| number = ML13105A153
| number = ML13105A153
| issue date = 04/12/2013
| issue date = 04/12/2013
| title = Point Beach Assessment Followup Letter
| title = Assessment Followup Letter
| author name = Cameron J L
| author name = Cameron J L
| author affiliation = NRC/RGN-III/DRP/B6
| author affiliation = NRC/RGN-III/DRP/B6

Revision as of 21:12, 11 April 2019

Assessment Followup Letter
ML13105A153
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/12/2013
From: Cameron J L
NRC/RGN-III/DRP/B6
To: Meyer L
Point Beach
References
Download: ML13105A153 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532

-4352 April 12, 2013 Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

ASSESSMENT FOLLOW

-UP LETTER FOR POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2

Dear Mr. Meyer:

As a result of its continuous review of plant performance, which was concluded on April 11 , 2013, the U.S. Nuclear Regulatory Commission (NRC) updated its assessment of Point Beach Nuclear Plant, Units 1 and 2. The NRC's evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRC's assessment of your facility. This letter supplements, but does not supersede, the annual assessment letter issued on Marc h 4, 201 3. After reviewing Point Beach Nuclear Plant, Units 1 and 2, performance in addressing the White finding subject of this Inspection Procedure 9500 1, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," the NRC concluded your actions met the objectives of the inspection as documented in Inspection Reports (IRs) 05000266/201 3 503 and 05000301/2013 503. The finding, which occurred in the second quarter of 2012, was assessed in NRC IRs 05000266/2012504 and 05000301/2012504. Therefore, in accordance with the guidance in Inspection Manual Chapter (IMC) 0305, "Operating Reactor Assessment Program," the White finding (05000266/201 2503-01 and 05000301/2012503

-01) will only be considered in assessing plant performance for a total of four quarters and is closed. As a result, the NRC determined the performance at Point Beach Nuclear Plant, Unit 2, to be in the Licensee Response Column of the ROP Action Matrix as of April 1, 2013. This finding is also closed for Point Beach Nuclear Plant, Unit 1; however, Unit 1 will remain in the Regulatory Response Column of the ROP Action Matrix due to a greater

-than-green inspection finding from the fourth quarter of 2012, as documented in Inspection Report 05000266/2012010. In accordance with 10 CFR 2.390 of the NRC

's "Rules of Practice

," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

L. Meyer Please contact me at 630-829-9833 with any questions you have regarding this letter.

Sincerely, /RA/ Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No s. 50-266; 50-301 License No

s. DPR-24; DPR-27 cc: Distribution via ListServ

L. Meyer Please contact me at 630-829-9833 with any questions you have regarding this letter.

Sincerely, /RA/ Jamnes L. Cameron Branch 6 Division of Reactor Projects Docket No s. 50-266; 50-301 License No

s. DPR-24; DPR-27 cc: Distribution via ListServ

DOCUMENT NAME:

G:\DRPIII\1-Secy\1-Work In Progress

\Point Beach EP Closure Assmnt Lt.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME PSmagacz JCameron DATE 04/11/13 04/12/13 OFFICIAL RECORD COPY

Letter to L. Meyer from J. Cameron dated April 12, 2013.

SUBJECT:

ASSESSMENT FOLLOW

-UP LETTER FOR POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 DISTRIBUTION:

Doug Huyck RidsNrrDorlLpl3

-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Christine Lipa

Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov