| issue date = 09/01/2009
| issue date = 09/01/2009
| title = 2009/09/01-NSP000039-Revised Testimony of Northard/Petersen/Peterson-NRC Mid-2009 Performance Review Report
| title = 2009/09/01-NSP000039-Revised Testimony of Northard/Petersen/Peterson-NRC Mid-2009 Performance Review Report
| author name = West K S
| author name = West K
| author affiliation = NRC/RGN-III/DRP
| author affiliation = NRC/RGN-III/DRP
| addressee name = Schimmel M A
| addressee name = Schimmel M
| addressee affiliation = Northern States Power Co
| addressee affiliation = Northern States Power Co
| docket = 05000282, 05000306, 07200010
| docket = 05000282, 05000306, 07200010

Revision as of 04:26, 11 July 2019

2009/09/01-NSP000039-Revised Testimony of Northard/Petersen/Peterson-NRC Mid-2009 Performance Review Report
ML102460615
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/01/2009
From: Khadijah West
Division Reactor Projects III
To: Schimmel M
Northern States Power Co
SECY RAS
Shared Package
ML102460550 List: ... further results
References
50-282-LR, 50-306-LR, ASLBP 08-871-01-LR-BD01, RAS 18555
Download: ML102460615 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 1, 2009 Mr. Mark A. Schimmel Site Vice President (Acting) Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East

Welch, MN 55089

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 AND 2

Dear Mr. Schimmel:

On August 20, 2009, the NRC staff completed its performance review of Prairie Island Generating Plant, Unit 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan. Plant performance for the most recent quarter at Prairie Island Unit 1, was within the Regulatory Response column of the NRC

=s Action Matrix based on two inspection findings (one in the Mitigating Systems cornerstone and one in the Public Radiation Safety cornerstone) being classified as having low to moderate safety significance (White). The White finding in the Mitigating Systems cornerstone, from the fourth quarter of 2008, involved failure of the turbine driven auxiliary feedwater (TDAFW) pump to operate subsequent to a valid start signal. The other White inspection finding in the Public Radiation Safety cornerstone, from the first quarter of 2009, involved a radioactive material shipment from your facility that did not conform to the applicable Department of Transportation (DOT) regulatory requirements when it arrived at the shipping destination. Plant performance for Prairie Island Unit 2 for the most recent quarter was also within the Regulatory Response column of the NRC

=s Action Matrix based on one inspection finding in the Public Radiation Safety cornerstone being classified as having low to moderate safety significance (White) as discussed above. Although plant performance of Unit 2 NSP000039 M. Schimmel was within the Regulatory Response column, the significance of a preliminary White finding for inadequate design of the component cooling water system (IR 2009010) is still under review as part of the Significance Determination Process. This issue, when finalized, may change our assessment of your plant

=s safety performance. On July 13, we were notified by your staff of your readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the White finding for the TDAFW pump issue. We began a supplemental inspection (95001) in response to this White finding on August 31, 2009. We also plan to conduct another supplemental inspection (95001) in response to the White finding in the Public Radiation Safety cornerstone. Please notify us of your readiness to conduct this supplemental inspection. These supplemental inspections are in addition to Reactor Oversight Process (ROP) baseline inspections at your facility. In addition, the staff has identified a substantive cross-cutting issue (SCCI) in the area of human performance (HP) with cross-cutting themes in the aspects of systematic process (H.1(a)), conservative assumptions (H.1(b)), procedural adequacy (H.2(c)), and procedural compliance (H.4(b)). During this assessment period, there were 25 findings documented with cross-cutting aspects in the HP area. Of these 25 findings, four shared a common cross-cutting aspect of systematic process, six findings with conservative assumptions, five findings with procedural adequacy, and four findings with procedural compliance. The SCCI will remain open until all cross-cutting themes have been cleared in the area of HP. To clear each theme, we will assess whether your corrective actions have resulted in a positive sustainable improvement in the area and will consider the number of findings in the theme. We are requesting to meet with you to discuss the adverse trend in human performance. A public meeting will accommodate this discussion at an agreed upon time and location. Please contact us within 30 days of receipt of this letter to discuss arrangements for this meeting. The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the End-of-Cycle review. In accordance with 10 CFR 2.390 of the NRC

=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

M. Schimmel If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact John (Jack) B. Giessner at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/K. Steven West, Director Division of Reactor Projects Docket Nos. 50-282; 50-306;72-010 License Nos. DPR-42; DPR-60; SNM-2506

Enclosure:

Prairie Island Inspection/Activity Plan cc w/encl: D. Koehl, Chief Nuclear Officer J. Anderson, Regulatory Affairs Manager P. Glass, Assistant General Counsel Nuclear Asset Manager J. Stine, State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota Emergency Preparedness Coordinator, Dakota County Law Enforcement Center Council Administrator President, Prairie Island Tribal Council Goodhue County Sheriff Director, Pierce County Emergency Management Agency Chair, Pierce County Board of Commissioners Chair, Dakota County Board of Commissioners Mayor of Red Wing Director, Goodhue County Emergency Management Agency Chair, Goodhue County Board of Commissioners Pierce County Sheriff Dakota County Sheriff G. Mortensen, INPO Letter to M. Schimmel from K. Steven West dated September 1, 2009.

