ML18240A159: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML18240A159 | | number = ML18240A159 | ||
| issue date = 08/28/2018 | | issue date = 08/28/2018 | ||
| title = | | title = 301 Exam Administrative Items (ADAMS-2D) | ||
| author name = | | author name = | ||
| author affiliation = NRC/RGN-II | | author affiliation = NRC/RGN-II |
Revision as of 05:43, 22 April 2019
ML18240A159 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 08/28/2018 |
From: | NRC/RGN-II |
To: | Duke Energy Progress |
References | |
50-400/18-301 50/400/OL-18 | |
Download: ML18240A159 (28) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 Harris Nuclear Plant 201 8 NRC Operating Exam Submittal 2-2 8-201 8 / Rev FINAL Facility: Harris Nuclear Plant Date of Exam:
March 5, 2018 Operating Test No.:
05000400/2018301 A P P L I C A N T E V E N T T Y P E Scenarios 1 3 2 T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P R I U RO-1 SRO-I SRO-U RX R1 1 1 NOR N1 1 1 I/C C3, C4 I2, C6 4 4 MAJ M6 M7 2 2 TS 0 0 RO-2 SRO-I SRO-U RX R1 1 1 NOR N1 1 1 I/C C3, C4 I2, C6 4 4 MAJ M6 M7 2 2 TS 0 0 RO-3 SRO-I SRO-U RX R1 1 1 NOR N1 N1 2 1 I/C C3, C4 I2, C6 I2, C4 6 4 MAJ M6 M7 M6 3 2 TS 0 0 RO-4 SRO-I SRO-U RX R1 1 1 NOR N1 1 1 I/C I3, C5 C3, I5 4 4 MAJ M7 M6 2 2 TS 0 0 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at
-the-controls (ATC) and balance
-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO
-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one
-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Harris Nuclear Plant 201 8 NRC Operating Exam Submittal 2-2 8-201 8 / Rev FINAL Facility: Harris Nuclear Plant Date of Exam:
March 5, 2018 Operating Test No.:
05000400/201 8301 A P P L I C A N T E V E N T T Y P E Scenarios 1 3 2 T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P R I U RO SRO-I-1 SRO-U RX R1 R1 2 1 NOR N1 1 1 I/C C2, C5 I2, I3 C5, C6 6 4 MAJ M6 M7 2 2 TS T3, T5 2 2 RO SRO-I-2 SRO-U RX R1 R1 2 1 NOR N1 1 1 I/C C2, C5 I2, I3 C5, C6 6 4 MAJ M6 M7 2 2 TS T3, T5 2 2 RO SRO-I-3 SRO-U RX R1 R1 2 1 NOR N1 1 1 I/C C2, C5 I2, I3 C5, C6 6 4 MAJ M6 M7 2 2 TS T3, T5 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at
-the-controls (ATC) and balance
-of-plant (BOP) positions. Instant SROs (SRO
-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO
-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one
-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Harris Nuclear Plant 201 8 NRC Operating Exam Submittal 2-2 8-201 8 / Rev FINAL Facility: Harris Nuclear Plant Date of Exam:
March 5, 2018 Operating Test No.:
05000400/2018301 A P P L I C A N T E V E N T T Y P E Scenarios 1 3 2 T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P R I U RO SRO-I SRO-U 1 RX R1 1 0 NOR N1 1 1 I/C C2, C3, C4, C5 4 2 MAJ M6 1 1 TS T3, T5 2 2 RO SRO-I SRO-U 2 RX R1 1 0 NOR N1 1 1 I/C C2, C3, C4, C5 4 2 MAJ M6 1 1 TS T3, T5 2 2 RO SRO-I SRO-U 3 RX R1 1 0 NOR N1 N1 2 1 I/C C2, C3, C4, C5 I3, C5 6 2 MAJ M6 M7 2 1 TS T 3, T5 2 2 RO SRO-I SRO-U 4 RX R1 1 0 NOR N1 N1 2 1 I/C I3, C5 I2, C3 C4, I 5 6 2 MAJ M7 M 6 2 1 TS T2, T3 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at
-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO
-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO
-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one
-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Harris Nuclear Plant 201 8 NRC Operating Exam Submittal 2-2 8-201 8 / Rev FINAL Facility: Harris Nuclear Plant Date of Exam:
March 5, 2018 Operating Test No.:
05000400/2018301 A P P L I C A N T E V E N T T Y P E Scenarios 4 (SPARE) T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P R I U RO SRO-I SRO-U RX R1 1 1 1 0 NOR N1 1 1 1 1 I/C C2, I3 C4, I5 4 4 4 2 MAJ M6, M8 2 2 2 1 TS T2, T3 T4, T5 4 0 2 2 RO SRO-I SRO-U RX R1 1 1 1 0 NOR 0 1 1 1 I/C C2, I5 2 4 4 2 MAJ M6, M8 2 2 2 1 TS 0 0 2 2 RO SRO-I SRO-U RX 0 1 1 0 NOR N1 1 1 1 1 I/C I3, C4 2 4 4 2 MAJ M6, M8 2 2 2 1 TS 0 0 2 2 Instructions
- 1. Check the applicant level and enter the operating test number and Form ES D 1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at the controls (ATC) and balance of plant (BOP) positions. Instant SROs (SRO I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one for one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO I applicants in either the ATC or BOP position to best evaluate the SRO I in manipulating plant controls.
Harris Nuclear Plant 201 8 NRC Operating Exam Submittal 2-2 8-201 8 / Rev FINAL ES-301 Competencies Checklist Form ES-301-6 Facility: Harris Nuclear Plant Date of Examination:
March 5, 2018
Operating Test No.:05000400/2018301 Competencies APPLICANTS RO (BOP) SRO-I (RO) SRO-U SCENARIO SCENARIO SCENARIO 1 1 1 Interpret / Diagnose Events and Conditions 3, 4, 6, 7 , 8 2, 5, 6, 7 2, 3, 4, 5 6, 7 , 8 Comply With and Use Procedures (1) 1, 3, 4, 6 , 7 , 8 1, 2 , 5 , 6 , 7 1, 2, 3, 4 5, 6, 7, 8 Operate Control Boards (2) 1, 3, 4, 6, 7, 8 1, 2, 5, 6, 7 0 Communicate and Interact 1, 3, 4, 6, 7, 8 1, 2, 5, 6, 7 1, 2, 3, 4 5, 6, 7, 8 Demonstrate Supervisory Ability (3) 0 0 1, 2, 3, 4 5, 6, 7, 8 Comply With and Use Tech. Specs. (3) 0 0 3 , 5 Notes: (1) Includes Technical Specification compliance for an RO. (2) Optional for an SRO-U. (3) Only applicable to SROs.
Instructions:
Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant. (This includes all rating factors for each competency.)
(Competency Rating factors as described on forms ES
-30 3-1 and ES-30 3-3.) ES-301, Page 27 of 27
Harris Nuclear Plant 201 8 NRC Operating Exam Submittal 2-2 8-201 8 / Rev FINAL ES-301 Competencies Checklist Form ES-301-6 Facility: Harris Nuclear Plant Date of Examination:
March 5, 2018
Operating Test No.:05000400/2018301 Competencies APPLICANTS RO SRO-U RO (BOP) SCENARIO SCENARIO SCENARIO 2 2 2 Interpret / Diagnose Events and Conditions 3, 5, 6, 8 2, 3, 4, 5 6, 7, 8 2, 4, 6, 7 Comply With and Use Procedures (1) 1, 3, 5, 6, 8 1, 2, 3, 4, 5 6, 7, 8 1, 2, 4, 6, 7 Operate Control Boards (2) 1, 3, 5, 6, 8 0 1, 2, 4, 6, 7 Communicate and Interact 1, 3, 5, 6, 8 1, 2, 3, 4, 5 6, 7, 8 1, 2, 4, 6, 7 Demonstrate Supervisory Ability (3) 0 1, 2, 3, 4, 5 6, 7, 8 0 Comply With and Use Tech. Specs. (3) 0 2, 3 0 Notes: (1) Includes Technical Specification compliance for an RO. (2) Optional for an SRO-U. (3) Only applicable to SROs.
