ML080840082

From kanterella
Jump to navigation Jump to search

ACRS Fitzparick Lr Presentation
ML080840082
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/06/2008
From: Le N, Roy Mathew, Meyer G
NRC/NRR/ADRO/DLR, Division of Nuclear Materials Safety I
To:
Le N. B., NRR/DLR/RLRB, 415-1458
Shared Package
ML080840057 List:
References
Download: ML080840082 (19)


Text

Advisory Committee on Reactor Safeguards (ACRS) License Renewal Full Committee James A. Fitzpatrick Nuclear Power Plant License Renewal Safety Evaluation Report Tommy Le, Sr. Project Manager, NRR Roy Mathew, Audit Team Leader, NRR Glenn Meyer, Inspection Team Leader, RI March 6, 2008 1

Introduction

  • Overview
  • Section 2: Scoping and Screening Review
  • Section 4: Time-Limited Aging Analyses (TLAAs) 2

Overview Recap of September 2007 sub-committee meeting

  • 346 Audit Questions
  • Safety Evaluation Report (SER) With Open Items was issued July 31, 2007 3/4 Two (2) Open Items 3/4 Zero (0) Confirmatory Items 3/4 Three (3) Standard License Conditions 3

License Renewal Inspections Glenn Meyer Inspection Team Leader, Region I 4

Regional Inspection

  • 54.4(a)(2) - non-safety SSCs whose failure could affect safety SSCs
  • Spatial and Structural Interactions
  • LRA Drawings and procedures reviewed
  • Plant walkdowns performed
  • Some components or portions of systems needed to be added to scope 5

Regional Inspection

  • Spatial interaction
  • Structural interaction
  • Scoping and screening 6

Regional Inspection Aging Management

  • Reviewed program implementation for 22 AMPs
  • Reviewed programs, evaluations, and records
  • Program procedures
  • Operational experience information
  • Corrective actions on prior plant issues
  • Interviewed cognizant personnel
  • Performed plant walk downs 7

Regional Inspection Aging Management

  • Regional Administrators Letter To NRR Director issued January 25, 2008 8

Section 2 Conclusion

  • The applicants scoping and screening methodology consistent with the requirements of 10 CFR 54.4 and 54.21(a)(1)

Section 3: Aging Management Review Results Aging Management Programs (AMPs)

- 26 existing AMPs

- 10 new AMPs

  • GALL Report Consistency

- 10 Consistent

- 20 Consistent with exceptions/enhancements

- 6 Plant Specific 10

Section 3: Aging Management Review Results

  • 346 Audit Questions
  • All Questions except two (2) were resolved
  • 2 Questions Converted to RAIs
  • Fifty-five of the Questions Resulted in Revisions to the LRA
  • 25 Commitments at the End of the Audit 11

Section 3 Conclusion

  • Based on its review of the AMRs and AMPs, the staff concludes that the applicant has demonstrated that the effects of aging will be adequately managed so that the intended function(s) will be maintained consistent with the CLB for the period of extended operation 12

Section 4 - TLAAs

  • OI 4.2.1 Reactor Vessel Fluence (Resolved)

º New (Reg Guide 1.190-based) calculation submitted on November 5, 2007

º Methodology acceptable and new value is bounded by initial value

  • OI 4.3.3 Environmentally-Assisted Fatigue (Resolved)

º The applicant submitted Commitment #20

º Will comply with 10 CFR 54.21(c)(1)(iii) 13

Section 4 Conclusion

- 10 CFR 54.3: TLAA list adequate, as amended

- 10 CFR 54.21(c)(1)(i): analyses remain valid for Period of Extended Operation (PEO), (ii): analyses projected to the end of PEO, and (iii): aging effects will be adequately managed for PEO

- 10 CFR 54.21(d): Sufficient supplements to FSAR

- 10 CFR 54.21(c)(2): No plant specific exemptions 14

License Conditions

  • The first license condition requires the applicant to include the UFSAR supplement required by 10 CFR 54.21(d) in the next UFSAR update, as required by 10 CFR 50.71(e), following the issuance of the renewed license.
  • The second license condition requires future activities identified in the UFSAR supplement to be completed prior to the period of extended operation.
  • The third license condition requires that all capsules in the reactor vessel that are removed and tested meet the requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the staff prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the staff, as required by 10 CFR Part 50, Appendix H.

15

STAFF CONCLUSION

  • The staff has concluded that there is reasonable assurance that the activities authorized by the renewed license will continue to be conducted in accordance with the CLB, and that any changes made to the JAFNPP CLB in order to comply with 10 CFR 54.29(a) are in accord with the Act and Commissions regulations.

16

Questions 17

Section 3: Aging Management Review Results [backup slide]

  • Examples: Two Aging Management Programs Containment Inservice Inspection Program - B.1.16.1 Containment Leak Rate Program - B.1.8 SER 3.0.3.3.2 - Containment Inservice Inspection Program:

- Interior Torus Suppression pool area above and below the water line are inspected via IWE program during refueling outages

- Torus was drained / cleaned in 1998, identified areas of pitting

- Over 5 years performed UT and found pitted areas remain acceptable per Code requirements

- During RFO-16 (2004), UT results shown 3 pitted depths 0.019, 0.010, and 0.014, below design (0.632) - Vs 0.503 Code minimum SER 3.0.3.1.1 - Containment Leak Rate Program:

- The Staff finds program elements consistent with the GALL Report. Provides assurance leakage through Primary containment will not exceed Allowable TS value 18

Section 3: Aging Management Review Results [backup slide]

  • Examples: Two Aging Management Programs Containment Inservice Inspection Program Containment Leak Rate Program Consistent with the Staff Interim Guidance LR-ISG-2006-01 No leakage identified in the vicinity of the sand cushion drain line Water leakage monitoring (each refueling) refueling seal bellows drywell air gap drains sand pocket drains functional checks on the alarm system

- The staff finds the AMPs consistent with the GALL report, will manage loss of material, an aging effect caused by corrosion of drywell and torus material 19