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 AND 2 DISTRIBUTION

Susan Bagley

RidsNRRDORlLpl3-1

RidsNRRPMPrairieIsland Resource RidsNrrDirsIpob Resource Cynthia Pederson Steven Orth

Jared Heck

Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak

ROPreports Resource M. Schimmel If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact John (Jack) B. Giessner at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/K. Steven West, Director Division of Reactor Projects Docket Nos. 50-282; 50-306;72-010 License Nos. DPR-42; DPR-60; SNM-2506

Enclosure:

Prairie Island Inspection/Activity Plan cc w/encl: D. Koehl, Chief Nuclear Officer J. Anderson, Regulatory Affairs Manager P. Glass, Assistant General Counsel Nuclear Asset Manager J. Stine, State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota Emergency Preparedness Coordinator, Dakota County Law Enforcement Center Council Administrator President, Prairie Island Tribal Council Goodhue County Sheriff Director, Pierce County Emergency Management Agency Chair, Pierce County Board of Commissioners Chair, Dakota County Board of Commissioners Mayor of Red Wing Director, Goodhue County Emergency Management Agency Chair, Goodhue County Board of Commissioners Pierce County Sheriff Dakota County Sheriff G. Mortensen, INPO See Previous ConcurrencesDOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2008 to 2009\Mid-cycle letters\ PrairieIsland 2009 MOC Letter.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIINAMETran:dtp*JGiessner*KSWestDATE08/25/0908/25/0908/31/09 OFFICIAL RECORD COPY Inspection / Activity Plan 09/01/2009

-12/31/2010 Planned Dates Start End Inspection Activity Title No. of Staff on Site Prairie Island BI ENG-INSERVICE INSPECTION & TI-172 REVISION 1 1 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 09/14/2009 09/26/2009 IP Inservice Inspection Activities - PWR 7111108P 09/14/2009 09/26/2009 SUP95001-SUPPLEMENTAL INSPECTION 95001 - TDAFP 3 IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 95001 08/31/2009 09/04/2009 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP A ccess Control to Radiologically Significant Areas 7112101 09/21/2009 09/25/2009 IP A LARA Planning and Controls 7112102 09/21/2009 09/25/2009 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 10/05/2009 10/09/2009 IP Occupational Exposure Control Effectiveness 71151-OR01 10/05/2009 10/09/2009 IP RETS/ODCM Radiological Effluent 71151-PR01 10/05/2009 10/09/2009 ISFSI-ISFSI INSPECTION 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 11/01/2009 11/30/2009 OL PREP-PR. ISLAND INIT PREP MARCH/2010 3 OL - INITIAL EXAM - APRIL 2010 - PRAI W90224 03/15/2010 03/19/2010 OL EXAM-PR. ISLAND INIT EXAM - APRIL 2010 3 OL - INITIAL EXAM - APRIL 2010 - PRAI W90224 04/12/2010 04/23/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP A ccess Control to Radiologically Significant Areas 7112101 04/26/2010 04/30/2010 IP A LARA Planning and Controls 7112102 04/26/2010 04/30/2010 BI ENG-ENGINEERING INSERVICE INSPECTION 1 IP Inservice Inspection Activities - PWR 7111108P 04/26/2010 05/28/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Radioactive Material Processing and Transportation 7112202 05/10/2010 05/14/2010 BI ENG-COMPONENT DESIGN BASES INSPECTION 6 IP Component Design Bases Inspection 7111121 06/28/2010 07/30/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 07/26/2010 07/30/2010 IP Reactor Coolant System Activity 71151-BI01 07/26/2010 07/30/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP A ccess Control to Radiologically Significant Areas 7112101 08/09/2010 08/13/2010 IP A LARA Planning and Controls 7112102 08/09/2010 08/13/2010 IP Reactor Coolant System Activity 71151-BI01 08/09/2010 08/13/2010 IP Occupational Exposure Control Effectiveness 71151-OR01 08/09/2010 08/13/2010 Inspection / Activity Plan 2 09/01/2009

-12/31/2010 Planned Dates Start End Inspection Activity Title No. of Staff on Site Prairie Island BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP RETS/ODCM Radiological Effluent 71151-PR01 08/09/2010 08/13/2010 BI EP-EP EXERCISE / PI VERIFICATION 3 IP Exercise Evaluation 7111401 08/23/2010 08/27/2010 IP Drill/Exercise Performance 71151-EP01 08/23/2010 08/27/2010 IP ERO Drill Participation 71151-EP02 08/23/2010 08/27/2010 IP A lert & Notification System 71151-EP03 08/23/2010 08/27/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 11/15/2010 11/19/2010