ML14080A135: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/05/2014
| issue date = 03/05/2014
| title = Worcester Polytechnic Institute Reactor, USNRC License R-61, Docket 50-134; Request for Termination of NRC License
| title = Worcester Polytechnic Institute Reactor, USNRC License R-61, Docket 50-134; Request for Termination of NRC License
| author name = Curley M J
| author name = Curley M
| author affiliation = Worcester Polytechnic Institute
| author affiliation = Worcester Polytechnic Institute
| addressee name =  
| addressee name =  

Revision as of 15:55, 21 June 2019

Worcester Polytechnic Institute Reactor, USNRC License R-61, Docket 50-134; Request for Termination of NRC License
ML14080A135
Person / Time
Site: 05000134
Issue date: 03/05/2014
From: Curley M
Worcester Polytechnic Institute
To:
Document Control Desk, NRC/FSME
References
W19-1579-003, Rev. 1
Download: ML14080A135 (2)


Text

WORCESTER POLYTECHNIC INSTITUITE FINANCIAL SERVICES March 5, 2014 Attn: Document Control Desk Mail Stop 0-5 C12 Washington, DC 20555-0001 Re: Worcester Polytechnic Institute Reactor, USNRC license R-61, Docket 50-134;Request. for Termination of NRC license

Dear Sir:

The decommissioning activities described in the Decommissioning Plan for the Leslie C. Wilbur Nuclear Reactor Facility at the Worcester Polytechnic Institute, Document W19-1579-003, Revision 1, September 2009, have been completed.

The objective of that plan was to remove radiological materials and equipment associated with WPI's licensed operations, such that radiological conditions satisfy NRC criteria for unrestricted use of the facility and thus permits termination of the NRC license. A Final Status Survey (FSS) was performed for the reactor facility, in accordance with WPI's NRC approved FSS Plan. The results of the FSS demonstrate that the criteria set forth in WPI's DP have been satisfied.

The report documenting the results of the FSS is enclosed.

As such, WPI hereby requests termination of its USNRC License R-61.The results of the FSS indicate that the facility meets the criteria for termination of the R-61 license, as established in WPI's decommissioning plan (DP). All individual radiological measurement determinations made throughout the facility for surface contamination (both total and removable) were found to be less than the criteria established in the DP. Likewise, sample results for concrete, metallic liners, soil and sediment were found to be less than the volumetric radionuclide concentration criteria established in the DP. Additionally, all resulting radioactive wastes have been removed from the facility, with documentation regarding its removal and disposition provided in the enclosed FSS Report. As such, the WPI reactor facility (License R-61, Docket 50-134) meets the criteria established in its DP for termination of the NRC license.5o8-831-5754 (TEL) 508-831-5064 (FAX)100 INSTrTUTE ROAD, WORCESTER MA 0i609-2280 USA If you have any technical questions or comments regarding the FSS Report, please contact Jay Adler at TLG Services, Inc., at 860-355-2300 or (adler@tlgservices.com).

I certify under penalty of perjury that the foregoing is true and correct to the best of our knowledge.

Executed on March 5, 2014., Sincerely,J. Reactor Direct University Compliance Officer Finance and Operations