ML11111A097: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/25/2011
| issue date = 04/25/2011
| title = 2011 Point Beach Nuclear Plant Initial License Examination ES-301-2 RO JPMs Form.Pdf
| title = 2011 Point Beach Nuclear Plant Initial License Examination ES-301-2 RO JPMs Form.Pdf
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =  
| addressee name =  

Revision as of 21:25, 10 July 2019

2011 Point Beach Nuclear Plant Initial License Examination ES-301-2 RO JPMs Form.Pdf
ML11111A097
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/25/2011
From: Mcneil D
Operations Branch III
To:
References
Download: ML11111A097 (1)


Text

ES-301 Control Room/In

-Plant Systems Outline Form ES-301-2 Facility: Point Beach Date of Examination: 04/25

-5/6/2011 Exam Level: RO SRO-I SRO-U Operating Test No.: 2011301 Control Room Systems

@ (8 for RO); (7 for SRO

-I); (2 or 3 for SRO

-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function a. CRD / Recovery of a Dropped Rod A/N/S 1 b. CVCS / Respond to Failure of Normal Boration Path D/S 2 c. SI / Restore 1A Accumulator Pressure D/S 3 d. TG / Synchronize Turbine Generator with Grid D/S 4S e. HVAC / Perform Accident Recirc Fan

-Cooler Surveillance D/L/S 5 f. RH R / Respond to a Shutdown LOCA D/L/S 4P g. CCW / Switch Operating CCW Pumps D/S 8 h. RPS / Monthly RPS Surveillance A/N/S 7 In-Plant Systems

@ (3 for RO); (3 for SRO

-I); (3 or 2 for SRO

-U) i. EDG / Local Manual Start of an EDG A/N/P 6 j. RHR / Transfer to Containment Sump Recirculation D/P 4P k. AFW / Perform Designated AOP 10 A Steps D/P 4S @ All RO and SRO

-I control room (and in

-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in

-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO

-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in

-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 - / - / selected)