ML082280073: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML082280073
| number = ML082280073
| issue date = 08/14/2008
| issue date = 08/14/2008
| title = Millstone, Units 2 & 3 and North Anna and Surry, Units 1& 2 - NRC Regulatory Issue Summary 2008-16 Preparation and Scheduling of Operator Licensing Examinations
| title = Units 1& 2 - NRC Regulatory Issue Summary 2008-16 Preparation and Scheduling of Operator Licensing Examinations
| author name = Funderburk C L
| author name = Funderburk C L
| author affiliation = Dominion Energy Kewaunee, Inc, Dominion Nuclear Connecticut, Inc, Virginia Electric & Power Co (VEPCO)
| author affiliation = Dominion Energy Kewaunee, Inc, Dominion Nuclear Connecticut, Inc, Virginia Electric & Power Co (VEPCO)

Revision as of 08:46, 17 April 2019

Units 1& 2 - NRC Regulatory Issue Summary 2008-16 Preparation and Scheduling of Operator Licensing Examinations
ML082280073
Person / Time
Site: Millstone, Kewaunee, Surry, North Anna  Dominion icon.png
Issue date: 08/14/2008
From: Funderburk C L
Dominion Energy Kewaunee, Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
08-0436, RIS-08-016
Download: ML082280073 (8)


Text

Dominion Resources Services, Inc.SOOO Dominion Boulevard, Glen Allen, VA 2 Wi d:\\c'b i\ddress: www.dom.com August 14, 2008 08-0436 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DPR 65 NPF-49 NPF-4/7 DPR-32/37 Serial No.: NLOS/MBB Docket Nos.: DOMINION ENERGY KEWAUNEE, INC.(DEK)DOMINION NUCLEAR CONNECTICUT, INC.(DNC)VIRGINIA ELECTRIC AND POWER COMPANY (Dominion)

KEWAUNEE POWER STATION MILLSTONE POWER STATION UNITS 2&3 NORTH ANNA POWER STATION UNITS 1&2 SURRY POWER STATION UNITS 1&2 NRC REGULATORY ISSUE

SUMMARY

2008-16 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS United States Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555 In response to NRC Regulatory Issue Summary 2008-16, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).No new commitments are intended by this letter.If you have any questions concerning this information, please contact Mr.David Llewellyn at (804)273-4314.Very truly yours,?'A7 6.'C Director-Nuclear Licensing&Operations Support Dominion Resources Services, Inc.for Dominion Energy Kewaunee, Inc., Dominion Nuclear Connecticut, Inc.and Virginia Electric and Power Company Attachments SN 08-0436 Scheduling of Operator Licensing Examinations cc page 1 of 2 cc: U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 U.S.Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23 T85 Atlanta, GA 30303-8931 U.S.Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Ms.C.J.Sanders Project Manager U.S.Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 883 Rockville, MD 20852-2738 Mr.S.P.Lingam Project Manager U.S.Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8 G9A Rockville, MD 20852-2738 Mr.P.S.Tam Senior Project Manager U.S.Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9a Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station NRC Senior Resident Inspector Kewaunee Power Station SN 08-0436 Scheduling of Operator Licensing Examinations cc page 2 of 2 NRC FORM 536 U.S.NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO.3150-0131 EXPIRES: 06/31/2006 (8-2005)Estimated burden per to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.his information collection is used to plan budgets and resources for operator examinations.

Send comments burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (-5 F 3), U.S.Nuclear Commission, Washington, DC 20555-0001, or br.internet EXAMINATION DATA e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-1 0202, (3150-0131), Office of Management and Budget, Washington, DC 20503.If a means used to impose an informafion collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Millstone Power Station Unit 2 I A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12--------ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B.INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12--------NUMBER OF REACTOR 4 4 0 0 OPERATORS NUMBER OF SENIOR REACTOR 3 8 0 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 6 2 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 01/19/2009 06/14/2010 ALTERNATE DATE 01/26/2009 06/28/2010 C.PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)SCHEDULE CY 09 CY 10 PROPOSED------NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER NRC FORM 536 U.S.NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO.3150-0131 EXPIRES: 08/31/2008 (1\-2005)Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.This information collection is used to plan budgets and resources for operator examinations.

Send comments burden OPERATOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch-5 F 3), U.S.Nuclear Commission, Washington, DC 20555-000 ,or bl internet EXAMINATION DATA e-mail to in ocollects@nrc'80v, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503."a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to.the information collection.

FACILITY NRC REGION Millstone Power Station Unit 3 I A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12--------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B.INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12--------NUMBER OF REACTOR 6 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 8 0 4 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 09/14/2009 01/25/2011 ALTERNATE DATE 09/28/2009 01/18/2011 C.PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)SCHEDULE CY 09 CY 10 PROPOSED------NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH SEPTEMBER JUNE DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER NRC FORM 536 U.S.NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO.3150-0131 EXPIRES: 08/31/2008 (8-2005)Estimated burden per to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.his information collection is used to plan budgets and resources for operator examinations.

Send comments rllf+arding burden OPERA TOR LICENSING estimate to the Records and FOIAIPlivacy Services Branch\-5 F 3), U.S.Nuclear Commission, Washington, DC 20555-000 ,or brc internet EXAMINATION DATA e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE 8-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.If a means used to impose an information collection does not display a currenUy valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION North Anna Power Station II A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12--------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS (written only)ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B.INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12--------NUMBER OF REACTOR 3 12 0 10 OPERATORS NUMBER OF SENIOR REACTOR 1 5 0 5 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2 3 0 3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 02/02/2009 06/07/2010 06/11/2012 ALTERNATE DATE 01/27/2009 06/14/2010 06/18/2012 C.PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)SCHEDULE CY 09 CY 10 PROPOSED

--NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 17 CANDIDATES NRC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER NRC FORM 536 U.S.NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO.3150-0131 EXPIRES: 08/31/2008 (8*2005)Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.This information collection is used to plan budgets and resources for operator examinations.

Send comments rerrdin5 burden OPERA TOR LICENSING estimate to the Records and FOINPrivacy Services Branch-5 F 3), U.S.Nuclear Commission, Washington, DC 20555-000 ,or bf<internet EXAMINATION DATA e-mail to in OCOliects@nrc'gov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Surry Power Station II A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12--------ESTIMATED NUMBER OF L1CENSEE*PREPARED 0 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1 1 1 0 EXAMINATIONS B.INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12--------NUMBER OF REACTOR 0 14 12 0 OPERATORS NUMBER OF SENIOR REACTOR 0 6 6 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 6 2 4 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 07/20/2009 07/26/2010 10/31/2011 ALTERNATE DATE 07/27/2009 08/02/2010 11/14/2011 C.PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)SCHEDULE CY 09 CY 10 PROPOSED---NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 20 20 CANDIDATES N'lC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER NRC FORM 536 U.S.NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO.3150-0131 EXPIRES: 08/31/2008 (8-2005)Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.This information collection is used to plan budgets and resources for operator examinations.

Send comments burden OPERA TOR LICENSING estimate to the Records and FOINPrivacy Services Branch-5 F 3), U.S.Nuclear Rev,ulatory Commission, Washington, DC 20555-000 ,or b?;internet EXAMINATION DATA e-mail to in OColiects@nrc'gov.

and to the Desk Officer, Office of In ormation and RegUlatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Kewaunee Power Station III A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12--------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B.INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12--------NUMBER OF REACTOR 5 0 5 5 OPERATORS NUMBER OF SENIOR REACTOR 8 0 9 9 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 0 1 1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 04/13/2009 02/07/2011 10/15/2012 ALTERNATE DATE 05/04/2009 02/21/2011 10/29/2012 C.PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)SCHEDULE CY 09 CY 10 PROPOSED-------NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 15 CANDIDATES NRC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER