L-MT-18-067, Thirty (30) Day Notification Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 10 CFR 72.210, for the Storage of Spent Fuel: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 11/09/2018
| issue date = 11/09/2018
| title = Thirty (30) Day Notification Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 10 CFR 72.210, for the Storage of Spent Fuel
| title = Thirty (30) Day Notification Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 10 CFR 72.210, for the Storage of Spent Fuel
| author name = Church C R
| author name = Church C
| author affiliation = Northern States Power Company, Minnesota, Xcel Energy Inc
| author affiliation = Northern States Power Company, Minnesota, Xcel Energy Inc
| addressee name =  
| addressee name =  

Revision as of 20:08, 12 June 2019

Thirty (30) Day Notification Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 10 CFR 72.210, for the Storage of Spent Fuel
ML18316A025
Person / Time
Site: Monticello, 07201004  Xcel Energy icon.png
Issue date: 11/09/2018
From: Church C
Northern States Power Company, Minnesota, Xcel Energy Inc
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
L-MT-18-067
Download: ML18316A025 (3)


Text

2807 West County Road 75 Monticello, MN 55362 800.895.4999 xcelenergy.com November 9, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 Independent Spent Fuel Storage Installation Docket No. 72-58 fl Xcel Energy* RESPONSIBLE BY NAT UR E L-MT-18-067 10 CFR 72.212(b)(2)

Thirty (30) Day Notification Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 10 CFR 72.210, for the Storage of Spent Fuel In accordance with 10 CFR 72.212(b)(2), Northern States Power Company-Minnesota (NSPM), doing business as Xcel Energy, Inc., is registering the use of two U. S. Nuclear Regulatory Commission (NRC) approved spent fuel storage casks at the Monticello Nuclear Generating Plant (MNGP) Independent Spent Fuel Storage Installation (ISFSI). Registration of a cask is required no later than 30 days after using that spent fuel storage cask to store spent fuel in accordance with 10 CFR 72.212(b)(2).

Cask-specific registration information is provided for each NUHOMS-61 BTH dry shielded canister (DSC) in Enclosure

1. If you have any questions or require additional information, please contact Mr. David A. Gerads, Regulatory Affairs Analyst, at (763) 295-1046.

Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.

hristopher . Church Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company -Minnesota Enclosure(1) cc: Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC Minnesota Department of Commerce ENCLOSURE 1 MONTICELLO NUCLEAR GENERATING PLANT

SUMMARY

OF REGISTRATION INFORMATION FOR THE DRY SHIELDED CANISTERS LOADED DURING THE 2018 LOADING CAMPAIGN 1 Page Follows L-MT-18-067 Enclosure 1 Page 1 of 1

SUMMARY

OF REGISTRATION INFORMATION FOR THE DRY SHIELDED CANISTERS LOADED DURING THE 2018 LOADING CAMPAIGN HSM Model HSM Date Placed Number Serial into Service Number Cask Certificate of No. 1004 Compliance:

Cask Amendment Amendment 13 Number: Rev. 1 DSC Model NUHOMS-61 BTH Number: DSC Serial MNP-61 BTH-1-C-2H-NUHOMS HSM-HSM-10/18/2018 Number: 025 H 15B MNP-61 BTH-1-C-2H-NUHOMS HSM-HSM-10/29/2018 026 H 11A