| | issue date = 06/25/2012 | | | issue date = 06/25/2012 |
| | title = Units 1 & 2 and ISFSI and R. E. Ginna, and ISFSI - Notice of Completion of Issuance of Minority Shareholding Interest in Edf Inc. to Edf Trading Limited | | | title = Units 1 & 2 and ISFSI and R. E. Ginna, and ISFSI - Notice of Completion of Issuance of Minority Shareholding Interest in Edf Inc. to Edf Trading Limited |
| | author name = Perkins E P | | | author name = Perkins E |
| | author affiliation = Constellation Energy Nuclear Group, LLC, EDF Group | | | author affiliation = Constellation Energy Nuclear Group, LLC, EDF Group |
| | addressee name = | | | addressee name = |
Line 21: |
Line 21: |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Document Control Desk Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 Docket Nos. 50-317 and 50-318 Calvert Cliffs Independent Spent Fuel Storage Installation Docket No. 72-8 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 Docket Nos. 50-220 and 50-410 RIE. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR- 18 Docket No. 50-244 RIE. Ginna Independent Spent Fuel Storage Installation Docket No. 72-67 Notice of Completion of Issuance of Minority Shareholding Interest in EDF Inc.to EDF Trading Limited (a) Letter from B. S. Montgomery (CENG) to Document Control Desk (NRC), dated October 5, 2011, Notice Regarding Issuance of Minority Shareholding Interest in EDF Inc. to EDF Trading Limited -ML1 1285A036 (b) Letter from D. V. Pickett (NRC) to B. S. Montgomery (CENG), dated January 10, 2012, Threshold Determination Regarding the Proposed Corporate Restructuring Involving EDF Inc. -Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2, Calvert Cliffs Independent Spent Fuel Storage Installation (ISFSI); Nine Mile Point Nuclear Station, Unit Nos. I and 2; R.E. Ginna Nuclear Power Plant, and R.E. Ginna ISFSI (TAC Nos. ME7608, ME7609, ME7610, ME7611, and ME7612) -ML113500389 | | Document Control Desk Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 Docket Nos. 50-317 and 50-318 Calvert Cliffs Independent Spent Fuel Storage Installation Docket No. 72-8 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 Docket Nos. 50-220 and 50-410 RIE. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR- 18 Docket No. 50-244 RIE. Ginna Independent Spent Fuel Storage Installation Docket No. 72-67 Notice of Completion of Issuance of Minority Shareholding Interest in EDF Inc.to EDF Trading Limited (a) Letter from B. S. Montgomery (CENG) to Document Control Desk (NRC), dated October 5, 2011, Notice Regarding Issuance of Minority Shareholding Interest in EDF Inc. to EDF Trading Limited -ML11285A036 (b) Letter from D. V. Pickett (NRC) to B. S. Montgomery (CENG), dated January 10, 2012, Threshold Determination Regarding the Proposed Corporate Restructuring Involving EDF Inc. -Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2, Calvert Cliffs Independent Spent Fuel Storage Installation (ISFSI); Nine Mile Point Nuclear Station, Unit Nos. I and 2; R.E. Ginna Nuclear Power Plant, and R.E. Ginna ISFSI (TAC Nos. ME7608, ME7609, ME7610, ME7611, and ME7612) -ML113500389 |
|
| |
|
| ==REFERENCES:== | | ==REFERENCES:== |
|
| |
|
| RS&COP Document Control Desk June 25, 2012 Page 2 Reference (a) notified the Nuclear Regulatory Commission (NRC) of a corporate restructuring involving EDF Inc. (formerly EDF Development Inc.). Reference (b) is notification that the NRC staff completed its review of Reference (a).This letter is to notify the NRC that the corporate restructuring actions discussed in Reference (a) were completed on June 1, 2012. The current allocation of the ownership of EDF Inc. is 82.5% by EDF International SAS and 17.5% by EDF Trading Limited.If there are any questions concerning this letter, please contact me at everett.perkins(acengllc.com or 410-470-3928.Sincerely, Everett P. Perkins, Jr Director -Licensing EPP/EMT/bjd cc: B. K. Vaidya, NRC Resident Inspector, Calvert Cliffs M. C. Thadani, NRC Resident Inspector, Ginna N. S. Morgan, NRC Resident Inspector, Nine Mile Point W. M. Dean, NRC S. Gray, DNR}} | | RS&COP Document Control Desk June 25, 2012 Page 2 Reference (a) notified the Nuclear Regulatory Commission (NRC) of a corporate restructuring involving EDF Inc. (formerly EDF Development Inc.). Reference (b) is notification that the NRC staff completed its review of Reference (a).This letter is to notify the NRC that the corporate restructuring actions discussed in Reference (a) were completed on June 1, 2012. The current allocation of the ownership of EDF Inc. is 82.5% by EDF International SAS and 17.5% by EDF Trading Limited.If there are any questions concerning this letter, please contact me at everett.perkins(acengllc.com or 410-470-3928.Sincerely, Everett P. Perkins, Jr Director -Licensing EPP/EMT/bjd cc: B. K. Vaidya, NRC Resident Inspector, Calvert Cliffs M. C. Thadani, NRC Resident Inspector, Ginna N. S. Morgan, NRC Resident Inspector, Nine Mile Point W. M. Dean, NRC S. Gray, DNR}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML11138A1592011-05-12012 