee performance. If inspectors identify significant safety and/or regulatory issues at the site, the agency requires inspectors to monitor licensee corrective action activities, verify steps are taken to ensure safety, promptly inform NRC management of any significant safety issues, and notify the public.
You asked why the NRC does not make the Davis-Besse Exponent report easily available.
AReview and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event,@ prepared by Exponent Failure Analysis Associates and Altran Solutions Corporation, is publicly available in the NRC
=s Agencywide Documents Access and Management System (ADAMS) under Accession No. ML070860211. Additionally, the report, as well as the NRC
=s assessment of the report, can be accessed through the NRC public Web site: http://www.nrc.gov/reactors/operating/ops-experience/vessel-head-degradation/news/2007/index.html.
Openness is one of the NRC
=s organizational values and is also an important goal in our strategic plan. Accordingly, the NRC considers public involvement in, and information about, our activities to be a cornerstone of strong, fair regulation of the nuclear industry. The NRC releases several hundred documents to the public each work day. These documents are available either from ADAMS or from our Public Document Room (PDR) located at NRC Headquarters in Rockville, MD. The NRC public Web site also contains information and documents that are most pertinent to NRC regulatory activities. In addition, the agency
=s PDR staff can provide assistance to those members of the public who specifically request access to publicly available documents. You can reach the PDR at 1-800-397-4209 or 301-415-4737.
You expressed concern that the NRC may be unaware that other licensees may have files of upper-head activities relevant to regulatory activities. The NRC is confident that degradation of the RPV head experienced at Davis-Besse has not occurred unreported at other pressurized R. Leyse water reactors (PWRs). NRC Order EA-03-009 dated February 11, 2003, as superseded by First Revised Order (EA-03-009) dated February 20, 2004, mandates that licensees conduct comprehensive inspections. The required inspection methods and frequencies are based largely on the susceptibility of the RPV head penetration ma terials to degradat ion mechanisms that would cause leakage. Inspections include visual, nonvisual, and nondestructive examination methods.
Licensee inspections performed in accordance with the requirements of Order EA-03-009 have not, to date, identified significant or unexpected degradation or corrosion of any PWR RPV head. Furthermore, licensee RPV head inspection activities are subject to independent oversight by NRC regional inspectors, and no instances of unreported degradation, other than that which occurred at Davis-Besse, have been identified.
With respect to your comments on the Energy Northwest report on its main condenser, the NRC and inspectors at the site are aware of the main condenser issues and are monitoring the situation closely. If conditions were to arise that bring into question whether the system can perform its function, the NRC will ensure that the licensee takes prompt action.
With respect to your question regarding communications between Entergy and its vendors and/or insurance company after the fuel crudding at River Bend, the NRC has inspected, documented, and taken enforcement action against the licensee for violating their minimum critical power ratio limits with two batches of fuel. The report, ARiver Bend Station - NRC Problem Identification and Resolution-Inspection Report 0500458/2005008,@ is publicly available in ADAMS under Accession No. ML060600503.
Sincerely, /RA/ J. E. Dyer, Director Office of Nuclear Reactor Regulation
Package - ML072550184; Incoming - ML072350046; Response - ML072550181
- concurrence via email OFFICE BC:IPAB Tech Ed
- DORL/NRR DPR/NRR DIRS/NRR NAME JAndersen CHsu LOwen CHaney MCase FBrown DATE 09/12/2007 09/12/2007 09/19/2007 09/19/2007 09/14/2007 09/24/2007
OFFICE OPA OE NRR NAME EBrenner SMagruder JDyer DATE 09/13/2007 09/12/2007 09/27/2007
Letter to Robert H. Leyse from J. E. Dyer dated
DISTRIBUTION: G20070585/LTR-07-0553 Public RidsOpaMail RidsOeMailCenter RidsNrrWpcMail RidsNrrOd RidsNrrAdro RidsNrrDirs RidsNrrDpr RidsNrrDorl RidsRgn4MailCenter RidsNrrDirsIpab RidsEDOMailroom