ML17348A757: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 11/27/1990 | | issue date = 11/27/1990 | ||
| title = NPDES Noncompliance Notification:On 900906,discovered That Rainwater Pumped from Sump to Biscayne Bay.No Sheen or Other Adverse Environ Impacts Observed | | title = NPDES Noncompliance Notification:On 900906,discovered That Rainwater Pumped from Sump to Biscayne Bay.No Sheen or Other Adverse Environ Impacts Observed | ||
| author name = | | author name = Plunkett T | ||
| author affiliation = FLORIDA POWER & LIGHT CO. | | author affiliation = FLORIDA POWER & LIGHT CO. | ||
| addressee name = | | addressee name = |
Revision as of 09:26, 18 June 2019
ML17348A757 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 11/27/1990 |
From: | Plunkett T FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
L-90-391, NUDOCS 9012030042 | |
Download: ML17348A757 (6) | |
Text
REGULATORY XNFORMATXON DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9012030042 DOC.DATE: 90/11/27 NOTARIZED:
NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILXATION PLUNKETT,T.F.
Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
NPDES noncompliance notification:on 900906,discovered that rainwater pumped from sump to Biscayne Bay.DISTRIBUTION CODE: IE23D COPIES RECEIVED:LTR Q ENCL J SIZE: TXTLE: Environmental Event Report (per Tech Specs)NOTES: DOCKET g 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G COPIES LTTR ENCL 3 3 1 1 RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 1 1 INTERNAL: AEOD/DSP/TPAB NRR/DREP/PEPB9D OGC/HDS2 RGN2 EXTERNAL NRC PDR 1 1 AEOD/PTB 1 1 RR ILRB12 1 1 REG FILE 01 1 1 2/DRSS/EPRPB 1 1 NSIC 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASfE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15
.I t t~4 P.O.Box14000, Juno Beach, Ft.33408-0420 PIPll NOY 27$990 L-90-391 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
Re: Turkey Point Unit 3&4 Dockets No.50-250 and 50-251 Enviromental Protection Plan Report-National Pollutant Discharge Elimination S stem NPDES Re ortable Event In accordance with Section 3.2.1.of the Turkey Point Units 3 and 4 Enviromental Protection Plan (Appendix B of Plant Licenses), attached is a copy of the Discharge Monitoring Report (DMR)required by the Turkey Point Plant NPDES Permit with respect to a reportable event (attachment 1).Additionally, a description of the event is enclosed (attachment 2).Should you have any questions, please contact us.Very truly yours, T.F.Plunkett Vice President Turkey Point Nuclear TFP/DPS/ds enclosure cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC, Senior Resident Inspector, USNRC, Turkey Point Plant 9012030042 9oil27 PDR ADOCK 05000250 s PDC/z an FPL Group company~L
~,'I'I ATTACHMENT 2 TO LETTER L-90-391 The Turkey Point Fossil Power Plant is currently in the process of regrading the fuel oil storage tank area to direct rainwater runoff toward a sump with an emergency overflow to the cooling canal system.This project has been permitted by Dade County's Department of Environmental Resources Management (DERM)and is being constructed by a local contractor.
On September 6, 1990, the contractor was discovered pumping rainwater from the sump to the turning basin which is in Biscayne Bay.Plant personnel directed the contractor to cease pumping water immediately.
After further investigation, FPL was informed that a six inch pump was used to pump the rainwater at a rate of approximately 1100 gallons per minute for 15 minutes.Thus a total of 16,500 gallons of rainwater was pumped to the turning basin.No sheen or any other adverse environmental impacts were observed.The contractor has been advised that all dewatering activities require proper permitting and that discharges without proper permits to waters of the United States are not allowed at Turkey Point.The general specification for contractors and the FPL General Terms and Conditions, parts 13 and 16 require contractors to obtain their own permits and to abide by state and Federal requirements.
