ML17018A123: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 23: Line 23:


Pursuant to Regional Office Policy Guide 0801, "Management Directive 8.3 and Inspection Manual Chapter 0309 Reactive Team Inspection Decisions, Implementation
Pursuant to Regional Office Policy Guide 0801, "Management Directive 8.3 and Inspection Manual Chapter 0309 Reactive Team Inspection Decisions, Implementation
, and Documentation for Power Reactors," the enclosed table provides the Management Directive
, and Documentation for Power Reactors," the enclosed table provides the Management Directive 8.3 evaluation for determining that a Special Inspection T eam inspection will be conducted at Palo Verde for the catastrophic failure of the Unit 3 emergency diesel generator
 
===8.3 evaluation===
for determining that a Special Inspection T eam inspection will be conducted at Palo Verde for the catastrophic failure of the Unit 3 emergency diesel generator
. Concur with Recommendation:
. Concur with Recommendation:
                 /RA/  1/17/17  Kriss M. Kennedy Date  Regional Administrator
                 /RA/  1/17/17  Kriss M. Kennedy Date  Regional Administrator

Revision as of 18:12, 6 May 2019

Management Directive 8.3 Evaluation for Palo Verde Unit 3 Emergency Diesel Generator Failure
ML17018A123
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/17/2017
From: Miller G B
NRC/RGN-IV/DRP/RPB-D
To: Kennedy K M
Region 4 Administrator
Miller G B
References
MD 8.3
Download: ML17018A123 (5)


Text

January 17, 201 7 MEMORANDUM TO:

Kriss M. Kennedy, Regional Administrator THRU: Troy W. Pruett, Director /RA/ Division of Reactor Projects FROM: Geoffrey B. Miller, Chief /RA/ Project Branch D

SUBJECT:

MANAGEMENT DIRECTIVE 8.3 EVALUATION FOR PALO VERDE UNIT 3 EMERGENCY DIESEL GENERATOR FAILURE

Pursuant to Regional Office Policy Guide 0801, "Management Directive 8.3 and Inspection Manual Chapter 0309 Reactive Team Inspection Decisions, Implementation

, and Documentation for Power Reactors," the enclosed table provides the Management Directive 8.3 evaluation for determining that a Special Inspection T eam inspection will be conducted at Palo Verde for the catastrophic failure of the Unit 3 emergency diesel generator

. Concur with Recommendation:

/RA/ 1/17/17 Kriss M. Kennedy Date Regional Administrator

Enclosure s: MD 8.3 Decision Documentation Form (Deterministic and Risk Criteria Analyzed)

CONTACT: Geoffrey B. Miller 817-200-1173 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011

-4511

ML17018A123 SUNSI Review By: JLD ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4/A.7 OFFICE RIV:SPE:DRP SRA:DRS/PSB2 C:DRP/D D:DRS D:DRP NAME JDixon DLoveless GMiller AVegel TPruett SIGNATURE /RA Geoff Miller for

/ /RA/ /RA/ /RA/ /RA/ DATE 12/27/16 1/5/17 1/9/17 1/9/17 1/10/17