MONTHYEARIR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22354A2582022-12-15015 December 2022 10_RBS-2022-12 Post-Exam Comments ML23004A1922022-12-14014 December 2022 11_RBS-2022-12 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000458/20223012021-11-30030 November 2021 Notification of NRC Initial Operator Licensing Examination 05000458/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations 2CAN042102, 10 AN2-2021-03 Post-Exam Comments2021-04-16016 April 2021 10_AN2-2021-03 Post-Exam Comments ML21096A0252021-02-19019 February 2021 RB-2021-02 Draft Written Exam Comments ML21096A0242021-02-19019 February 2021 RB-2021-02 Draft Outlines ML21096A0272021-02-19019 February 2021 RB-2021-02 Final Outlines ML21096A0232021-02-19019 February 2021 RB-2021-02 Draft Outline Comments ML21095A0532021-02-19019 February 2021 RB-2021-02 Final Op Test ML21096A0282021-02-19019 February 2021 RB-2021-02 Final Written Exam ML21096A0322021-02-19019 February 2021 RB-2021-02 Post Exam Comments ML21111A1472021-02-19019 February 2021 RB-2021-02 Public Forms ML21096A0212021-02-19019 February 2021 RB-2021-02 Draft Operating Test Comments ML21096A0262021-02-19019 February 2021 RB-2021-02 Draft Written Exam ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20006C6592019-11-26026 November 2019 2019-11-Post Exam Comments ML20015A4712019-11-26026 November 2019 2019-11-Public Forms ML19312B5852019-11-0808 November 2019 NRC Initial Operator Licensing Examination Approval 05000458/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18340A0892018-12-0606 December 2018 Notification of NRC Initial Operator Licensing Examination 05000458/2019301 ML18198A2172018-07-16016 July 2018 NRC Initial Operator Licensing Examination Approval 05000458/2018301 ML18135A0672018-05-14014 May 2018 Response to Regulatory Issue Summary 2018-02 ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17361A0422017-12-26026 December 2017 Notification of NRC Initial Operator Licensing Examination 05000458/2018301 ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16280A4602016-09-30030 September 2016 2016-09 Draft Outlines ML16285A0172016-09-30030 September 2016 2016-09 Public Forms ML16280A4652016-09-30030 September 2016 2016-09 Final Outlines ML16280A4642016-09-30030 September 2016 2016-09 Draft Written Exam ML16280A4492016-09-30030 September 2016 2016-09-Written Handouts Package ML16280A4352016-09-30030 September 2016 2016-09 Final Written Exam ML16280A4622016-09-30030 September 2016 2016-09 Draft Written Comments ML16280A4592016-09-30030 September 2016 2016-09 Draft Outline Comments ML16280A4562016-09-30030 September 2016 2016-09 Draft Op Test ML16280A4532016-09-30030 September 2016 2016-09 Draft Op Test Comments ML16280A4372016-09-12012 September 2016 2016-09 Final Op Test ML16246A0012016-09-0101 September 2016 NRC Initial Operator Licensing Examination Approval 05000458/2016301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15180A0512015-06-29029 June 2015 Generic Fundamentals Examination Results June 2015 ML16043A0022015-06-19019 June 2015 May 2015 Draft Written Initial License Retake Exam, Reactor Operator ML16043A0012015-06-19019 June 2015 2015-05-DRAFT Outline 2024-04-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22354A2582022-12-15015 December 2022 10_RBS-2022-12 Post-Exam Comments ML23004A1922022-12-14014 December 2022 11_RBS-2022-12 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000458/20223012021-11-30030 November 2021 Notification of NRC Initial Operator Licensing Examination 05000458/2022301 2CAN042102, 10 AN2-2021-03 Post-Exam Comments2021-04-16016 April 2021 10_AN2-2021-03 Post-Exam Comments ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21096A0212021-02-19019 February 2021 RB-2021-02 Draft Operating Test Comments ML21096A0262021-02-19019 February 2021 RB-2021-02 Draft Written Exam ML21096A0232021-02-19019 February 2021 RB-2021-02 Draft Outline Comments ML21096A0252021-02-19019 February 2021 RB-2021-02 Draft Written Exam Comments ML21096A0282021-02-19019 February 2021 RB-2021-02 Final Written Exam ML21111A1472021-02-19019 February 2021 RB-2021-02 Public Forms ML21095A0532021-02-19019 February 2021 RB-2021-02 Final Op Test ML21096A0322021-02-19019 February 2021 RB-2021-02 Post Exam Comments ML21096A0272021-02-19019 February 2021 RB-2021-02 Final Outlines ML21096A0242021-02-19019 