ML11144A078: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/02/2011
| issue date = 03/02/2011
| title = Relief Request No. 10-ON-001, Response to Request for Additional Information
| title = Relief Request No. 10-ON-001, Response to Request for Additional Information
| author name = Gillespie T P
| author name = Gillespie T
| author affiliation = Duke Energy Carolinas, LLC
| author affiliation = Duke Energy Carolinas, LLC
| addressee name =  
| addressee name =  

Revision as of 17:08, 10 July 2019

Relief Request No. 10-ON-001, Response to Request for Additional Information
ML11144A078
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/02/2011
From: Gillespie T
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML11144A078 (36)


Text

'Duke rEEnergy, T. PRESTON GILLESPIE, Jr.Vice President Oconee Nuclear Station Duke Energy ONO VP / 7800 Rochester Hwy.Seneca, SC 29672 864-873-4478 864-873-4208 fax T. Gillespie@duke-energy.

com March 2, 2011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, 50-270, and 50-287 Relief Request No. 10-ON-001 Response to Request for Additional Information By letter dated June 9, 2010 (Agencywide Document Access and Management System (ADAMS) Accession No. ML101660473), Duke Energy Carolinas, LLC (Duke Energy), submitted Relief Request No. 10-ON-001 for the use of an alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, IWC-2500 for examination of nozzle to shell welds on the Residual Heat Removal (RHR) Heat Exchangers.

On December 15, 2010, the NRC Staff electronically requested additional information regarding this request. The additional requested information, as well as Duke Energy's response, is provided in the enclosure.

If you have any questions or require additional information, please contact Corey Gray at (864) 873-6325.Sincerely,-_X7P d1LLe5P/C_

T. Preston Gillespie, Jr.Oconee Site Vice President Enclosure Ae~lt7 N11UL, www. duke-energy.

com U. S. Nuclear Regulatory Commission March 2, 2011 Page 2 xc w/enclosure:

Victor McCree Region II Administrator U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 John Stang Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555 xc w/o enclosure Andy Sabisch NRC Senior Resident Inspector Oconee Nuclear Station Susan Jenkins Section Manager Division of Waste Management Bureau of Land and Waste Management SC Dept. of Health & Environmental Control 2600 Bull St.Columbia, SC 29201 Enclosure Request for Additional Information Relief Request 10-ON-001 Alternative to Volumetric Examination Requirements for the Residual Heat Removal (RHR) Heat Exchanger Class 2 Nozzle-to-Shell Welds Duke Energy Carolinas, LLC Oconee Nuclear Station, Unit 1, 2, and 3 Docket No. 50-269, -270, -287 1. Please state whether previous inservice inspections of the RHR HXs have detected any signs of leakage or age-related degradation in the subject RHR HX welds at Oconee Nuclear Station, Units 1, 2, and 3.Response: a. VT-2 visual examinations performed on the RHR Heat Exchangers at Oconee Nuclear Station, Units 1, 2, and 3 during the 1 st, 2 nd, 3 rd, and 4 th Inservice Inspection Interval have not detected any evidence of leakage from these RHR Heat exchangers, including the welds for which relief has been requested.

b. Surface examinations performed on the nozzle Mk. "M" and "N" reinforcing pad-to-shell welds and reinforcing pad-to-nozzle welds on the RHR Heat Exchangers at Oconee Nuclear Station, Units 1, 2, and 3 during the 1 st, 2 nd 3 rd, and 4 th Inservice Inspection Interval have not detected any unacceptable indications.
c. Volumetric examinations performed on the shell-to-head flange welds and shell-to-tubesheet flange welds (adjacent to Nozzles Mk. "M" and "N") on the RHR Heat Exchangers at Oconee Nuclear Station, Units 1, 2, and 3 during the 1 st, 2 nd, 3 rd, and 4 th Inservice Inspection Interval have not detected any unacceptable indications.

These results provide additional evidence that there has been no service-induced degradation on the I.D. of the LPI Coolers in the vicinity of the Nozzle Mk. "M" and "N" nozzle-to-shell welds for which relief has been requested.

Note: Prior to implementing Code Case N-706, a limited number of C1.10 volumetric examinations were performed on these shell welds during the 4 th Inservice Inspection Interval.

These Item C1.10 examinations have since been discontinued as a result of implementing Code Case N-706 which was justified, in part, because no service induced degradation or leakage had occurred in the shell circumferential welds.d. The nozzle-to-shell welds for which relief has been requested have not received any inservice volumetric examinations.

However, the inservice volumetric examinations performed on the adjacent shell-to-head flange and shell-to-tubesheet flange welds during the 1 st, 2 nd 3 rd , and 4 th Inservice Inspection Intervals provide reasonable assurance that the service conditions within the RHR Heat Exchangers have not resulted in any age-related degradation in the nozzle-to-shell welds for which relief has been requested.

0AI64 71V 61 March 2, 2011 Memo to File

Subject:

Oconee Nuclear Station Unit 3 EOC-26 Service Water Piping Inspection Program Outage Planning File No.: OS-210.24 The Service Water Piping Inspection Program (SWPIP) program outage plan for Oconee Unit 3 EOC-26 was originated and reviewed by Geary L. Armentrout (ONS-PCE) and Steve Lefler, Jr.(NGO-MMP).

This process involved a detailed review of the following program tools: " Flow regime models to determine locations most susceptible to corrosion.

