| | number = ML14105A402 | | | number = ML14105A402 |
| | issue date = 06/18/2014 | | | issue date = 06/18/2014 |
| | title = Donald C. Cook Nuclear Plant, Units 1 and 2, Nuclear Regulatory Commission Staff Review of Revision to Regulatory Commitments Associated with Application for Renewed Operating License (TAC Nos. MF1308 & MF1309) | | | title = Nuclear Regulatory Commission Staff Review of Revision to Regulatory Commitments Associated with Application for Renewed Operating License (TAC Nos. MF1308 & MF1309) |
| | author name = Wengert T J | | | author name = Wengert T J |
| | author affiliation = NRC/NRR/DORL/LPLIII-1 | | | author affiliation = NRC/NRR/DORL/LPLIII-1 |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] |
Text
Mr. Lawrence J. Weber Senior Vice President and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 18, 2014 Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106
SUBJECT:
DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2-NUCLEAR REGULATORY COMMISSION STAFF REVIEW OF REVISION TO REGULA TORY COMMITMENTS ASSOCIATED WITH APPLICATION FOR RENEWED OPERATING LICENSE (TAC NOS. MF1308 AND MF1309)
Dear Mr. Weber:
By letter dated March 1, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13073A 11 0), Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP), Units 1 and 2 submitted information and notified the U.S. Nuclear Regulatory Commission (NRC) of revisions to two commitments made in support of its license renewal application for the CNP units. The two commitments were evaluated in NUREG-1831, "Safety Evaluation Report Related to the License Renewal of the Donald C. Cook Nuclear Plant, Units 1 and 2" (ADAMS Accession No. ML052230442), which supported the CNP license renewal. The Renewed Facility Operating Licenses were issued on August 30, 2005 (ADAMS Accession No. ML052340339).
By letter dated August 22, 2013 (ADAMS Accession No. ML 13240A129), I&M submitted a response to the NRC staff's request for additional information.
The first commitment, identified as "Commitment 1" in I&M's March 1, 2013, letter, concerns enhancements to the Preventive Maintenance Program, including the management of the aging effects for the security diesel engine elastomer flex hoses or tubing. I&M's original commitment for inclusion of the security diesel generator room is provided in Commitment No. 16 in Appendix A of NUREG-1831.
The licensee revised this commitment to remove the security diesel engine elastomer flex hoses or tubing from the scope of the program. The second commitment, identified as "Commitment 2" in I&M's March 1, 2013, letter, concerns enhancements to the Structures Monitoring Program for various structures, systems, and components, including the security diesel generator room. I&M's original commitment for inclusion of the security diesel generator room is provided in Commitment No. 23 in Appendix A of NUREG-1831.
The licensee revised this commitment to remove the security diesel generator room from the scope of the program. In its March 1, 2013, letter, the licensee stated that they were making both of these commitment changes because " ... the security diesel generator engine does not meet the seeping requirements specified in 10 CFR 54.4, because the security diesel generator does not perform L. Weber a safety function and is not credited for outside lighting for either the Appendix R or National Fire Protection Association 805 Fire Protection Programs." The NRC staff reviewed the above revised commitments as described by the licensee and reviewed the commitments in their original form as evaluated in the safety evaluation report (NUREG-1831) supporting issuance of the Renewed Facility Operating Licenses.
The NRC staff has determined that the revised commitments do not have any impact on the finding of acceptability in NUREG-1831 of I&M's aging management program for extended operation of the CNP units. Accordingly, the NRC staff acknowledges the changed commitments but takes no action to revise NUREG-1831 or the Renewed Facility Operating Licenses.
If you have any questions regarding this matter, please contact me at (301) 415-4037.
Docket Nos. 50-315 and 50-316 cc: Distribution via ListServ Sincerely, Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation L. Weber a safety function and is not credited for outside lighting for either the Appendix R or National Fire Protection Association 805 Fire Protection Programs." The NRC staff reviewed the above revised commitments as described by the licensee and reviewed the commitments in their original form as evaluated in the safety evaluation report (NUREG-1831) supporting issuance of the Renewed Facility Operating Licenses.
The NRC staff has determined that the revised commitments do not have any impact on the finding of acceptability in NUREG-1831 of I&M's aging management program for extended operation of the CNP units. Accordingly, the NRC staff acknowledges the changed commitments but takes no action to revise NUREG-1831 or the Renewed Facility Operating Licenses.
If you have any questions regarding this matter, please contact me at (301) 415-4037.
Docket Nos. 50-315 and 50-316 cc: Distribution via ListServ DISTRIBUTION:
PUBLIC LPL3-1 r/f RidsNrrPMDCCook Resource RidsNrrMHenderson Resource RidsNrrDssSpbp Resource Sincerely, IRA/ Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsAcrsAcnw_MaiiCTR Resource RidsNrrDoriDprResource RidsRgn3MaiiCenter Resource DReddy, NRR RidsNrrDorllpl3-1 Resource RidsNrrDirRasb Resource ABuford, NRR ADAMS Accession Number: ML 14105A402 OFFICE NRR/LPL3-1/PM NRR/LPL3-1/LA NRR/RASB/BC NRR/SBPB/BC NRR/LPL3-1/BC NRR/LPL3-1/PM NAME TWengert MHenderson MMarshall GCasto RCa rison TWengert DATE 06/5/14 06/5/14 06/11/14 06/13/14 06/17/14 06/18/14 OFFICIAL RECORD COPY