YEV NE3 UEI N/AJA ANE UDEý Enter the equipment class name from Appendix B: Classes of Equipment.
YEV NE3 UEI N/AJA ANE UDEý Enter the equipment class name from Appendix B: Classes of Equipment.
Page 84 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 O 3f Status: Y11 NF] [IE]Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21LCVO115B Equip. Class' 8 Equipment Description RWST TO CHARGING PUMP SUCTION VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Page 84 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 O 3f Status: Y11 NF] [IE]Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21LCVO115B Equip. Class' 8 Equipment Description RWST TO CHARGING PUMP SUCTION VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Y? N] UM] N/AO eqimnsses tdes-.-t and-,  
Y? N] UM] N/AO eqimnsses tdes-.-t and-,
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y 1 M NO] U!- N/AD and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y 1 M NO] U!- N/AD and masonry block walls not likely to collapse onto the equipment?
e 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions l1. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
e 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions l1. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Revision as of 16:56, 28 April 2019

Enclosure 1, Including Attachments 1 to 8: Licensing Summary of Walkdown Report. Part 2 of 7
ML13252A153
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/04/2013
From:
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML13252A148 List:
References
NL-13-1555
Download: ML13252A153 (102)


Text

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 F2., 2A Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E16H05B Sheet i of 3 Status: YVNOIN UI[Equip. Class' 10 Equipment Description AUX FEEDWA TER PUMP ROOM COOLER 2B Location:

Bldg. AUXILIARY Floor El. 100 Room, Area 2 ] ?#,7-Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YD N8 YgNE-' UD N/AEI YR(N- UD N/AD 4. Is the anchorage free of visible cracks in the concrete near the anchors? Y NI'-I] UD N/AD 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YD ND UD N/A[7 YO'- U[]'Enter the equipment class name from Appendix B: Classes of Equipment.

Page 69 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E16HOO5B Equip.SheSa2 Of 3 Status: NEI- U--Equipment Description AUX FEEDWA TER PUMP ROOM COOLER 2B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Y/N[E UE1 /W YUKNEI IE1 N/AE-YZN I]UE N/Ao'4,4)Toe. uf-- Sep eLbr4 -8 (ojT see r)o~.. --M .L OY-Q 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y[-NE) U0-Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YIýE" UE adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) 04 /y Evaluated by: Scýf --" J I/.-. 1 Date: P. 21. 2_.cl/l /2:/-Page 70 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 71 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E16H007 Equip. Class, 10 Equipment Description MCC 2A ROOM COOLER'A S Sheet I of -Status: Y/N 'D UEI Location:

Bldg. AUXILIARY Floor El. 139 Room, Area 2-.'Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yl] N21 Y[O/N 4" Ul- N/Al]Y[ý'NO Ul] N/A[]YN-N[J Ul- N/Al-YO- NO" UI- N/AGY Y N-] Un1 Enter the equipment class name from Appendix B: Classes of Equipment.

Page 72 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0-A Sheet 2 ofX/-Status: UE-Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E16HO07 Equip. Class' 10 Equipment Description MCC 2A ROOM COOLER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YEAEI UE] N/AD Y[RNlf'I UEI N/AE-'YI/N4- U0I N/A[YEl'NEI UE]Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y[/NEI Ul--adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by:.Y UAA L..Date: 6-29-144-0 .Xr" ~-1 Page 73 of 467 0 NO. SNCF164-RPT-02, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 74 of 467 0 0 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 75 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 ('2-.Sheet i of,'4 Status: YZ N[] Ur]Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E16H008 Equip. Class, 10 Equipment Description 121'MCC2B Room ACU Location:

Bldg. Aux bldo Floor El. 121' Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the resulls of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Anchorage configuration was based on SEWS for Q2E16H008-B and Q2E16H007-A, dated 07-03-93 and 07-01-93 respectively.

2. Is the anchorage free of bent, broken, missing or loose hardware?Welded to embedded steel 3. Is the anchorage free of cortosion that is more than mild surface oxidation?

YZ Ni YZ NEI UD N/AD YN NO UD N/AD Very minor surface corrosion and cracked paint observed.

No degradation of weld observed.

Condition has no adverse seismic impact.4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ N' UD N/AD 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YN ND UD N/AD YN NO UD Enter the equipment class name fsom Appendix B: Classes of Equipment.

Page 76 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 4 Status: YCK NEI uF"]Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E16H008 Equip. Class' 10 Equipment Description 121'MCC 2B Room ACU Interaction Effecs 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipmoent, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Component is adjacent to a block wall. The wall was seismically qualified as part of the response to NRC t. E. Bulletin 80-11, as documented in Report No FTG-C-002, RO, and on drawing D-206004, R 16.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seisnic interaction effects?Y0 NE UO N/AO YZ NO Ur N/AQ1 Y13 NO UD N/AO Y[ NO UMI Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could Y9 NO UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) ly2& t,"Y P ,G I -/Evaluated by: P._Miktus~~tDt:0.31 Date: 08-23-12 08-23-12 Page 77 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 78 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 79 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet i ofýi 'I(I Status: Y1 NO] Ui-]Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21FT0943 Equip. Class, 18 Equipment Description HIGH HEAD SAFETY INJECTION FLOW TRANSMITTER Location:

Bldg. AUXILIARY Floor El. 100 Room, Area 17 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraee 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YId NO UEI N/AO Yd~ NEI UO N/AE 4. Is the anchorage free of visible cracks in the concrete near the anchors? Y[J NEI U- N/AO 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

YE] NE U- N/A[v/NO1,V0~ O45 ApeQewo :3 00%c A#J 4lq8CJ4D2A6iE V&AiFICATro&)

ib Por 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YS'NEI U-I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 80 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Seismic Walkdown Checklist (SWC)Equipment M1 No. Q2E21FT0943 Equip. Class, 18 Equipment Description HIGH HEAD SAFETY INJECTION FLOW TRANSMITTER Sheet 2 of)' , S tatus: Y"[f N -- U W- A" Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YM/N'- UC] N/AC-]8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NO- U[:] N/AC and masonry block walls not likely to collapse onto tite equipment?.oeK WAIJ-L5 e'j rNE We6r Oe V e_.,.LVA ArE)P 9.NDo ac ed l T Fea t-(2-e ex , to -F. DW4 dN-ZoaN5og.

9. Do attached lines have adequate flexibility to avoid damage? NO] U[- N/A[: Y/NO UC]10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YU NEI UC-]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

/Mote Evaluated by: 3.M'TVS 2 Date: 1-274-Page 81 of 467 0 NO. SNCF164-RPT-02, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 82 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 83 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet i off 3 Status: YA NO UO Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21LCVO115B Equip. Class' 8 Equipment Description RWST TO CHARGING PUMP SUCTION VALVE Location:

Bldg. AUXILIARY Floor El. 100 Room, Area 2-.1-7 2.Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YE N[l of the 50% of SWEL items requiring such verification)?

Inline Corry.rw-ht, rlc ctchot-jo.cd

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YEr NEI UE N/Ap YEI NE UE N/A[I 4. Is the anchorage free of visible cracks in the concrete near the anchors? YE" NEI UiE N/Ap 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YEV NE3 UEI N/AJA ANE UDEý Enter the equipment class name from Appendix B: Classes of Equipment.

Page 84 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 O 3f Status: Y11 NF] [IE]Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21LCVO115B Equip. Class' 8 Equipment Description RWST TO CHARGING PUMP SUCTION VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Y? N] UM] N/AO eqimnsses tdes-.-t and-,

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y 1 M NO] U!- N/AD and masonry block walls not likely to collapse onto the equipment?

e 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions l1. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YP NE] U!] N/A7 YINE] U!]NEI UE Comments (Additional pages may be added as necessary)

Evaluated by: r I!ga- / T"+/-+/-* .,r4 -',"A"JY1~

V U'- /An illol (06-d Date: _ W 1 i ~ 2--LLktm MaQdL~a o i Page 85 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 86 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2,0 i lif Page 87 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet I of 3 Status: Y[VN- UE-Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21LT112 Equip. Class' 18 Equipment Description VCT LEVEL TRANSMITTER Location:

Bldg. AUXILIARY Floor El. 121 Room, Area 2 -21, Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YEN"NO" UE N/AE[Y1$EN" U0 N/AE 4. Is the anchorage free of visible cracks in the concrete near the anchors? \TNE" UE N/AE" 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE NE UE] N/A/Y"/ND UE'Enter the equipment class name from Appendix B: Classes of Equipment.