  • Review of stress analysis models to determine locations of high stress." Inspection locations previously inspected that are due for re-inspection.
  • Current and previous Industry Issues.The inspection plan is summarized on the following page and includes the necessary information for outage planning.

There are twenty-five (25) inspection locations to be examined using Ultrasonic Testing (UT). All Work Requests written within milestone dates Note the following:

  • These are 'corrosion' inspections; not 'erosion' inspections.

Therefore, grid and prep procedure SM/O/B/8530/002 as well as exam procedure NDE-946 apply.* Where possible, these inspections can be slotted during the pre-outage window, utilizing personnel mobilized to support pre-outage ISI inspections.

All revisions to the plan will require the signatures of the station SWPIP coordinator and the corporate SWPIP representative in accordance with SWPIP Program requirements.

UT Data sheets for each inspection location are also included as an attachment.

G6eay L. ArmEntr ONS SWPIP Engineer cc w attachments:

cc w/o attachments:

Kenny McCorkle Jack Crowe Rod Sheffield Willie Ford Dan Harden Paul Terry Steve Lefler, Jr.Sammy Oates John Bryant Sheila Henderson Vance Bowman Danny Winchester Andrew Henson Joe Herrick ONS NDE Coordinator ONS Planning NGS Inspection Services NMS Welding ONS Work Control ONS Work Control NGO E/C Coordinator ONS Maintenance Support ONS QA/QC ONS Document Management ONS Core Team Rep (Rapid Response Team)ONS On-Line Work Window Manager CNS E/C Coordinator MNS E/C Coordinator ONS Unit 3 EOC-26 SWPIP Program Inspection Plan, Rev. 0 UT Code lPriori Description Status Comments Condenser Circulating Water System (C__C3CCW003 1 12" Pipe Re-inspection

-Ref. WO 01958233 Can do during Pre-outage Window C3CCW005 1 14" Pipe Re-inspection

-Ref. WO 01958185 Can do during Pre-outage Window C3CCW006 1 36"x14" Tee Re-inspection

-Ref. WO 01955462 Can do during Pre-outage Window C3CCW007 1 3" Pipe Re-inspection

-Ref. WO 01955466 Can do during Pre-outage Window C3CCW008 1 16" Pipe Re-inspection

-Ref. WO 01955467 Can do during Pre-outage Window C3CCW010 1 8"x4" Tee Re-inspection

-Ref. WO 01958231 Can do during Pre-outage Window Low Pressure Service Water System (LPS)C3LPS002 1 14" Pipe Re-inspection

-Ref. WO 01958229 Can do during Pre-outage Window C3LPS005 1 24" Pipe Re-inspection

-Ref WO 01958230 Can do during Pre-outage Window C3LPS006 1 10" Pipe Re-inspection

-Ref. WO 01956438 Can do during Pre-outage Window C3LPS007 1 16" Pipe Re-inspection

-Ref. WO 01956388 Can do during Pre-outage Window C3LPS012 1 8" x 3" Tee Re-ins ection -Ref. WO 01956387 Can do during Pre-outage Window C3LPS013 1 36"x14" Tee Re-inspection

-Ref. WO 01956385 Can do during Pre-outage Window C3LPS014 1 14" x 10" Tee Re-inspection

-Ref. WO 01956384 Can do during Pre-outage Window C3LPS019 1 4" Pipe Re-inspection

-Ref. WO 01956383 Can do during Pre-outage Window C3LPS020 1 16" Pipe Re-inspection

-Ref. WO 01964143 Can do during Pre-outage Window C3LPS024 1 8"x1" Tee Re-inspection

-Ref. WO 01955438 Outage Related C3LPS029 1 8"xl" Tee Re-inspection

-Ref. WO 01956381 Can do during Pre-outage Window 30"x3" Tee C3LPS032 1 w/6" Branch Re-inspection

-Ref. WO 01956379 Can do during Pre-outage Window C3LPS033 1 8" x 12" Reducer Re-inspection

-Ref. WO 01956377 Can do during Pre-outage Window C3LPS044 1 3" Pipe Re-inspection

-Ref. WO 01955443 Can do during Pre-outage Window Page 1 of 2 ONS Unit 3 EOC-26 SWPIP Program Inspection Plan, Rev. 0 UT Code Priority Description Status Comments C3LPS046 4" Pipe Re-inspection

-Ref. WO 01955447 Outage Related C3LPS047 1 2" Pipe Re-inspection

-Ref. WO 01964198 Can do during Pre-outage Window High Pressure Service Water System (HP__)C3HPS002 1 4" Pipe Re-inspection

-Ref. WO 01955450 Can do during Pre-outage Window C3HPS003 1 4" Pipe Re-inspection

-Ref. WO 01955456 Can do during Pre-outage Window C3HPS004 1 4" Pipe NEW inspection

-Ref. WO 01955459 Can do during Pre-outage Window Auxiliary Service Water System (ASW)None required this outaj SSF Auxiliary Service Water System (SAS)None required this outaj Equipment Cooling System (EC)None required this outal~I Essential Siphon Vacuum System (ESV_None required this outaI Siphon Seal Water System (SSW_None required this outa_Keowee Turbine Generator Cooling Waiter System W_None required this outa_Keowee Service Water System (KSW)None required this outaI Keowee Turbine Sump Pump System ( S____)Nonereured this outa_Page 2 of 2 Form NDE-FIA Revision 1 DUKE ENERGY REQUEST FOR QAIQCINDE MISCELLANEOUS INSPECTION I EXAMINATION Station: ______ Unit: 3 Work Order: j/,4qa,#s Date: .4 &.. PIP: A/IA Location of Inspection:

Perform UT thickness exam (Service Water Piping Inspection Program related) for the attached UT requests.

Unless otherwise specified on attached UT data sheets, inspections are to be Scope of Inspection:

prepped/gridded based on procedure SMAOIBI85301002 (corrosion

-not erosion), and UT is to be performed based on NDE-946. Record results on ER/CR Inspection form and forward to Geary Armentrout (x-4322,fax-3402).

Applicable Design Docs: Acceptance Criteria: Requested By:!5ý4ý en Date: a_/& /I/-~ ~Rnnim~~nr

~scflnn R stor Section Inspection Type I Technical Instructions Mech. El Elect. El Civil El VT El NDE [E Procedure No.Special Instructions:

QA Tech Review By: Date: OA Reviewer Section Inspection Results Inspection Performed By: Level Date Data Attached El Inspector Section PIPING/FITTING UT DATA SHEET Unit: Building: Elevation:

Column: System: 3 TB Ground Floor Pipe Elev. 800'D/49 CCW Material C.S. UT Code #O.D. (nom) 120 Pipe Row Diagram Schedule Std. Dwg.(s): Original Wall Thk. 0.375 Min. Wall Thik. 122(87.5%-7 0.250-(66.7%)

C3CCW0O03 OFD-133A-3.2 O-24O00Q 50 PSIG @ 100 F Class F (OSC-523)Fitting Is upstream/

downstream of Valve 3CCW-3 Previous Inspection data: Remarks Piping Engineer.mace fiarre 4 A-_Notes: Inspect pipe In riser lust above elbow. Use 1 "xI" grids Date: starting 1" away from weld to elbow.Gdd 12 -1 bands along riser.'Ed'.U,.J on ----a m m m %.3 CMb4-3 -10'%1- 5 c 3C ()t$63 :F,)7 Nvo Inspect per NDE-946.Grid per Procedure SWO/B/8530t02 (this is 'Corrosion'

-NOT 'Eroslon/Corroslon (E/C)'Inspection Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)L LAJE4I~

PIPING/FITTING UT DATA SHEET Unit: 3 Building:

TB Basement Elevation:

Pipe Elev. 771'+9" Column: BC / 48-49 System: CCW Material C.S.O.D. (nom) 14" Schedule Original Wall Thk.Min. Wall Thk.Std.0.375" 0.328"(87.5%), 0.2!Flow Regime: 3 of UT Code # C3CCWO05 Flow Diagram OFD-133A-3.2 Dwg.(s): 0-2407A 50 PSIG @ 1000 F Class F (OSC-1828-50"(66.7%)

03)4 3-13-10 (dcp AB01)VeCitting is u sta d Previous inspection data: Remarks Piping Engineer:.

.. .... -, Date: Notes: Inspect 14" pipe between valve 3CCW-342 and 36" CCW header Inspect per NDE-946.Grid per Procedure SMIO/B/85301002 (this is 'Corrosion'

-NOT 'Erosion/Corrosion (E/C)'Inspection-SECTION GC Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

PIPING/FITTING UT DATA SHEET Unit: Building: Elevation:

Column: System: 3 TB Basement Pipe Elev. 771'+9" K-J/50-51 CCW Material C.S. UT Code #O.D. (nom) 36"x14" Tee Flow Diagram Schedule Std. Dwg.(s): Original Wall Thk. 0.375" Min. Wall Thk. 0.328'(87.5%), 0.250"(66.7%)

Flow Regime: 2 C3CCWO06 OFD-133A-3.1 0-2407B 50 PSIG @ 1000 F Class F (OSC-1828-01)3-13-08 (dcp 23)Piping/ fttin is upstream/

downstream of Valve 3CCW-341 Previous inspection data: Remarks Piping Engineer:

B %#6@4wvff*-,040------

-Notes: Inspect 36" x 14" Tee Date: Inspect per NDE-946.Grid per Procedure SM/OlB185301002 (this Is 'Corrosion'

-NOT 'Erosion/Corrosion (EIC)'Inspection Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

PIPING/FITTING UT DATA SHEET Unit: Building: Elevation:

Column: System: 3 TB Basement Pipe Elev. 777'+2" G46 CCW Material CS UT Code #O.D. (nom) 3" Pipe Flow Diagram Schedule 40 Dwg.(s): Original Wall Thk. 0.216" Min. Wall Thk. 0.189"(87.5%), 0.144"(66.7%)

C3CCW0O07 OFD-133A-3.2 (G5)0-2407A 50 PSIG@ 100- F Class G (OSC-3998)

Max. Stress location Piping/ Fitting is upstream/

downstream of Previous inspection data: Piping Engineer:

Inspect 3" pipe Notes: just upstream of valve valve 3CCW-88 Remarks Date: Inspect per NDE-946.Grid per Procedure SM/O/B/85301002 (this is 'Corrosion'

-NOT 'Erosion/Corrosion (E/C)'Inspection BSM'T FLOOR EL. 775'-0'7 S E.F.W. PUMP TURB--'OIL COOLER PUMP SECTION C-C (B-B)SCALE z3/4" = 1" -0" Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

PIPING/FITTING UT DATA SHEET Unit: Building: Elevation:

Column: System: 3 Material CS UT Code #Turbine Building O.D. (nom) 8"x4" Tee Flow Diagram 789' Schedule 40 Dwg.(s): Original H42 Wall Thk. 0.332/0.237 Min. Wall CCW Thk. 0.282" (87.5%), 0.215" (66.7%)0.207" (87.5%), 0.158" (66.7%)C3CCW010 OFD-133A -3.4 [G-8]0-24000 50 PSIG @ 1O 0°F Class G Piping/ Fitting is upstream/

downstream of Previous inspection data: n/a Piping Engineer:

Geary L. Armentrout Notes: Inspect 8"x4" tee using 1" x 1" grids. M valve 3CCW-97 Remarks ______________

___Date: 2/2412007 valve 3CCW-97 Remarks law , A 3CCW-97 Inspect per NDE-946.Grid per Procedure SMWO/B/8530/002 (this is 'Corrosion'-

NOT 'Erosion'Inspection

--3CCW-39--i('M 6" 150*WN FF FLG.(TYP.2)-U9 3CCW - -6"-300#WN RF -FLG. (TYP. 2) -LI 6"x 4"RED- C 3PG-72-r$ -zA #ie- y Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

PIPING/FITTING UT DATA SHEET Unit: Building: Elevation:

Column: System: 3 TB Ground Floor Pipe Elev. 804'+3" G155 LPSW Material C.S. UT Code #O.D. (nom) 14" Pipe Flow Diagram Schedule Std. Dwg.(s): Original Wall Thk. 0.375 Min. Wall Thk. 0.328- (87.5%Y0.250"(66.7/%)

C3LPSO02 OFD-124A-3.2 0-2401F 100 PSIG @ 100@ F Class G Pipin Fitting is upstream/

downstream of Previous inspection data: 4e.ay4% z ~~'$g Piping Engineer:

r -... ..Notes: Using 1 "xl" grids, Inspect pipe and elbow. Start on elbow 1" away from weld, and grid (1) -1" band.Then continue onto pipe with (11) -1" bands (starting 1" away from weld).3LPSW-49 Remarks Date:©_Inspect per NDE-946.Grid per Procedure SM/O/B18530/002 (this Is 'Corrosion'

-NOT "Erosion/Corrosion (E/C)Y Inspection Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date),Cod/~er 9A C.&Olde3 PIPING/FITTING UT DATA SHEET Unit: 3 Building:

TB Basement It Elevation:

Pipe Elev. 789' + (o Column: U447 System: LPSW Material C.S. UT Code #O.D. (nom) 24" Pipe Flow Diagram Schedule Std. Dwg.(s): Original Wall Thk. 0.375 Min. Wall Thk. 0.326" (87.5%)/ .250"(66.7%)

C3LPS005 OFD-124A-3.1 0-2400J 100 PSIG @ 100° F Class F (OSC-530)Pinin Fitting is upstream/

downstream of Previous inspection data: Piping Engineer-.

Bruce Jarrett x-4340 Notes: Using 1"x1 "grids, Inspect pipe adjacent to valve. Starting 1w valve 3LPSW-132 Remarks Date: 5 awa fomd1ve gd 111bands.6i. i1gq; , Inspect per NDE-946.Grid per Procedure SWO/BA8530/002 (this Is 'Corrosion'

-NOT 'Erosion/Corrosion (E/C)l Inspection t444&h&-4 El. 17751 L~kbi.cj ~Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

PIPING/FITTING UT DATA SHEET Unit: Building.Elevation:

Column: System: 3 Material C.S. UT Code #Aux. Bldg.East Pen Rm. O.D. (nom) 10" Pipe Flow Diagram Pipe Elev. 816'+0" Schedule XS Dwg.(s): Original Pen 22 Wall ink. 0.5" Min. Wall LPSW Thk. 0.438"(87.5%), 0.334-(66.7%)

C3LPSO06 OFD-124B-3.4/G13 0-2439D / F11 180 PSIG 0 1000 F Class F (0SC-532)Flow Regime: 4 Piping/ Fitting is upstream/

downstream of Penetration 22 & upstream of valve 3LPSW-15 Previous inspection data: Remarks Piping Engineer:

Bruce Jarrett x-4340 Date: Notes: Grid and inspect pipe by procedure. i$0- Stf01 4iL)i Inspect per NDE-946.3LPSW- 15 ROTATE OPERAI Grid per Procedure 10 SOUTH OF SM/OIB/8530/002 (this is 'Corrosion'

-NOT 'EroslonlCorrosion (EIC)' 9. lPSW EL.81 Inspection

..S.FRjo. mmax.: CCOsiT ejz=I.I Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

PIPING/FITTING UT DATA SHEET Unit 3 Material C.S. LIT Code # 21 AGWool Building:

Aux. Bldg. 2nd F/r. O.D. (nom) 16 Pipe Flow Diagram OF0-124B-3.1/IL L Elevation:

Pipe Elev. 797' Schedule Std. Dwg.(s): 0-2437B Original.Column: QaI96 Wall Thk. 0.375 100 PSIG @ 100° F Mn. Wall System: LPSW Thk. 0.328" (87.5%Y0.250"(66.7%)

Class F (0SC-35)DInaFitting is upstrean/

[downstrea,,f valve 3LPSW-71 Previous inspection data: Remarks 4*c4* 40mo*4rowir

  • 3 7-..Piping Engineer:

__________

Notes: Using 1 "xl" gdds, Inspect pipe adlacent to valve. Startng 1 Date: away from valve, grid (12M -bands In spect per NDE-946&el.Gild per Procedure SM/O/B/853W/O02 (this is Vorrosion'

-NOT 'Eroson/Corrosion (EIC)'lnsean Location Sketch Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

I 049P '06.41 V.EILAP RE(GION PIPE CLASS BOUNDAPUES

"-IE.C!" VALV PIPING/FITTING UT DATA SHEET Unit: Building: Elevation:

Column: System: 3 Material C.S. UT Code #Aux. Bldg. O.D. (nom) 8"x8" Tee Flow Diagram Pipe Elev. 825'+0" Schedule 40 Dwg.(s): Original 0-96 Wall Thk. 0.322" Min. Wall LPSW Thk. 0.282"(87.5%), 0.215-(66.7%)

Flow Regime: 4 C3LPS012 OFD-124B-3.2 0-2439B j 100 PSIG @ 100o F Class F (OSC-535)3-14-06 (dcp 84)Piping/ ftt is upstream/

downstream of Valve 3LPSW-79----Previous inspection-data:-

--- -------Remarks------


Piping Engineer.

Bruce Jarrettx-4340 Date: Notes: Inspect 8 x 8" Tee' I I IIP rk f! rH Inspect per NDE-946.Grid per Procedure SM/01818530/002 (this is Corrosion'

-NOT 'Erosion/Corrosion (EFC)" Inspection Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

/PIPING/FITTING UT DATA SHEET Unit: 3 Building:

TB Basement Elevation:

Pipe Elev. 783'+6" Column: L-46 System: LPSW Material C.S.O.D. (nom) 36"x14" Tee UT Code # C3LPS013 Flow Diagram OFD-124A-3.1 Schedule Original Wall Thk.Min. Wall Thk.Std.Dwg.(s): 0.375" 0.328"(87.5%), 0.250"(66.7%)

Flow Regime: 2 off 4 0-2400J 100 PSIG @ 100' F Class F (OSC-530)3-14B-01 (dcp 49)Piping/ EFt is upstream downstream of Valve 3LPSW-139 Previous inspection data: Remarks Piping Engineer:

..=.-____ ________Notes: Inspect 36"x14" reinforced Date: Grid per Procedure SWO/B/85301O02 (this Is 'Corrosion'

-NOT 'Erosion/Corrosion (E/C)'Inspection Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

PIPING/FITTING UT DATA SHEET Unit: 3 Building:

Aux. Bldg.Elevation:

Pipe Elev. 826'+0" Column: O-Qa / 91 System: LPSW Flow Regime: 4 Material C.S. UT Code #O.D. (nom) 14"x10" Tee Flow Diagram Schedule Std. Dwg.(s): Original Wall Thk. 0.375"/0.365" Min. Wall Thk. 0.328"(87.5%), 0.250"(66.7%)

0.319"(87.5%), 0.243"(66.7%)

C3LPS014 OFD- 124B-3.1 0-2439B 100 PSIG @ 1000 F Class F (OSC-533)3-14-05 (dcp CE01)Piping/ Fillng is upstream/

downstream of Valve 3LPSW-6 Previous inspection data: Remarks Piping Engineer:

40 Notes: Inspect 14"x10" reinforced fabricated tee Date: '0 Inspect per NDE-946.Grid per Procedure SM4O/B/8530/002 (this is 'Corrosion'

-NOT 'Erosion/Corrosion (E/C)'Inspection lInsulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

PIPING/FITTING UT DATA SHEET Unit: Building: Elevation:

Column: System: 3 Turbine Bldg.Pipe Elev. 851'+3 13/16" L / 55-56 LPSW Material CS UT Code #O.D. (nom) 4" Flow Diagram Schedule 40 Dwg.(s): Original Wall Thk. 0.237" Min. Wall Thk. 0.207-(87.5%), 0.158"(66.7%)

C3LPS019.OFD-124A-3.2 (C1I)0-2517E 100 PSIG @ 1000 F Class G Piping/ Fitting is upstream/

downstream of valve LPSW-842 Previous inspection data: Remarks Piping Engineer:

Inspect 4" pipe Notes: just downstream of 4"x2.5"reducer Date: Inspect per NDE-946.Grid per Procedure SMAO/BB85301002 (this is 'Corrosion'

-NOT "Erosion/Corrosion (EIC)'Inspection Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)PLANl e. 6TAkNI LIPPOP)X Off. R. 1W 1 14 4-1 -O PIPING/FITTING UT DATA SHEET Unit: Building: Elevation:

Column: System: 3 Material CS UT Code #Aux. Bldg 1st Floor O.D. (nom) 16" Flow Diagram Pipe Elev. 774'+2" Schedule Std. Dwg.(s): Original 0-Ga / 91-92 Wall Thk. 0.375" Min. Wall LPSW Thk. 0.328"(87.5%), 0.250"(66.7%)

C3LPS020 OFD-124B-3.

