ML081010277: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 09/08/2008 | | issue date = 09/08/2008 | ||
| title = Renewed Facility Operating License No. DPR-59 / Appendix C - Additional Conditions | | title = Renewed Facility Operating License No. DPR-59 / Appendix C - Additional Conditions | ||
| author name = Le N | | author name = Le N | ||
| author affiliation = NRC/NRR/ADRO/DLR | | author affiliation = NRC/NRR/ADRO/DLR | ||
| addressee name = Howard K | | addressee name = Howard K | ||
| Line 26: | Line 26: | ||
289 Control Room Envelope Habitability Upon Implementation of Amendment No. 289, adopting TSTF-448 Revision 3, the determination of control room envelope (CRE) unfiltered air inleakage required by SR 3.7.3.3 in accordance with TS 5.5.14.c.(i), the assessment of CRE habitability as required by Specification 5.5.14.c.(ii) , and the measurement of CRE pressure as required by Specification 5.5.14.d shall be considered met. Following implementation: | 289 Control Room Envelope Habitability Upon Implementation of Amendment No. 289, adopting TSTF-448 Revision 3, the determination of control room envelope (CRE) unfiltered air inleakage required by SR 3.7.3.3 in accordance with TS 5.5.14.c.(i), the assessment of CRE habitability as required by Specification 5.5.14.c.(ii) , and the measurement of CRE pressure as required by Specification 5.5.14.d shall be considered met. Following implementation: | ||
(a) The first performance of SR 3.7.3.3 in accordance with specification 5.5.14.c(i) shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 3.0.2 as measured from June 28, 2004, the date of the most recent successful tracer gas test, as stated in Entergy's letter "NRC Generic Letter 2003-01 Control Room Habitability Initial Action Summary Report" (JAFP-04-0159), | |||
dated September 27, 2004, or within 18 months if the time period since the most recent successful tracer gas test is greater than 6 years. | dated September 27, 2004, or within 18 months if the time period since the most recent successful tracer gas test is greater than 6 years. | ||
Appendix C (b) The first performance of the periodic assessment of CRE Habitability Specification 5.5.14.c(ii) shall be within three years, plus the 9-month allowance of SR 3.0.2 as measured from June 28, 2004, the date of the most recent successful tracer gas test, as stated in Entergy's letter "NRC Generic Letter 2003-01Control Room Habitability Initial Action Summary Report" (JAFP-04-0159), dated September 27, 2004, or within 9 months if the time period since the most recent successful tracer gas test is greater than 3 years. | Appendix C (b) The first performance of the periodic assessment of CRE Habitability Specification 5.5.14.c(ii) shall be within three years, plus the 9-month allowance of SR 3.0.2 as measured from June 28, 2004, the date of the most recent successful tracer gas test, as stated in Entergy's letter "NRC Generic Letter 2003-01Control Room Habitability Initial Action Summary Report" (JAFP-04-0159), dated September 27, 2004, or within 9 months if the time period since the most recent successful tracer gas test is greater than 3 years. | ||
(c) The first performance of the periodic measurement of CRE pressure, Specification 5.5.14.d shall be within 18 months, plus the 138-day allowance of SR 3.0.2 as measured from the date of the most recent successful pressure measurement test or within 138 days if not performed previously.}} | |||
Revision as of 12:43, 12 July 2019
| ML081010277 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 09/08/2008 |
| From: | Le N NRC/NRR/ADRO/DLR |
| To: | Kent Howard NRC/NRR/ADRO |
| Howard K, NRR/DLR/RLRB, 415-2989 | |
| Shared Package | |
| ML081000578 | List: |
| References | |
| TAC MD2666 | |
| Download: ML081010277 (2) | |
Text
APPENDIX C ADDITIONAL CONDITIONS RENEWED OPERATING LICENSE NO. DPR-59 Amendment Number Additional Conditions 243 Entergy Nuclear Operations, Inc. shall describe snubber operation and surveillance requirements in the Final Safety Analysis Report such that future changes to those requirements will be subject to the provisions of 10 CFR 50.59.
250 Entergy Nuclear Operations, Inc. shall relocate operability and surveillance requirements for logic bus power monitors, core spray sparger differential pressure, and low pressure coolant injection cross-connect valve position instruments to an Entergy-controlled document where future changes to those relocated requirements are controlled under the provisions of 10 CFR 50.59.
274 Entergy Nuclear Operations, Inc. shall relocate the Technical Specification requirements identified in Table LA - "Removal of Details Matrix" and Table R - "Relocated Specifications" to licensee-controlled documents, as described in the application as supplemented on June 12, 2002, and the NRC staff's Safety Evaluation enclosed with Amendment No. 274, dated July 3, 2002. Further, relocations to the updated Final Safety Analysis Report (UFSAR) shall be reflected in the next UFSAR update required by 10 CFR 50.71(e) following implementation of this amendment.
289 Control Room Envelope Habitability Upon Implementation of Amendment No. 289, adopting TSTF-448 Revision 3, the determination of control room envelope (CRE) unfiltered air inleakage required by SR 3.7.3.3 in accordance with TS 5.5.14.c.(i), the assessment of CRE habitability as required by Specification 5.5.14.c.(ii) , and the measurement of CRE pressure as required by Specification 5.5.14.d shall be considered met. Following implementation:
(a) The first performance of SR 3.7.3.3 in accordance with specification 5.5.14.c(i) shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 3.0.2 as measured from June 28, 2004, the date of the most recent successful tracer gas test, as stated in Entergy's letter "NRC Generic Letter 2003-01 Control Room Habitability Initial Action Summary Report" (JAFP-04-0159),
dated September 27, 2004, or within 18 months if the time period since the most recent successful tracer gas test is greater than 6 years.
Appendix C (b) The first performance of the periodic assessment of CRE Habitability Specification 5.5.14.c(ii) shall be within three years, plus the 9-month allowance of SR 3.0.2 as measured from June 28, 2004, the date of the most recent successful tracer gas test, as stated in Entergy's letter "NRC Generic Letter 2003-01Control Room Habitability Initial Action Summary Report" (JAFP-04-0159), dated September 27, 2004, or within 9 months if the time period since the most recent successful tracer gas test is greater than 3 years.
(c) The first performance of the periodic measurement of CRE pressure, Specification 5.5.14.d shall be within 18 months, plus the 138-day allowance of SR 3.0.2 as measured from the date of the most recent successful pressure measurement test or within 138 days if not performed previously.