PERMITTEE NAME(AODAESS(l>55(i>dr)ori(i(y)re>>irlL((re(ion I((tiy)rrred NAME I I i'vi;;.t.I T-l I.IRKF Y I (I I NT..rIV I"IIN.I(.NT AL AFFAIRS Dl I'PO"IIX 1<000 JI.IN!l ILEA'FL 33(e08 FAcluTY F L PI((R 6 LT-TUP.KF Y PO I NT ATTN-IRON,-MGo iooaoooHIAMI M.>LP~(>L FL 33101 IIATION*L POLLUTANT O5SCMARGE ELIMINATION SYSTF M (NPDES J DISCHARGE MONITORING REPORT(DMR)
(3-td)(l7-)9J FL0001,)62 001 1 PEAMIT HUMSEA OISCHAAOE NUM SBl MONITORING PERIOD Y R MO DAY Y MO D Y FROM TO (3p.33)(33-33)(3d-zs)(3d-37)(23-39)(Set)F-FINAL CLOSED CYCLE COOLING CANAl SYST'I MAJOR (SUBR HP)NOTE: Read lnatfuctlons before cofnpletlng this foftn.PAIIAMETKR P?47)AVERAGE MAXIMUM (3 Cunt Only)OUANTITYOR LOADING (dd S3)($461 J UNITS (d Cunt Only)(344SJ MINIMUM AVERAGE MAXIMUM OUAuTYOR CONCENTRATION (ddhf3)(SAflJ UNITS NO.EX d343 FREQUENCY OF ANALYSIS (6AS)SAMPLE TYPE (d9 7g)FLOWe IN CONDUIT OR THOU TREATNIEAfT PLAN SOOSO I.O 0 EFFLfjEAlT 6kaSS'I('ALQ SAMPLE MEASUREMEHT PERMIT TREQUIREM SAMPLE MEASUREMENT
~>i o>;, A~Jl~~-'rv DAO='Y tMK-MGD A gA J4 rh)h PERM'I g!.'g~~'REQUIREME(ltc+g
.y,'AMPLE MEASUREMENT PERMIT.REQUIREMENT hi>SAMPLE MEASUREMENT
~h~trV(L~I 5:~, h>5(>~PBIMIT REQUIRELIEHT, SAMPLE MEASUREMKHT Ii PERMIT',REQUIREMENT' h SAMPLE MEASUAEMEHT I'>'i"~5 t)5~~i 3')~I>var)~L'QUIA SAMPLE MEASUREMENT or" W~h I;Qf;5, PERM REQUIR NAME/TITLE PRINCIPAL EXECUTIVE OFFICER M.H.Brunetti Executive Vice President TYPED OR PRINTED ro~IO v-'"f>.>~~I certify under penalty ol Iaw that this document arid all attachments were prepared under my direction or supeivWon In accordance with a syslem designed lo assure that qualitied personnel properly gather and evaluate the Information submitted.
Based on my Inquiry of the person Or persons who Illa nage the systelll.of Ihose persons directly responsible lor therlng the Inlonnadon.
the Information submitted h.to the best ot my~nd belief.true.accurate.and complete.I am aware that there are stgnt kant penaIIUes for submltdng false Informatkn, Including the poastbtltty of nne and Imprisonment for Iutowlng violations.
5~15,$IGNATUREOFP I CIPAL EXECUTIVE OFHCER OR AUTHORIZED AGENT TELEPHONE 305 246-617 HUM SEA~(OATS 90 10 Ol COMMENT AND EXPLANATION OF ANY VIOLATIONS(Rc(rrencrutturfuctr(rrenra frere)BIO'llC'IAI,"I-(ILL'II(JElt
~Il=DI SCHWA R" I: 3CCIJRSY REPORT FI.OH AND ATTACH lETTER OF EXPLANATION (INCLUOE LENGTH II.Till 9f il.l<4R" AN(i RFASAN F.OI'.TIIl.01!TCHAP(C)TN LIFU OF CONTINUOUS RFCOROINGe HOURLY FLOM MEASUREMENTS PA'Forfn 3320.(Rsv.MS)Prwlofts'all(Iona (nay ftsed.rO JLo h~2 I~+or AEP A WHIC YHOTSKUSE04 0101.9/900709-2027 I