February 2021 RB-2021-02 Draft Outlines ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20015A4712019-11-26026 November 2019 2019-11-Public Forms ML20006C6592019-11-26026 November 2019 2019-11-Post Exam Comments ML19312B5852019-11-0808 November 2019 NRC Initial Operator Licensing Examination Approval 05000458/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18340A0892018-12-0606 December 2018 Notification of NRC Initial Operator Licensing Examination 05000458/2019301 ML18198A2172018-07-16016 July 2018 NRC Initial Operator Licensing Examination Approval 05000458/2018301 ML18135A0672018-05-14014 May 2018 Response to Regulatory Issue Summary 2018-02 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17361A0422017-12-26026 December 2017 Notification of NRC Initial Operator Licensing Examination 05000458/2018301 ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML16280A4622016-09-30030 September 2016 2016-09 Draft Written Comments ML16280A4642016-09-30030 September 2016 2016-09 Draft Written Exam ML16280A4602016-09-30030 September 2016 2016-09 Draft Outlines ML16280A4352016-09-30030 September 2016 2016-09 Final Written Exam ML16280A4532016-09-30030 September 2016 2016-09 Draft Op Test Comments ML16285A0172016-09-30030 September 2016 2016-09 Public Forms ML16280A4592016-09-30030 September 2016 2016-09 Draft Outline Comments ML16280A4652016-09-30030 September 2016 2016-09 Final Outlines ML16280A4562016-09-30030 September 2016 2016-09 Draft Op Test ML16280A4492016-09-30030 September 2016 2016-09-Written Handouts Package ML16280A4372016-09-12012 September 2016 2016-09 Final Op Test ML16246A0012016-09-0101 September 2016 NRC Initial Operator Licensing Examination Approval 05000458/2016301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15180A0512015-06-29029 June 2015 Generic Fundamentals Examination Results June 2015 ML15220A1382015-06-19019 June 2015 2015-05-POST-EXAM Comments Analysis ML15220A1392015-06-19019 June 2015 June 2015 Initial License Retake Exam, Reactor Operator, with Answer Key ML16043A0002015-06-19019 June 2015 2015-05 - Draft Outline Comments ML16043A0012015-06-19019 June 2015 2015-05-DRAFT Outline ML16043A0022015-06-19019 June 2015 May 2015 Draft Written Initial License Retake Exam, Reactor Operator 2024-04-02
[Table view] |
Text
Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Rev 0 Facility: RB First Exam Date:11/21/2008 Written Exam Outline (Date) Comment Resolution 1 Put revision number on all forms. Done. 2 Add "RO" to title of written exam outline Done.
3 Tier 3 - RO: K/A's 2.2.12 and 2.3.11 were on both the 2004 and 2007 NRC exams. Randomly select different K/A's.
Done. Re-selected KA 2.2.3 and 2.3.7.
4 For the K3's that were oversampled, add "in T2G1" for clarification. "K3's were oversampled in T2G1 while K5 -"
Done. 5 The bottom entry of ES-401-4 has the E/APE designator of 295022. This should be 295002.
Done. 6 Reword the reason for rejection of T3 G.2.2.5. RBS surely considers knowledge of the process for making design or operating changes to the
facility important - maybe not for RO's?
Done. Administrative JPM Outline (9/3/08) Comment Resolution 1 Use "A" designators (A1, A2, etc) Done.
2 Is SRO Conduct of Ops "Determine Alt. DHR method" a repeat from 2004 NRC
exam? Yes. For resolution, see comment #3 below.
3 SRO - K/A 2.1.25 has been used on last two NRC exams. Select another K/A.
This exam will be the second time it has been used on the RO exam (don't select it for the next NRC exam).
Done. Selected KA 2.1.20. Completion of GOP-0004 calculations when entering Single Loop Operation for SRO exam.
No change to RO exam. Will not use it next
exam.
Attachment 6 OBDI 202 - IOLE Process Control Room / In-Plant System JPM Outline (Date) Comment Resolution 1 Use "C" "S" and "P" designators (C for Control Room, S for Simulator, and P for
In-Plant JPMs)
Done. 2 Reduce CR JPMs from 4 to 2 Done. Eliminated the following control room JPMs Shedding of DC Loads during a SBO Resetting APRM power supplies.
Replaced with the following simulator JPMs: Aligning Fuel Bldg Ventilation into Fuel Handling Lineup Resetting a scram per AOP-0001. 3 Simplify JPM titles Done.
4 Have a backup "N" and "A" control room system JPM (minimum is 2)
Disregarded per chief examiner.
5 Have a backup "RCA" JPM (minimum is
- 1) Disregarded per chief examiner.
6 Have a backup "L" control room system JPM (minimum is 1) (SROU)
Disregarded per chief examiner. 7 What is HVK? (see JPM "d") Control Room Ventilation & Chilled Water 8 What is "IAS" and "SVV" (see JPM "i") Instrument Air System and Air supply to Safety Relief Valves Simulator Scenario Outline Comments (Date) Comment Resolution 1 Was facility-specific or industry-generic operating experience used in development of the scenarios? Not specifically during development, however many of the events have occurred in the
industry and at RBS Single Rod scram (RBS) Turbine failure due to MSRs not balanced (Nine Mile Point) ATWS (Browns Ferry) 2 Was PRA used to identify risk-important operator actions? Loss of offsite power (Scenario 2) is highest contributor to core damage frequency.
Important Operator actions in PSA include: Recovery of Offsite Power (Scenario 2) Recovery of Feedwater (Scenario 1) Start of suppression pool cooling (Scenario 1)
Also reviewed PRA prior to rejecting KAs with IR <2.5 to ensure those tasks were not considered important operator actions.
Attachment 6 OBDI 202 - IOLE Process 3 Simplify ES-301-5 form (we'll discuss) Re-submitting Rev 1 to ES-301-5 forms. Candidate names are removed. A separate form is completed for each combination of candidates for a total of 3 forms.
4 Scenario 2 - what is major event? Also, convert to low power (<5%) scenario Outline was not annotated correctly major event is the Loss of offsite power.
The backup scenario outline has been changed to a low power scenario.
5 Scenario 3 - Event 2: APRM "F" upscale failure and Event 3: Single rod scram were a combined event on 2004 NRC exam and was a Tech Spec call. The APRM failure was also on the 2007 NRC exam - replace this event with another
TS event. Records indicate that the APRM F/Single rods scram failure was on the 2004 backup scenario which was not used. Per chief examiner, it is acceptable to use this malfunction on the 2008 exam.
6 Scenarios 1 no Tech Specs identified Done. 7 For each scenario, complete Target Quantitative Attributes from ES-301-4 (see D-1's from 2007 NRC exam) Originally misunderstood the comment. TQA are included on Revision 1 submission of
outline. 8 Scenario 2 - contains CRD pump trip.
The SRO written exam contains a question dealing with EOP mitigation strategies for this event. Select a different event or different KA on the written exam.
Done. Selected a different KA 295034 G 2.4.6.
"Knowledge of EOP mitigation strategies
regarding Secondary Containment Ventilation
High Radiation".
9 Backup scenario - event 8 has "UO" in the Event Type column - what is "UO?"
Done. UO = BOP Outline adjusted for consistency.
10 Both scenarios 1 and the backup have steam leaks as the Major Transient.
Explain the differences (operator actions, procedure usage, etc) to preclude repetitive scenarios. Scenario 1 is a leak in the drywell resulting in elevated containment parameters (EOP-2).
Backup scenariois a leak (failure to isolate) in the RCIC room which is in Secondary Containment (EOP-0003). Different strategies
used to combat the events.
11 When preparing Draft Op Test, identify all Tech Specs and action statement(s) in the D-2 for each TS call N/A 12 When preparing Draft Op Test, Critical Tasks must be carefully defined, including time limits where applicable.
N/A 13 When preparing Draft Op Test, identify all procedure transitions in the D-2's.
N/A Exam Outline Revision 1 Summary of Changes Written Exam Outlines
RO Updated Revision Number (Comment #1) Added "RO" to outline title (Comment #2) Re-selected KA 2.2.3 & 2.3.7 (Comment #3) Added "T2G1" for clarification on oversampled K3's (Comment #4) Corrected E/APE designator from 295022 to 295002 (Comment #5) Reworded reason for rejection of KA T3 G 2.2.5 (Comment #6)
SRO Rejected 295022 G2.4.6 due to overlap w ith Operating Test. Re-selected 295034 G 2.4.6 (Comment #8 on Scenario Outline Comments)
Admin JPM Outlines Added "A" designators (Comment #1) SRO Exam - Selected alternate KA for 2.1.25 due to use on previous 2 exams. New KA is 2.1.20 (Comment #2 & #3)
Control Room / In-Plant Systems Outlines Added "C, S, and P" designators (Comment #1) Reduced Control Room JPMs from 4 to 2 (Comment #2) Simplified JPM titles (Comment #3)
Simulator Scenario Outlines Identified Tech Spec events on each scenario outlin e (Comment #6) Added Target Quantitative Attributes to each scenario (Comment #7) Backup scenario contain reference to "
UO". Changed to "BOP" for consistency (Comment #9) Scenario 2 did not have a Major event identified. Major event is Loss of Offsite Power. It is now annotated correctly. (Comment #4) Changed backup scenario to a low power scenario (Comment #4) Scenario 3 - Changed MSS-MOV111/112 failures. As originally submitted, these failures brought in no alarms and did not change plant conditions enough to be noticed by the crew. Remove these failures and replaced with Isophase Bus Duct Cooling Fan 1 & 2 failures. This change does not affect the Transient and Event Checklist.