Page 88 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Seismic Walkdown Checklist (SWC)Sh t Of 3 Status: Y;['N[- Un-Equipment ED No. 02E21LT112 Equip. Class, 18 Equipment Description VCT LEVEL TRANSMITTER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

S. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

YO/ND UE1 N/AE3 YE-týfl UE] N/AE1 9. Do attached lines have adequate flexibility to avoid damage? Y[E)NEI UrI N/A0--1 -r. ,) o , 10. Based on the above seismic interaction evaluations, is equipment free Y-" NEI U of potentially adverse seismic interaction effects?Other Adverse Conditions 1I. Have you looked for and found no otiler seismic conditions that could 'YEýN-I UE]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

'I Evaluated by: Date: -__________

Date J J Page 89 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 90 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0-This 'cqof: A iS, css , c, -n,.- a'S Seismic Walkdown Checklist (SWC) QQ E a2 I Va 3 Equipment ID No. 02E21MOV8100 Equip. Class' 8 Equipment Description RCP SEAL WATER RETURN ISOLATION Sheet i ofXAt Status: Yd NO UUJ Location:

Bldg. AUXILIARY Floor El. 121 Room, Area ,?Q Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraoe 1. Is the anchorage configuration verification required (i.e., is the item one Y" Ne of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YE NM U171 N/Adf YO NO UO N/A@/w , ,k ' q .e_.\, ,q ,t , , x Q U -?.V\ Y 4 , ( O , , \ z ý c t -o- 12 .4. Is the anchorage free of visible cracks in the concrete near the anchors? YO No UiE N/An'k \- V rit 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

YO NE Uti N/AX'Y0"N0 uC Page 91 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of3 l Status: Y[Z- NE-] U[]Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21MOV8100 Equip. Class, 8 Equipment Description RCP SEAL WATER RETURN ISOLATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interactiou effects?Y2 NEI UI- N/A[l Y5ý/1- UEI N/A5 Y(NE] UE3 N/AEI YE]N1 E3Uu Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could Ye NEl UFI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: / j Date: ~3 l~Page 92 of 467 NO. SNCF164-RPT-02, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 93 of 467 NO. SNCF164-RPT-02, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 94 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 T Ci _ r\l -' s qlso , o-5 She71of 3 Seismic Walkdown Checklist (SWC) E & \'"/, t% Status: 7 NEl UE-Equipment D No. Q2E21MOV8108 Equip. Class' 8 Equipment Description CHARGING PUMP TO RCS ISOLATION Location:

Bldg. AUXILIARY Floor El. 121 Room, Area Q69a Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YOI N%of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YO] NEI UO N/AE9-Y(:] NI- UF] N/A2-4'. I st a ch e , 4f-re o s c k t c _ocrc hO-4. Is the anchorage free of visible cracks in the concrete near the anchors? YI-] N-I U-i] N/Az']5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YOI NI] UI0 N/As YR NI] U-I 1ý1- `ýý A-ýý is -ý-ctze ý:P Enter the equipment class name from Appendix B: Classes of Equipment.

Page 95 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 3 Status: YZI NEI UE"]Seismic Walkdown Checklist (SWC)Equipment lD No. Q2E21MOV8108 Equip. Class, 8 Equipment Description CHARGING PUMP TO RCS ISOLATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?I0. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Ya NO U- N/A-Y~f/N- U] N/AC YE(NI U- N/AI/UC Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could YO'NO U-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)Evaluated by: .. 3 ,Q...1&cVX Date: Page 96 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 97 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 V2" 1P Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21MOV8109C Equip. Class, 8 Equipment Description CHARGING PUMP PO02C MINIFLOW VALVE Sheet i of Status: Y5 NEI U1-]Location:

Bldg. AUXILIARY Floor El. 102 Room, Area M 2ý1ýýManufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checldist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YE Njt of the 50% of SWEL items requiring such verification)?

Irtitpr a c hO oCboro,-cue.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YED NE UE N/AC&YE NE UE N/Ap YE NEI UE N/A0 YE NEI UE N/A4 Y0 NO UE Enter the equipment class name from Appendix B: Classes of Equipment.

Page 98 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of" 4 Status: Y[5 NEI UE-Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21MOV8109C Equip. Class' 8 Equipment Description CHARGING PUMP PO02C MINIFLOW VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YEA NO UD N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yg NDI UD N/AD and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YV NEI UD N/AD YP NO UD Other Adverse Conditions I1. Have you looked for and found no other seismic conditions that could Yy ND UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: .GoAMAa o- -1(W Loolut o\AC'tUA/Date: _ -_ ___ __Page 99 of 467 0 3 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 100 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 IPage 101 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet i °fz¢ 43 A Status: Yf NO UE $1011" Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21MOV8130A Equip. Classw 8 Equipment Description CHG PUMP SUCTION HDR ISOLATION Location:

Bldg. AUXILIARY Floor El. 100 Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentiafly adverse seismic conditions?

YEI Nd YE NEI UE- N/A[R YEI NE UE N/AG YO NE UE N/A[?YEr NEI UE] N/AdN[- UE-Enter the equipment class name from Appendix B: Classes of Equipment.

I Page 102 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of42 Status: Y NEI U[Jltjl? v Seismic Walkdown Checklist (SWC)Equipment ID No. 02E21MOV8130A Equip. Class' 8 Equipment Description CHG PUMP SUCTION HDR ISOLA TION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Y[dNI-- U-J N/AE1 Y[4 NE UE- N/AEl 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Siva Vag ' 0 y0 ME r £-'AI- d,4 oF 1e PAw imKegeeALLJA-T" tV4,o&V- &619'2r FTý-c!.-,94Z, 1-4. DaAiWtA tI-20b?2,IP9.

9. Do aitached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YQ NE UI-1 N/AE1 Yd NIE- UEI Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Yd NEI UE-]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by Pn~R5 Date: __ "_ 7-/___Page 103 of 467 0 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 104 of 467 S ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 2.0 Page 105 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 II&I I Sheetttsd.:Y uE%Status: U[71 Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21MOV8133A Equip. Class, 8 Equipment Description CHG PUMP DISCHARGE HDR ISOLATION Location:

Bldg. AUXILIARY Floor El. 100 Room, Area ZI1_Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other conmnents.

Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y[3N Y[3 N[3 uE N/UD(YE- NE UCI N/A[/YEI NE- UC- N/A[v'YE[ NEI U['-D Y4NC UEI Enter the equipment class name from Appendix B: Classes of Equipment.

Page 106 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 F! -3q Seismic Walkdown Checklist (SWC)Sheet Status: Y0- NEI U[:[ ,lDl'l Equipment ID No. Q2E21MOV8133A Equip. Class' 8 Equipment Description CHG PUMP DISCHARGE HDR ISOLATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YW"ND U'- N/AC]8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YNr"NC] UC) N/AC and masonry block walls not likely to collapse onto the equipment?

JA01- RF-,,2- FrA,-C.-0,,0.-

16L&CI -WAL Tl VALLtA1Tj

' 1W 9 PPi T- -2 9. Do attached lines have adequate flexibiltty to avoi damage? YC"Nr UC- N/AC 10. Based on the above seismic interaction evaluations, is equipment free Y[2j NCI UC of potentially adverse seismic interaction effects?Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YEY NCI UCD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) dIatJI Fvalutaedtby PIMIRM)..........

2.5 IVA ..Date: 11274-r S 7-f 7, Page 107 of 467 NO. SNCF164-RPT-02, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 108 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 109 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0/Seismic Walkdown Checklist (SWC)Sheet i ofl Jf Status: YP NEI Uj-]Equipment ID No. Q2E21MOV8885 Equip. Class, 8 Equipment Description HHSI TO RCS COLD LEG ISOLATION Location:

Bldg. AUXILIARY Floor El. 100 Room, Area 2., A Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YO] No of the 50% of SWEL items requiring such verification)?

il-%lrxr coirn~ctx-,t, no~ a.nr,ý2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE] NE] UE] N/AI9 YE] NE] UE] N/Ag YE] NE] UE] N/A0 YE] NE] UE] N/A0 Y'rNEI U50Ie* k Enter the equipment class name from Appendix B: Classes of Equipment.

Page 110 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21MOV8885 Sheet 2 oft Status: Y54! NF'- U#J Equip. Class, 8 Equipment Description HHSt TO RCS COLD LEG ISOLATPON Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Y ' NE] UF] N/A[]i,ý I Ix' ýq-'1/2 %3F- j 4't -, , s'j tý,cj Mcqcgosc 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage'?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEI U[E] N/AE[Ye NE] U[3 N/A]Y[A NE] U[E Other Adverse Conditions
11. Have you looked fbr and found no other seismic conditions that could U[I adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: L.acixg Mctc~lcxf Date: -2Z VZ-" Page 111 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 112 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 113 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Seismic Walkdown Checklist (SWC)Equipment ID No. 02E21PO02

-Equip.Sheet s of 16 Status;: YJ'No Ut]Equipment Description CHARGING/HHSI PUMP P002B SWING PUMP Location:

Bldg. AUXILIARY Floor El. 100 Room, Area 7"11-4 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end ofthis checklist for documenting other comments.Anchoraee 1. Is the anchorage configuration verification required (i.e., is the item one Y10 No of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage fe of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verfication is required.)

~a 5N~.05e jI 4v k IE-Z I 9,907A 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y'ND ULID N/AD Y[1N- UO N/AD YINO Uf N/AD Y'/NO UQ N/AD YG(NO U-I Ent=i the equipment class name from Appendix B: Claones of Equipment Page 114 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of rS Status: Yf NO] U0 Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21PO02B Equip. Class, 5 Equipment Description CHARGING/I"/HSI PUMP P00219 SWING PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y&ýNO UC N/AQ3 Y[/N0 U[:] N/At YI'NQ UD N/AQ YL NC UQ Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YG/N[] UD Comments (Additional pages may be added as necessary)

C 6 0 k j 0 r 6 0 r 01~t~M1 T A6 V- M4fi ý Ome pýýD Evaluated by:_ P-MIXTO ad"9" Date: 27-1 1.6.- 7 -1'/, Page 115 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 116 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 2.0 NJ Page 117 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 0 NO. SNCF164-RPT-02, VERSION 2.0 (AJ-,,J"c1 Page 118 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet ovY4 11 Status: Y) NO UE-Seismic Walkdown Checklist (SWC)Equipment ID No. Q2F16LT0501 Equip. Class, 18 Equipment Description RWST LEVEL TRANSMITTER Location:

Bldg. YARD Floor El. 155 Room, Area RWST Manufacturer, Model. Etc. (optional but recontmended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e.. is the item one YEI N52" of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? UE- N/AEr 3. Is the anchorage free of corrosion that is more than mild surface YO '"NDN UEI N/AEr oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YR.NE-I UEJ N/AE_a,,,j,;',/d 07" -'5*10.¢ " o ( 5. Is the anchorage configuration consistent with plant documentation?

YE3 NEI UE" N/AAI-'" (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YkNiE UEr potentially adverse seismic conditions?

Enter the equipment class name front Appendix B: Classes uf Equpnment.

Page 119 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Shee. of (,/WLj Status: YM NEI U['-Seismic Walkdown Checklist (SWC)Equipment ID No. Q2F16LT0501 Equip. Class' 18 Equipment Description RWST LEVEL TRANSMITTER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are. overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Y6frEi5UD N/AD*ý NNo U'] N/AD 9. Do attached lines have adequate flexibility to avoid damage? 6N" UEI-' N/AD ofBased on the above seismic interaction evaluations, is equipment free Y ND UD of potentially adverse seismidc interaction effects?Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: (2- .Date: V. -o. 2 ./uzo/20/Z Page 120 of 467 0 NO. SNCF164-RPT-02, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 121 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 122 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Seismic Walkdown Checklist (SWC)Sheet i of 3ý4 Status: YP -] UF]Equipment ID No. Q2G31HOO1B Equip. Class' 21 Equipment Description SFP HEAT EXCHANGER TRAIN A Location:

Bldg. AUXILIARY Floor El. 165 Room, Area Z4La7 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YO/NE)of the 50% of SWEL items requiring such verification)?

2.1--b 2. Is the anchorage free of bent, broken, missing or loose hardware?YkýNEI UE] N/AE YP'NE] UO N/AM 3. Is the anchorage free of corrosion that is more than mild surface oxiOation?

4shean the- convret 4ea othe aor Y[p<c ] N 4. Is the anchorage free of visible cracks in the concrete near the anchors? YONE] UE] N/ACI 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seistmic conditions?

4KNE] UE1 N/AE1'ýi0/N UEI Enter the equipment class natne from Appendix B: Classes of Equipment.

Page 123 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Cleo Sheet 2 of/ I Status: Y[t NE- U-Seismic Walkdown Checklist (SWC)Equipment ID No. Q2G31HOO1B Equip. ClassI 21 Equipment Description SFP HEAT EXCHANGER TRAIN A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YPAE] U[- N/A12 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Y~1\JE U0 N/AEI 10. Based on the above seismic interaction evaluations, is equipment free Yt]-Nf Uij of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could O-NE] UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary),fb Af &Evaluated Date: -'2~Page 124 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 125 of 467 NO. SNCF164-RPT-02, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 126 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 rý- 41 Seismic Walkdown Checklist (SWC)Sheet i ofN u/j Status: NEI UE-- '4111" Equipment ID No. Q2H11NGASC2506D Equip. Class, 20 Equipment Description AUX SAFEGUARDS CABINET D Location:

Bldg. AUXILIARY Floor El. 155 Room, Area 471 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchora2e I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yd NEI YEl NEI UO N/AO YE/N- UI- N/A7]4. Is the anchorage free of visible cracks in the concrete near the anchors? Y[ NOI UFJ N/A]5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

h4M .ollgjý 06jF167tY 4rigiV 0.2&lr/9//

A61A " vsr -5 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

YfNO Ul] N/Al]Qz Uit hYOA 50 2 ,5-o& A-q2' 4P 0 PIUPC 216o54-)Y9~ NO Ul Page 127 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of X 5 7(jdy , Status: Y9NE- U[-- O'll Seismic Walkdown Checklist (SWC)Equipment ID No. Q2H1INGASC2506D Equip. Class 1 Equipment Description AUX SAFEGUARDS CABINET L Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y[2(N[E UE1 N/AE]YE3'NEJ Ul1 N/AE1 YD/NE) UEI N/AQl Y2( NEI UM Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YE'N"I Uf adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) rMi- A/ I c Mg-,9 " FZ -;;70 ,' TA , 'k. : ,-.-°,VA.II" t Evaluated by: , VL). 0 Al(-Date: __ __ _- __ __//Page 128 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 129 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 130 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 131 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0..I ' " Sheet s of" 4e &Status: YE NO U["] Seismic Walkdown Checklist (SWC)Equipment ID No. 02H1 1NGB2504K Equip. Class' 20 Equipment Description BOP INSTRUMENTATION CABINET K Location:

Bldg. AUX Floor El. 155 Room, Area 0471 Manufacturer, Model. Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YZ NM of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of conrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Panel is welded to embedded plate in floor. Welds are on the outside of the panel. The welds were confirmed to be consistent with the welds identified and evaluated in the SEWS package for this component dated 7/1/93. All welds were determined to be free from adverse conditions and to match plant documentation.

See pages ,t3'for pictures of typical welds 4. "-t9 Enter the equipment class name from Appendix B: Classes of Equipment.

Y[ NEI UEr N/AEf YN NEI UE" N/Ar-YN NEI ur- N/AE YZ NE] UEI N/A['-Page 132 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of,-r (g M Status: Y[ NEI U[] Seismic Walkdown Checklist (SWC)Equipment ID No. Q2HI INGB254KU Equip. Class, 20 Equipmient Description BOP INSTRUMENTATION CABINET K Interaction Effects 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YED NEI U-Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting.and masonry block walls not likely to collapse onto the equipment?

