LR-N19-0042, 2018 Annual Radioactive Effluent Release Report (ARERR): Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/25/2019
| issue date = 04/25/2019
| title = 2018 Annual Radioactive Effluent Release Report (ARERR)
| title = 2018 Annual Radioactive Effluent Release Report (ARERR)
| author name = Casulli E T, Martino P A
| author name = Casulli E, Martino P
| author affiliation = PSEG Nuclear, LLC
| author affiliation = PSEG Nuclear, LLC
| addressee name =  
| addressee name =  

Revision as of 08:45, 12 June 2019

2018 Annual Radioactive Effluent Release Report (ARERR)
ML19115A268
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 04/25/2019
From: Casulli E, Martino P
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N19-0042
Download: ML19115A268 (124)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0PSEG APR 2 5 2019 Nuclear LLC TS 6.9.1.8 (Salem) LR-N 19-0042 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Generating Station, Units 1 and 2 TS 6.9.1.7 (Hope Creek) Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354

Subject:

2018 Annual Radioactive Effluent Release Report (ARERR) As required with Section 6.9.1.8 of Appendix A to Renewed Facility Operating License Nos. DPR-70 (Unit 1) and DPR-75 (Unit 2) for Salem Generating Stations (SGS), and Section 6.9.1.7 of Appendix A to Renewed Facility Operating License NPF-57 for Hope Creek Generating Station (HCGS), PSEG Nuclear hereby transmits one (1) copy of the combined 2018 Annual Radioactive Effluent Release Report (Enclosure 1 ). Reports SGS RERR-66 and HCGS RERR-40 were combined into one (1) report that summarizes information pertaining to the releases of radioactive materials in liquid, gaseous, and solid form from the SGS and the HCGS for the period January 1, 2018 to December 31, 2018. There are no regulatory commitments contained in this letter. If you have any questions or require any additional information, please contact Mr. Rick Heathwaite at (856) 339-2076.

Sincerely, Martino Plant Manager Salem Generating Stations Edward T. Casulli Plant Manager Hope Creek Generating Station Enclosure 1: 2018 Annual Radioactive Effluent Release Report for Salem and Hope Creek Generating Stations APR 2 fi 2019 Page 2 LR-N19-0042 cc: Administrator, Region I, NRC NRC Project Manager, Salem NRC Project Manager, Hope Creek NRC Senior Resident Inspector, Salem NRC Senior Resident Inspector, Hope Creek Mr. J. Furia, Inspector, Region I, NRC TS 6.9.1.8 (Salem) TS 6.9.1.7 (Hope Creek) Mr. P. Mulligan, Chief, NJ Bureau of Nuclear Engineering (NJBNE) Mr. L. Marabella, Corporate Commitment Tracking Coordinator-w/o enclosure Mr. T. Cachaza, Salem Commitment Tracking Coordinator-w/o enclosure Ms. K. Stokes, Hope Creek Commitment Tracking Coordinator-w/o enclosure