ML17303A786: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 12/31/1987
| issue date = 12/31/1987
| title = Statistical Summary Rept of Personnel Monitoring 1987. W/880226 Ltr
| title = Statistical Summary Rept of Personnel Monitoring 1987. W/880226 Ltr
| author name = VAN BRUNT E E
| author name = Van Brunt E
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  

Revision as of 19:53, 18 June 2019

Statistical Summary Rept of Personnel Monitoring 1987. W/880226 Ltr
ML17303A786
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/31/1987
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Office of Nuclear Reactor Regulation
References
161-00829-EEVB, 161-829-EEVB, NUDOCS 8803030229
Download: ML17303A786 (6)


Text

~~PCCELEMTZD DISCI'RIBUTJON

'MONSTRATION SYSTEM REGULATORY INFORMATION D STRIBUTION SYSTEM (RIDS)ACCESSION NBR:8803030229 DOC.DATE: 8//12/'3 NOTARIZED:

NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION VA BRUNT,E.E.

Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

"Statistical Summary Rept of Personnel Monitoring 1987." W/880226 ltr.DISTRIBUTION CODE: IE56D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Annual Radiation Exposure Report By Functions Per Tech Spec NOTES:Standardized plant.Standardized plant.Standardized plant.)05000528 g 05000529 05000530 RECIPIENT ID CODE/NAME PD5 LA LICITRA,E INTERNAL: ACRS 11 AEOD/DS P/TPAB NRR/DOEA/EAB11E NRR/PMAS/ILRB12 RES BROOKS,B EXTERNAL: LPDR NSIC NOTES: COPIES LTTR ENCL 1 0 1 0 10 10 1 1 1 1 1 1 2 2 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M AEOD/DOA NMSS/IQSB 6H3 RR/DRE~PB10A

-=LP 02 RGN5 01 NRC PDR COPIES LTTR ENCL 5 5 1 0 1 1 1 1 2 2 1 1 1 1 1 1 S j A TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 30