1 (H3)0-2436D & J 100 PSIG 0 100° F Class F (OS0-533)Piping/ Fitting is upstream downstream of Previous inspection data: .Piping Engineer:

Inspect 16" pipe Notes: just upstream of flow transmitter flow transmitter 3FT-77 Remarks Date: Inspect per NDE-946.Grid per Procedure SMWO/B/8530/002 (this is 'Corrosion'

-NOT 'Erosion/Corrosion (EIC)'Inspection Insulation Removed (initial & Date)Surface Prepped and Grid Painted (Initial & Date)

PIPING/FITTING UT DATA SHEET Unit 3 Building:

RB Ground Floor Elevation:

Pipe Elev. 814'+0" Column: See Attached dwg.System: LPSW Material CS O.D. (nom) 8"x1" Too Schedule Original Wall Thk.Min. Wall Thk.40 0.322"/0.133" 0.282-(87.5%), 0.21 0.116"(87.L%), 0.08 UT Code # C3LPS024 7 J Flow Diagram OFD-124B-3.2 (E7)Dwg.(s): 0-2479A & J 100 PSIG @ 193- F 5-(66.7%)

Class F (OSC-8490)

"6. 7).A)PiDlnqI Fitfing is upstreaml downstream of vt,#al , ... ..A .-Previous inspection data: M* e*1... , Piping Engineer Starting 3" upsftram c e l Notes: of valve 3LPSW-547, #*" 4t/, #r 7'Inspect 2 ft of 8w pipe using 1" grlds, 00'j& also Inspect 1 pipe out to valve 3LPSW-547 Inspect per NDE-946.Grid per Procedure fl 9 SMOA/B/8530/002 (this Is 'Corrosion' r-NOT 'Eroslon/Corrosion (EIC)'Inspection I Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date) q1 L~hAHAL 1-** k: :.",,;~::":

-2"SEAL LEAKAGE 3ING TEST:' / -STATION-I/ 27' -10'_TT_/4\:2Loj/

FILL!-i N N.N w N N N. SEAL 'i SING EL.a fpX I N N ul 4L\/I3LPSW-762 38B~k I/-3LPSW-5G6

.srj KD RAECTOR~TYP.) .ATYP)..-W'- 1)/2"YP 13'- 29/32" 0' /214 I FROM O-RIN SEALi C. C.-.iOR CONT. SE' .:. 59( 4)f EL.,e 80' -13 ?SA 0~-2479F (I'YP.) 2MG WALPO0I 3TE1301. 3HP 153~382 SE PAR IAL~. PLAN AL PLNWG.O-24S1 (G-4 t2'PRESSURIZER PRESSUýRIZER

'-38 PLN SEE N I wz2"WO 24"FOW I.V.EL. 802' -0" 2 5/16"

---7i7' -" -- --"FLOOR EL.79'-2 1/2" SPRA LINE E 813'-0"..& -9 0 f 13 i F2 l 1-PLATFO OR E EL L7'-O 'b A/..RESTRICjT I h Z: i "(..j-. S1EL. 806'-3" 1 ', 11 : CK. V. I"C. F. VENT 0) -i __- 18 L EL. S I I' -9" ORit: E .FL.O.O NC.,'EL--PLATFORM EL. B07'C 7 HATCH II LPEN.S, C 5 S EL. 805' -/'a...:'),-- .//-3-3CF- 151;1 l"IIL SU' r i2 , C. F. VENT EL. 823' -8" /51A 1) 2A'- I /.S 4"FILTERED WTR.EL.823'-4" , 4lO. wEL. 822'" S' .15, .4LPSW I SER.-,R EL In PIPING/FITTING UT DATA SHEET Unit: Building: Elevation:

Column: System: 3 Material CS UT Code #Auxiliary Building O.D. (nom) 8"xl" Tee Flow Diagram 789'-0 1/2' Schedule 40 Dwg.(s): Original Qa-89 Wall Thk. 0.332/0.133 Min. Wall LPSW Thk. 0.282"(87.5%), 0.215"(66.7%1)

.0.116" (87.5%), 0.089" (66.7%)C3LPS029 OFD-124B-3.1

[E-31 0-2437E [C-71 100 PSIG @ 100°F Class F OSC-533 Piping/ Fitting is upstream/

downstream of 3LP Previous inspection data: n/a Piping Engineer Geary L. Armentrout ext. 4322 Notes: Inspect 8xl " tee using 1 " x " grids.3LPSW- 109 W/2 8"-150*S.S R.F., W.N. FLGS.-3LPSW Inspect per NDE-946. 3LPSW SW-109; 1" Branch contains valve 3LPSW-719 Compoonet Cooler Section below Is Remarks looking South Date: 2/24/2007 Qa0 1-7 19(NSYI.j-7 17(FS-)(D- 13)0222(NSiL...-'

0223(FS)J-ý DET. B 3LPSTXI 3LPSTXI Grid per Procedure SM/O/B/8530/002 (this is 'Corrosion'-

NOT 'Erosion'Inspection

W-720ONS).

DET.B8 (0- 1';W-7 18(FS), DET. A 0- 1 Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

PIPING/FITTING UT DATA SHEET / 'Si-Unit: Building: 3 Material CS Turbine Building O.D. (nom) 30"x3" Tee ,/ & " sCa4, UT Code # C3LPS032 Flow Diagram OFD-124A-3.1

[G-31 Elevation:

778'-6" Column: System: K-46 LPSW Schedule Original Wall Thk.Min. Wall Thk.0.375/0.216l/ao2, 0.328" (87.5%), 0.250" (66.7M)Std. /40 Dwg.(s): 0-2407A 50 PSIG @ I00"F Class F OSC-2714 & OSC-1721 0.189" (87.5%), 0.144"(66.7%)

valve 3LPSW-128 Piping/ Fiffinct is upstream/

downstream of Previous inspection data: n/a Remarks ,f,- e16 --/z -67 Piping Engineer.

Geary L Armentrout ext. 4322 4 0-2407L -i Notes: r '& 3LPSFE 1014-tWOR DETAILS SEE Inspect 30-x3- tee 4& 44,Jý/ o-2429- 11 1)using 1"x 1" grids. -3LPSW-957-rt LPSW PUMP"3B'/FG" LPSW% T3L/2- 9L. 793"-8" 1 e~e~A dee-(301 4"U( 6)Inspect per NDE-946.Grid per Procedure SMIO/B/8530/O02 (this Is Corrosion'-

NOT 'Erosion'Inspection Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

DUKE POWER COMPANY Form 00184 (R4-88)Station _ _ _ _ _ Unit Rev..- FiIl Wo. Sheet Z-- 0f ._Subject rJOX^'C- / .~2_ _f --__P_, s_ ..0_ _ .. ... Date A1-/7-7 Prob No. Chocked By Date_r I 11_ __ _ __ _ _ _

PIPING/FITTING UT DATA SHEET Sheet 1 of 2 Unit: Building: Elevation:

Column: System: 3 Turbine Bldg 784'M46 LPSW Material CS 12"x8" O.D. (nom) Reducer Schedule 80 Original Wall Thk. 0.500" /Min. Wall Thk. 0.438" (87.5%).UT Code #Flow Diagram C3LPS033 OFD-124B-3.1 0-24001 Class F OSC-1357 Dwg.(s): 0.334" (66.7%)The Reducer is Downstream of Valve 3LPSW-356 Previous inspection data: Piping Engineer:

Geary Armentrout Notes: Start Grid at 1" Coupling using 3/4 "x3/4" Grids 1 4E expanding to 1"xl" Grids at the 12" end Use continuous scanning first4 rows (A-D) Y. 16"RX 10'Particularly around the coupling which was the location of a cavitation thru-wall hole L..Inspect per NDE-946 ;CH. L INE./2" 10" 1509 WNRF-JFLG.(TYP.OF 4: Grid per Procedure SM/O/B/8530/002 l 13LPSW-256 (this is 'Corrosion'-

NOT I 16"X 10" RED'Erosion/Corrosion (E/C)' Inspection Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)-/ 3 '-0 " I 5'- 2" EL. 774'-6" DISCH.FROM 3RIA-31 & 3RIA-35 PIPING/FITTING UT DATA SHEET Sheet 2 of 2.1300~ TpLD.H4JCRLG

---12"x 8" RED.DETAIL "H" (G-4)SCALE: NONE 31 PIPING/FITTING UT DATA SHEET Unit: Building: Elevation:

Column: System: 3 TB Basement Pipe Elev. 789+6" K-L / 46-47 LPSW Material CS O.D. (nom) 3" Schedule 40 Original Wall Thk. 0216" /Min. Wall Thk. 0.189" t87.5%)UT Code #Flow Diagram Dwg.(s): 0. 144" (66.7%)C3LPS044 OFO 124A-3.1 (G8)0-2407A 100 psig @ 100°F Class F(OSC-1721)

The Straight Pipe is Downstream of valve 3LPSW-129 Previous inspection data: Piping Engineer:

Geary L. Armentrout Date: 10/1/2009 Notes: Inspect 3" pipe upstream of valve 3LPSW-129

n. ...Inspect per NDE-946 SC,3 t-..Ps.04' Grid per Procedure SM/O/B/8530/oO0 (this Is 'Corrosion'-

NOT'ErosIon/Corrosion (E/C)' Inspection

-6"LPSW'S EL.792*-B -L-Y--.1 UPPLY TO "I IPLMP PACKING ~l ISEE PART.PLAN.-Il 0-2407K(H-6)

14" leo-Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

PIPING/FITTING UT DATA SHEET Unit: Building: Elevation:

Column: System: 3 Rx Bldg 833t6" West of RBCUs LPSW Material Schedule Original Wall Thk.Min. Wall Thk.Carbon Steel 4-40 0.237" /0.207" (87.5%).UT Code #Flow Diagram Dwg.(s): 0.158" (66.7%)C3LPS046 0FD1'.3A 0-2480A and C 100- / 100 psig Class F (OSC 1127-02)1 I"° 1 -The pipe is upstream of valve 3LPSW-563 Previous inspection data: none Piping Engineer.

Geary L Armentrout Date: 11/612010 Notes: Survey all 4" pipe between valve & tee Including the 4" side of the iO"x 4" tee (about a total length of 1 foot)SEE ATTACHED SKETECH Inspect per NDE-946 Grid per Procedure SMVO/B/8530/002 (this Is 'Corrosion'-

NOT"Erosion/Corrosion (EIC)' Inspection Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

SCALE: 3,8" =1'-0" 28'-01 IS ELLS.S8' LPSW SUPPLY TO AUX.FAN COOLING COILS EL. 833'-3!-6' X 4' RED. TEE 4" G.V. 3LPSW-563-

-4" 3LPSW- 12 12'4 5'-O 7/84-SEE DETAIL" 0" 0-2480A (D- 11)CLQ' LPSW DISCHARGE FROM AUX.FAN COOLING COILS EL. 832'-3-L/41' G.V.3L PSW-11 6s X G X 4"-4 G.V.3LPSW-9-SEE DETAIL" 0" 0-2480A (D-tI)qREACTOR BLD 01'2 TOP OF GRATING EL. 825'-0*q-. 4 " 3LPSW-696 SEE NOTE 2_1 i I. c- 8'I.9'-9" 7 1/2".qmrTIlNI 1)H-I-I" 0-2480A PIPING/FITTING UT DATA SHEET Unit: Building: Elevation:

Column: System: 3 Turbine Bldg.775+9 H55 LPSW Material Schedule Original Wall Thk.Min. Wall Thk.Carbon Steel 2'80 0.218" /0.191" (87.5%).UT Code #Flow Diagram Dwg.(s): 0.145" (66.7%)C3LPS047 OFD-124A-3.2 0-240OG 100*/loopsig Class G The pipe is upstream of valve 3LPSW-437 Previous inspection data: none Piping Engineer Geary L Armentrout Notes: 1 It 2,-, .. .u Date: 1/5/2011 8"-3" 21-W, " V .4"-3'/Grid per Procedure SM/O/B185301002 (this is 'Corrosion'-

NOT'Erosion/Corrosion (E/C)' Inspection

__FL.. EL. 775'-0"k'2" FIELD ROUTED FROM MOISTUI.-240 7,DTI I-"SEPARATOR DRAIN PUMPS. SEE 0WET TAP" Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

PIPING/FITTING UT DATA SHEET Unit: Building: Elevation:

Column: System: 3 Aux. Bldg. Ist Fir.Pipe Elev. 778+6" P-Q /83 HPSW Material CS UT Code #O.D. (nom) 4" Pipe Flow Diagram Schedule 40 Dwg.(s): Original Wall Thk. 0.237" Min. Wall Thk. 0.207"(87.5%), 0.158"(66.7%)

C3HPSO02 OFD-124C-3.3 (E3)0-1436D 150 PSIG @ 100- F Class G Piping/ Fitting is upstream/

downstream of Previous inspection data: Piping Engineer:

Inspect horizontal Notes: piping just below (south)of valve 3HPSW-112 valve 3HPSW-112 Remarks Date: 4-LETOOWN STG.TK.RELIEF LINE TO R.C.B.HOLOUP TK.-2A" EL 778'-6" CONT.ON OWG.10-1436A IR.C.B.HOLDUP TK.IN 0WO*O-I435A I -Il"-14444--+ N rIR R.C.SAMPLE K C 4PSGW- 112, 3 , Y1 4If4HPSW (FIRE PROT.)EL 778'-6" Alý16 NOIE b FOR NO.Inspect per NDE-946.Grid per Procedure SM/O/B/8530/002 (this is 'Corrosion'

-NOT 'Erosion/Corrosion (EIC)'Inspection 3- OISCH. FROM RECYCLE MONITE INTERIM CONDENSATE MONITOR TKS I AND 2 R.C.BLEEO HOLD UP TKS.-3O0SCH.TO WASTE MONITOR TANKS FRO L.A.W.T.CONO.

TEST TANK PUMP AND L.&I Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

PIPING/FITTING UT DATA SHEET Unit: Building: Elevation:

Column: System: 3 Material CS UT Code #Aux. Bldg. 2nd Fir. , 0.D. (nom) 4' Pipe Flow Diagram Pipe Elev. 792'+9" Schedule 40 Dwg.(s): Original P-Q /82 Wall Thk. 0.237" Min. Wall HPSW Thk. 0.207-(87.5%), 0.158"(66.7%)

C3HPSO03 OFD-124C-3.3 (Z3)0-1437A 150 PSIG @ 100- F Class G Pipinu/ Fitting is upstream/

downstream of Previous inspection data: Piping Engineer:

Inspect piping Notes: Just downstream of valve 3HPSW-202 valve 3HPSWo202 Remarks Date: Inspect per NDE-946.Grid per Procedure SM/O/B/85301002 (this Is 'Corrosion'

-NOT 'Erosion/Corrosion (E/C)'Inspection Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)

Unit: Building: Elevation:

Column: System: PIPING/FITTING UT DATA SHEET 3 Material CS UT Code #Intake Structure O.D. (nom) 4" pipe Flow Diagram 807'-10" Schedule 40 Dwg.(s): Original See Notes & Sketch Wall Thk. 0.237" Min. Wall HPSW Thk. 0.207"(87.5%), 0.158"(66.7%)

C3HPSO04 0F0-124C-3.6 (1-4)0-423E 150 PSIG @ 100°F Class G Ploin Fitting is upstream/

downstream of Previous inspection data: n/a Piping Engineer:

Geary L. Armentrout ext. 4322 Notes: Inspect 4 " HPS W pip. In the trench on the side of the Intake Structure.

Location to be centered between CCW Pumps 3'A'and 3'B'using 1" x 1" grids.See Notes and Sketch Remarks Date: 2*24/2007 See Notes and Sketch Remarks I I I I.1 I I I I I I I , ,/-"- PUMP 3B I El l l i Inspect per NDE-946.Grid per Procedure SIWO/B/8530/02 (this is 'Corrosion'-

NOT 'Erosion'Inspection ZDj I%I-.W L--.i I I I" O--- ----SEE DET."K" (B- 13)I.FOR COOLING WATER SUPPLY TO UNIT 3 CCW PUMPS, SEE 0-423E-9 & 0-423E- 10 I/-q PUMP 3A Insulation Removed (Initial & Date)Surface Prepped and Grid Painted (Initial & Date)-l SEE ENLARGED PLAN "A" (H-G)