Instructions:
Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant. (This includes all rating factors for each competency.)
(Competency Rating factors as described on forms ES
-30 3-1 and ES-30 3-3.) ES-301, Page 27 of 27
Harris Nuclear Plant 201 8 NRC Operating Exam Submittal 2-2 8-201 8 / Rev FINAL ES-301 Competencies Checklist Form ES-301-6 Facility: Harris Nuclear Plant Date of Examination:
March 5, 2018
Operating Test No.:05000400/2018301 Competencies APPLICANTS RO RO (BOP) SRO-I SRO-U (BOP) SCENARIO SCENARIO SCENARIO SCENARIO 3 3 3 3 Interpret / Diagnose Events and Conditions 2, 6, 7, 8 3, 5, 7, 9 2, 3, 4, 5 6, 7, 8, 9 3, 5, 7, 9 Comply With and Use Procedures (1) 1, 2, 6, 7, 8 1, 3, 5, 7, 9 1, 2, 3, 4, 5 6, 7, 8, 9 1, 3, 5, 7, 9 Operate Control Boards (2) 1, 2, 6, 7, 8 1, 3, 5, 7, 9 0 1, 3, 5, 7, 9 Communicate and Interact 1, 2, 6, 7, 8 1, 3, 5, 7, 9 1, 2, 3, 4, 5 6, 7, 8, 9 1, 3, 5, 7, 9 Demonstrate Supervisory Ability (3) 0 0 1, 2, 3, 4, 5 6, 7, 8, 9 0 Comply With and Use Tech. Specs. (3) 0 0 3, 5 0 Notes: (1) Includes Technical Specification compliance for an RO. (2) Optional for an SRO-U. (3) Only applicable to SROs.
Instructions:
Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant. (This includes all rating factors for each competency.)
(Competency Rating factors as described on forms ES
-30 3-1 and ES-30 3-3.) ES-301, Page 27 of 27 Harris Nuclear Plant 201 8 NRC Operating Exam Submittal 2-2 8-201 8 / Rev FINAL Facility: Harris Nuclear Plant Date of Examination:
March 5, 2018
Operating Test No.:05000400/2018301 Competencies APPLICANTS RO RO (BOP) SRO-I SRO-U SRO-I (RO) SRO-U (RO) SRO-I (BOP) SRO-U (BOP) SCENARIO SCENARIO SCENARIO SCENARIO SCENARIO 4 4 4 4 4 Interpret / Diagnose Events and Conditions 2, 5, 6, 8 3, 4, 6, 7, 8, 9 2, 3, 4, 5 6, 7, 8, 9 2, 5, 6, 8 3, 4, 6, 7, 8, 9 Comply With and Use Procedures (1) 1, 2, 5, 6, 8 1, 3, 4, 6, 7 8, 9 1, 2, 3, 4, 5 6, 7, 8, 9 1, 2, 5, 6, 8 1, 3, 4, 6, 7 8, 9 Operate Control Boards (2) 1, 2, 5, 6, 8 1, 3, 4, 6, 7 8, 9 0 1, 2, 5, 6, 8 1, 3, 4, 6, 7 8, 9 Communicate and Interact 1, 2, 5, 6, 8 1, 3, 4, 6, 7 8, 9 1, 2, 3, 4, 5 6, 7, 8, 9 1, 2, 5, 6, 8 1, 3, 4, 6, 7 8, 9 Demonstrate Supervisory Ability (3) 0 0 1, 2, 3, 4, 5 6, 7, 8, 9 0 0 Comply With and Use Tech. Specs. (3) 0 0 2, 3, 4, 5 0 0 Notes: (1) Includes Technical Specification compliance for an RO. (2) Optional for an SRO-U. (3) Only applicable to SROs.
SCENARIO #
4 selected as the SPARE Scenario by Chief Examiner Instructions:
Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant. (This includes all rating factors for each competency.)
(Competency Rating factors as described on forms ES
-30 3-1 and ES-30 3-3.)