~'RIZONA NULCEAR POWER PROJECT Palo Verde Nuclear Generating Station STATISTICAL

SUMMARY

REPORT of PERSONNEL MONITORING as specified by 10CFR20.407 Paragraph (a)(2)1987 ESTIMATED WHOLE BODY EXPOSURE RANGE (Rems)NUMBER OF INDIVIDUALS IN EACH CATEGORY No measurable exposure Less than O.l 0.1 to 0.25 0.25 to 0.50 0.50 to 0.75 0.75 to 1.0 1 to 2 2 to 3 3 to 4 4to5 5 to 6 6 to 7 7 to 8 8 to 9 9 to 10 10 to ll 11 to 12 2587 (*)794 (**)363 227 140 72 133 48 15 12+Total number of personnel for whom monitoring was provided (*)Includes 108 visitors (**)Includes 3 visitors Reviewed By/Date 4379 8803030229 87i23i PDP.ADOCK 05000528 s.c5 STAT ION cRea 1987 MRC 1.rt UT I LIT Y CRAB CONT RAO'ION N sRca TOTALS N aR eel OPERATIONS/SURVEILLANCE Hafntenance Personnel Operat lone Personnel Health Physics Personnel Supervisory Personnel Engfneer fns Pcrsorr>>I 178 208 68 22 13,239 24,958 17,886 125 2,416 280 205 0 0 45 203 8,964 91 7,66$170 25,2$6 7 1,1C?10 35$385 22,483 302 32,828 238 43,1C2 10 1,272 34 2,816 SUSTOTALS 4?9 58,624 9 530 481 C3,387 969 102,5CI ROUTINE MAINTENANCE Hafntenance Personnel Operatfcns Pcrsorv>>I Health Physfcs Personnel Supcrvfsory Personnel Engfncerfns Pcrsonr>>l 197 60 33 14 22,508 1,972 1,558 35 809 6 337 2 134 0 0 0 0 0 0 C33 90,865 Cb 2,2Cb 110 6,360 7 168 10 1,316 636 11$,710 10&4,352 IC3 7,918 8 203~24 2,125 SUSTOTALS 30$26,882 8 471 606 100,955 919 128,308 IN SERVICE INSPECTION Hafntenance Personnel Operations Personnel Health Physfss Personnel Supervfsory Personnel Ensfneerlns Personnel 115 2C 29 I 9 16,993 1,5?7 3, 179 271 2,583 4 239 0 0 0 0 0 0 I 70 253 72,?35 34 9,060 d9 11,38$2 110 4 628 3?2 89,967 58 10,637 118 1C,562 3 381 1C 3,281 SUBTOTALS 178 24,603 5 309 382 93,916 56$118,828 SPECIAL MAINTENANCE Hafntenance Personnel Operations Personne'I Health Phyafea PerSOnne'I Supervisory Personnel EnSlnecrfnS Personnel 138 42 28 2 9 73,?85 2,690 3,722 20 1,534 6 2,SIC 2 535 0 0 0 0 0 0 333 61 103 5 14 131, 345 C, 607 16,997 1,'372 1,577 477 105 131 7 23 207,944 7,832 20,7'lp 1,392 3,111 SU&TOTALS 219 81,?$1 d 3,349 516 155, 898 74$240,99&RADVASIE PROCESSING Hafntenanoe Pcrsonr>>I Operatfcns Personnel Health Physics Personnel Supervisory Personnel Enslneerlns Personnel I 89 56 26 0*2 7,518 14,996 1, 216 0 32 3 350 0 0 0 0 0 0 0 0 104 5,2?C 103 19,852 59 5,061 0 0 I 5 196 13, 142 159 3C,&48 85 6,277 0 0 3 37 SUBTOTALS I 173 23,762 3$0 267 30,192 CC3 5C,304 RKTUKLIMS Hafntenanse Personnel Operat Iona Personnel Health Phys Isa Personnel Supervisory Personnel Enoineerfn9 Personnel 72 24 C 0 5 13,017 800 1CO 0 1,104 115 30 0 0 0 87 9,594 2d C,302 38 5,409 1 30 8 216 162 22, 726 53 5, 132 42 5,549 1 30 11 1,320 SUSTOTALS SIATIOM TOTALS 103 15,061 C 145 269 34,7$7 Hafntenanoe Personnel Operations Personnel Health Physics Personnel Sqxrvlsory Personnel Engfnecrfnd Personnel 265 269 73 3 Cb 147,060 46,993 27,70'I C51 8, C?8 8 4,135 C'0C 0 0 0 0 5 115 685 207 188 12 35 318,777 47,732 70,466 2,827 C,097 958 480 261 15 86 C69,972 95,629 98,167 3,278 12,690 PVMfiS STATION IOTALS 656 230,683 17 5,154 1127 44'5,899 1800 6?9,736 1987 SPECIAL MAINTENANCE PVNGS had four (4)jobs classified as Special Maintenance in 1987.All four (4)were in Unit I and cost 247.912 Man-Rem.In late January, Unit I developed a primary to secondary tube leak in Steam Generator I.The outage for identification and repair lasted 47 days and cost 97.412 Man-Rem.In July, the Low Pressure Safety In)ection Pump A&B seals were replaced, along with the LPSI B motor.This required 23 days and 46.959 Man-Rem.During the Refueling Outage, starting in September, an Antimony removal process to remove antimony from the RCS coolant and piping was performed.

The work took 2.5 days and 3.183 Man-Rem.Defects in the RCP shafts were discovered during the outage, leading to the disassembly of the pumps and replacement of all 4 shafts.Actual work covered 70 days and expended 100.360 Man-Rem.

Arizona Nuclear Power Project P.O.BOX 52034~PHOENIX, ARIZONA 85072-2034 161-00829-EEVB/PGN February 26, 1988 Docket Nos.STN 50-528/529/530 Director of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2 and 3 Personnel Monitoring Report for 1987 File: 88-019-026 Pursuant to 10CFR20.407(a)(2) and as supplemented by PVNGS Technical Specification 6.9.1.5, attached please find the Personnel Monitoring Report for 1987.If you have any questions, please call Mr.A.C.Rogers at (602)371-4041.Very truly yours EEVB/PGN/cal Attachments E.E.Van Brunt, Jr.Executive Vice President Prospect Director cc: 0.M.De Michele G.W.Knighton J.B.Martin T.J.Polich (all w/o)