IR 05000285/2015404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/22/2015
| issue date = 10/22/2015
| title = Fort Calhoun Station - NRC Security Baseline Inspection Report 05000285/2015404
| title = Fort Calhoun Station - NRC Security Baseline Inspection Report 05000285/2015404
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Cortopassi L
| addressee name = Cortopassi L
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:" " October 22, 2015  
{{#Wiki_filter:October 22, 2015


Lou Cortopassi, Vice President
==SUBJECT:==
 
FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2015404
and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550
 
Fort Calhoun, NE 68023-0550
 
SUBJECT: FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2015404


==Dear Mr. Cortopassi:==
==Dear Mr. Cortopassi:==

Revision as of 17:05, 20 June 2019

Fort Calhoun Station - NRC Security Baseline Inspection Report 05000285/2015404
ML15295A137
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/22/2015
From: Mark Haire
Plant Support Branch-1
To: Cortopassi L
Omaha Public Power District
References
IR 2015404
Download: ML15295A137 (4)


Text

October 22, 2015

SUBJECT:

FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2015404

Dear Mr. Cortopassi:

On September 24, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Fort Calhoun Station. The NRC inspectors discussed the results of this inspection with Mr. E. Dean, Plant Manager, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.

The NRC inspectors did not identify any findings or violations of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withhol ding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for

your response.

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 50-285 License No. DPR-40

Nonpublic Enclosure: Inspection Report 05000285/2015404 w/Attachment: Supplemental Information

cc w/enclosure:

Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District

Fort Calhoun Station

Mail Stop FC-2-1

9610 Power Lane Blair, NE 68008

cc w/o encl: Electronic Distribution