May 2011 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2, R.E. Ginna, Application for Approval of Indirect Transfer of Control of Licenses Project stage: Request ML11285A0362011-10-0505 October 2011 Independent, Nine Mile, Units 1 & 2, R.E. Ginna, R.E. Ginna Independent Spent Fuel Storage Installation - Notice Regarding Issuance of Minority Shareholding Interest in Edf Inc. to Edf Trading Limited Project stage: Request ML1135004022011-12-28028 December 2011 Request for Withholding Information Form Public Disclosure for Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2, Calvet Cliffs Independent Spent Fuel Storage Installation (Isfsi), Nine Mile Point Nuclear Station, Unit Nos. 1 & 2. Project stage: Withholding Request Acceptance ML1135003892012-01-10010 January 2012 Threshold Determination Regarding the Proposed Corporate Restructuring Involving Edf Inc. - Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Calvert Cliffs Independent Spent Fuel Storage Installation (Isfsi); Nine Mile Point Nuclear S Project stage: Other ML12184A0492012-06-25025 June 2012 Units 1 & 2 and ISFSI and R. E. Ginna, and ISFSI - Notice of Completion of Issuance of Minority Shareholding Interest in Edf Inc. to Edf Trading Limited Project stage: Other 2011-05-12
[Table View] |
Units 1 & 2 and ISFSI and R. E. Ginna, and ISFSI - Notice of Completion of Issuance of Minority Shareholding Interest in Edf Inc. to Edf Trading LimitedML12184A049 |
Person / Time |
---|
Site: |
Calvert Cliffs, Nine Mile Point, Ginna |
---|
Issue date: |
06/25/2012 |
---|
From: |
Perkins E Constellation Energy Nuclear Group, EDF Group |
---|
To: |
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
---|
References |
---|
TAC ME7608, TAC ME7609, TAC ME7610, TAC ME7611, TAC ME7612 |
Download: ML12184A049 (2) |
|
|
---|
Category:Letter
MONTHYEARIR 05000244/20244012024-11-20020 November 2024 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2024401 IR 05000220/20244022024-11-20020 November 2024 Material Control and Accounting Program Inspection Report 05000220/2024402 and 05000410/2024402 (Cover Letter Only) IR 05000410/20240032024-11-0808 November 2024 Integrated Inspection Report 05000220/1014003 and 05000410/2024003 IR 05000244/20240032024-11-0808 November 2024 Integrated Inspection Report 05000244/2024003 IR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 IR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 ML24234A0922024-08-21021 August 2024 Requalification Program Inspection NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24213A1412024-07-31031 July 2024 Requalification Program Inspection IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 2024-09-06
[Table view] |
Text
Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 200C Baltimore, MD 21202 CENG.a joint venture of oc°° %Erew ,1,0%June 25, 2012 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:
SUBJECT:
Document Control Desk Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 Docket Nos. 50-317 and 50-318 Calvert Cliffs Independent Spent Fuel Storage Installation Docket No. 72-8 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 Docket Nos. 50-220 and 50-410 RIE. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR- 18 Docket No. 50-244 RIE. Ginna Independent Spent Fuel Storage Installation Docket No. 72-67 Notice of Completion of Issuance of Minority Shareholding Interest in EDF Inc.to EDF Trading Limited (a) Letter from B. S. Montgomery (CENG) to Document Control Desk (NRC), dated October 5, 2011, Notice Regarding Issuance of Minority Shareholding Interest in EDF Inc. to EDF Trading Limited -ML11285A036 (b) Letter from D. V. Pickett (NRC) to B. S. Montgomery (CENG), dated January 10, 2012, Threshold Determination Regarding the Proposed Corporate Restructuring Involving EDF Inc. -Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2, Calvert Cliffs Independent Spent Fuel Storage Installation (ISFSI); Nine Mile Point Nuclear Station, Unit Nos. I and 2; R.E. Ginna Nuclear Power Plant, and R.E. Ginna ISFSI (TAC Nos. ME7608, ME7609, ME7610, ME7611, and ME7612) -ML113500389
REFERENCES:
RS&COP Document Control Desk June 25, 2012 Page 2 Reference (a) notified the Nuclear Regulatory Commission (NRC) of a corporate restructuring involving EDF Inc. (formerly EDF Development Inc.). Reference (b) is notification that the NRC staff completed its review of Reference (a).This letter is to notify the NRC that the corporate restructuring actions discussed in Reference (a) were completed on June 1, 2012. The current allocation of the ownership of EDF Inc. is 82.5% by EDF International SAS and 17.5% by EDF Trading Limited.If there are any questions concerning this letter, please contact me at everett.perkins(acengllc.com or 410-470-3928.Sincerely, Everett P. Perkins, Jr Director -Licensing EPP/EMT/bjd cc: B. K. Vaidya, NRC Resident Inspector, Calvert Cliffs M. C. Thadani, NRC Resident Inspector, Ginna N. S. Morgan, NRC Resident Inspector, Nine Mile Point W. M. Dean, NRC S. Gray, DNR