Isolated cases were found where some of the east-west spanning runners were not clipped to the north south spanning runners.However, all north south spanning runners are supported from the roof and are prevented from lateral motion. The lights, vents and other items are supported from the structure independently from the ceiling tile system. The overall configuration is consistent with the configuration identified and evaluated in the SEWS walkdown performed on 7/1/93. Due to the fact that the unclipped runners occur only in isolated cases and the fact that all tiles are supported on at least three sides, the ceiling tiles will not fall and adversely impact the panels. There are no ceiling tiles directly over any panels and the panels are all closed on the top. A corrective action report has been issued to reattach the loose runners.9. Do attached lines have adequate flexibility to avoid damage?YZ NEI UI N/AO YZ NO U[O N/Ar YG3 NO Ufi N/AO 10. Based on the above seistmtic interaction evaluations, is equipment fiee YZ NO U-of potentially adverse seismic interaction effects?Other Adverse Conditions I1. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YZ NO UO Page 133 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of,4/0 JW Status: Y1 N'-' UE" 11011.Seismic Walkdown Checklist (SWC)Equipmenl ID No. Q2H11NGB2504K Equip. ClassI 20 Equipment Description BOP INSTRUMENTATION CABINET K Comments (Additional pages may be added as necessary)

Evaluated by: hamIKWt' Date: f-7_.- 7-S I -)-.Page 134 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 135 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 136 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 137 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 1 of 4 Status: YE] NE] UN 20 Seismic Walkdown Checklist (SWC)Equipment ID No. Q2HI1NGNIS2503A Equip. Class Equipment Description NIS EXCORE DETECTOR CAB Location:

Bldg. AUXILIARY Floor El. 155' Room, Area 416 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

See note in question #6 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Some anchorages (welds) of this cabinet are under a vinyl kick plate at its base. The FNP Ops Shift Sup was uncomfortable authorizing the removal of the kick plate due to the potential to bump the cabinet during removal. Review of the anchorages (and of this component overall) were therefore marked Undetermined.

See Comments pg 2.YE[: NO YEO NOI UZ N/AE YEI NEI UO N/AE YO NE UO N/AE YE NE UO N/AE YO NEI UO Enter the equipment class name from Appendix B: Classes of Equipment.

Page 138 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)Equipment ID No. Q2H11NGNIS2503A Equip. Class'Equipment Description NIS EXCORE DETECTOR CAB NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 4 Status: YE] NEl] U[20 INET Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YZ NE] Ur- N/A2 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE] Ur- N/AO and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NE! UE N/AC]YO NEI UO Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YI NEI UI Comments (Additional pages may be added as necessary)

This SWC was originally completed on 8-28-12 and retyped for clarity on 8-27-13. The subject component was removed from the SWEL since the anchorages could not be verified.

This is discussed in the note in Question 6 on pg 1. However, the conclusions of the 8-28-12 walkdown, in response to Questions 7 through 11 above are valid. The Area Walk By for this component, i.e., for Room 416 is documented in AWC package FI-091.Evaluated by: Stephen Yuan kw, A a Date: 08-28-12 08-28-12 Paul A. Miktus Page 139 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 140 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 3 Page 141 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet t ofA Status; YEE NO UF]Seismic Walkdown Checklist (SWC)Equipment ID No. O2HI1NGPIC2505D Equip. Class, 20 Equipment Description Process Protection Cabinet Channel 4 Location:

Bldg. Aux. Bldq Floor El. 155' Room. Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorag$.

I. Is the anchorage configuration verification required (i.e.. is the item one YZ NO of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent. broken. missing or loose hardware?Cabinet is welded to embedded steel in the floor.3. Is the anchorage fiee of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage documentation was obtained from SEWS package for this component, dated 7/1/93. Anchorage consists of welds to an embedded plate located on outside of cabinet. Carpeting was partially removed to verify that welds match documented condition and that they have no adverse seismic conditions.

YZ NEI UD N/AD YZ NO UE N/AO YZ NI UQ N/AE YZ NO Uf N/A" Enter the equipment class name from Appendix B: Classes of Equipment.

Page 142 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Seismic Walkdown Checklist (SWC)Sheet 2ofkfg 1[$.[ V Status: YN NEI U["]Equipment ID No. 02HI 1NGPIC2505D Equip. Class' 20 Equipment Description Process Protection Cabinet Channel 4 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YI ND UO Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment.

distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse Onto the equipment?

Suspended ceiling and fixtures (lights, vents, etc) inspected and determined to be seismically adequate.

Isolated cases found where runners were not clipped at both ends. See walkdown package for 02H I1NGB2504K (package F2-42) and CR506358 for additional information on the control room ceiling.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y0 NEI U- N/AD YZ NEI U- N/AD YZ NO UD N/AD Y0 NO U-Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO ND UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Verified the adequacy of welds as per SEWS for O2H 11NGBR2504K-B and Q2H11 NGPIC2505A-I, dated 7-1-93. The Area Walk By is included in package F2-42.Page 143 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Evaluated by: P. Miktus S. Yuan Sheet 3 of 4-'.i Date: 08-23-12 08-23-12 Page 144 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 145 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 146 of 467 S NO. SNCF164-RPT-02, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 147 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 11 IJ Page 148 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0-i Page 149 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 150 of 467 0 NO. SNCF164-RPT-02, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 151 of 467 I ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 152 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 153 of 467 0 NO. SNCF164-RPT-02, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS

~~1 Page 154 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 FZ-4.Seismic Walkdown Checklist (SWC)Sheet i feIt 0's Status: YZ NrD UEI1 Equipment ID No. Q2HI1NGPIC2505H Equip. Class' 20 Equipment Description Process Control Cabinet Channel 4 Location:

Bldg. Aux. Bldg Floor El. 155' Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YED NDI of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet is welded to embedded steel in the floor.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage documentation was obtained from SEWS package for this component, dated 7/1/93. Anchorage consists of welds to an embedded plate located on outside of cabinet. Carpeting was partially removed to verify that welds match documented condition and that they have no adverse seismic conditions.

YZ NEI UD N/AD Y0 ND UD N/AD Y[ NDI UD N/AD YZ ND UD N/AD I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 155 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 OfI74t~trA Status: YZ NEI U-Seismic Walkdown Checklist (SWC)Equipment ID No. Q2HI1NGPIC2505H Equip. Class, Equipment Description Process Control Cabinet Channe t14 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YZ NE UD Interaction Effects 7. Are soft targets free froom impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Suspended ceiling and fixtures (lights, vents, etc) inspected and determined to be seismically adequate.

Isolated cases found where runners were not clipped at both ends. See walkdown package for 02H11 NGB2504K (package F2-42) and CR506358 for additional information on the control room ceiling.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEI UE N/AQ YN NEI U0 N/AEl YZ NEl UE- N/AE YZ NC UE Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could Y[ NEI UEi adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Verified the adequacy of welds as per SEWS for Q2H 11NGBR2504K-B and Q2HI 1NGPIC2505A-1, dated 7-1-93. The Area Walk By package in included in package F2-42 Page 156 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Eva Iu a kdby: P. Miktu 1 J- 92 S. Yzian Sheet 3 Of" 3 it Date: 08.23-12 08-23-12 Page 157 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 158 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 159 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 160 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 161 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 162 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 163 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 164 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 165 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 S heet Nof U status: y[f1" NE] uE'Seismic Walkdown Checklist (SWC)Equipment ID No. Q2H1 INGSSP2506N Equip. Class, 20 Equipment Description SOLID STATE PROTECTION TEST CABINET Location:

Bldg. AUXILIARY FloorEl. 155 Room, Area 4-1 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.An chorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Y2/ND Y[-I(NE] UED N/AE1 YM/N[] UE3 N/A[s Yt9INE] UE1 N/AEI 5. Is the anchorage configuration consistent with plant documentation? N[l U[' N/AE3 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Re-..70 Pok2 Q2HaI00G5P~Z5064-.A,VATet>

7-1 -4, Ao 0 eu D -5E- --6. Based on the above anchorage evaluations, is the anchorage free of Y.N[ Urn potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 166 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 JSheet 2 6f,!ý"ýStatus: YIgNE[ U-]Seismic Walkdown Checklist (SWC)Equipment ID No. Q2H11NGSSP2506N Equip. Class' 20 Equipment Description SOLID STATE PROTECTION TEST CABINET Interaction Effects 7. Are soft targets free from impact by nearby equipmcnt or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YEZ NEI UE3 N/AE3 YPýINEI UIII N/AEl Y[E]NEI UEI N/ACI YEI'NE1 UE]Other Adverse Conditions 1I. Hlave you looked for and found no other seismic conditions that could YE]. 'NrE UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) idj 0 ýP Evaluated by: 'PAý) A Date: -"&: .$ A, 3 -',.: s Page 167 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0!v Page 168 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO, SNCF164-RPT-02, VERSION 2.0 Page 169 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 170 of 467