Category:Drawing
MONTHYEARML24198A1052024-07-17017 July 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Petitioner Presentation 7-16-2024 - L-2024-CRS-0000 OEDO-24-00083 ML24162A0792024-06-0707 June 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Supplemental Declaration 6-7-2024 - ML24012A0052024-01-24024 January 2024 Modified from the Diablo Canyon Power Plant License Renewal Application, Figures ML23241A7792023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.4-8, Drawing 469001, Rev. 3, Restored Cross Sections & Embedment Plan Breakwaters - Restoration & Improvements ML23241A7482023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-3, Drawing 59317, Sheet 1, Mechanical Flow Diagram Containment Fuel Handling & Fan Rooms ML23241A7272023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 496279, Revision 9, Sheet 1, Electrical Schematic Diagram 4160V Diesel Generator Control No. 23 ML23241A7612023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-7, Drawing 441238, Rev. 54, Sheet 1, Electrical Single Line Meter & Relay Diagram 480 V System Bus Section 2G ML23241A7602023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 441358, Rev. 43, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 21 & 22 ML23241A7742023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-11, Drawing 437627, Revision 38, Electrical Schematic Diagram 4160V Bus Section H Automatic Transfer, Sheet 1 ML23241A7532023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-11, Drawing 516111, Sheet 1, Rev. 5, Mechanical Plans, Sections & Details Area L & GE Elev. 140'-0 ML23241A7552023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-17, Drawing 441240, Revision 48, Electrical Single Line Meter and Relay Diagram 125V D.C. System, Sheet 1 ML23241A7712023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 496276, Revision 7, Electrical Schematic Diagram 4160V Diesel Generator No. 23 and Associated Circuit Breaker, Sheet 1 ML23241A7812023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-10, Drawing 441353, Sheet 1, Rev. 30, Electrical Schematic Diagram 1460V Bus Section G Automatic Transfer ML23241A7452023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-20, Drawing 441340, Rev. 31, Sheet 1, Electrical Schematic Diagram Potential & Synchronizing Diagram 4160V Bus Sections F, G, & H ML23241A7562023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 437676, Rev. 29, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers ML23241A7632023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-6, Drawing 437916, Revision 48, Electrical Single Line Meter and Relay Diagram 480 Volt System Bus Section 1F, Sheet 1 ML23241A7392023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-2, Drawing 59316, Revision 23, Mechanical Ventilation Flow Diagram Auxiliary Building Engineered Safety Equipment Area, Sheet 1 ML23241A7492023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-7, Drawing 437542, Sheet 1, Rev. 57, Electrical Single Line Meter & Relay Diagram 480 Volt System Bus Section 1G ML23241A7522023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-8, Drawing 516103, Revision 16, Mechanical Ventilation Flow Diagrams, Sheet 1 ML23241A7682023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-18, Drawing 445295, Revision 13, Electrical Single Line Meter and Relay Diagram 125 Volt and 250 Volt D.C. System, Sheet 1 ML23241A7702023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 437667, Rev. 47, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 13 ML23241A7432023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-3a, Drawing 501366, Revision 30, Mechanical Ventilation Flow Diagram Containment Fuel Handling Fan Rooms, Sheet 1 ML23241A7402023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-8, Drawing 437543, Revision 52, Electrical Single Line Meter & Relay Diagram 480 V System Bus Section H, Sheet 1 ML23241A7302023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.4-7, Drawing 468999-1, Layout, Details, Notes ML23241A7292023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 102001, Rev. 19, Sheet 3, Piping Schematic Legend ML23241A7362023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 441355, Revision 28, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers DG 21 & 22 ML23241A7472023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-19, Drawing 437545, Revision 10, Sheet 1, Electrical Single Line Diagram Pressurized Heaters DCL-23-044, 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-10, Drawing 512904, Revision 15, Mechanical Air Monitoring Technical Support Center and Post-Accident Sampling System Air Flow Diagrams2023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-10, Drawing 512904, Revision 15, Mechanical Air Monitoring Technical Support Center and Post-Accident Sampling System Air Flow Diagrams ML23241A7262023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.19, Drawing 441218, Revision 11, Sheet 1, Electrical Single Line Meter & Relay Diagram Pressurizer Heaters ML23241A7542023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-1, Drawing 511157, Sheet 1, Rev. 21, Mechanical Control Room Flow Diagram ML23241A7352023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 441337, Revision 13, Sheet 1, Electrical Logic Diagram 4160KV Bus Section H Automatic Transfer ML23241A7782023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-2, Drawing 501365, Revision 18, Mechanial Ventilation Flow Diagram Auxiliary Building Engineered Safety Equipment Area, Sheet 1 ML23241A7282023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-9, Drawing 438165, Revision 14, Civil Emergency Diesel Generator Fuel Oil System, Sheet 1 ML23241A7322023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-4, Drawing 441229, Rev. 20, Sheet 1, Electrical Single Line Meter & Relay Diagram 4160 V System Bus Section F DG 23 ML23241A7662023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, Revision 111, Sheet 4, Condensate System ML23241A7422023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-18, Drawing 455065, Revision 12, Electrical Single Line Meter and Relay Diagram 125V and 250V DC System, Sheet 1 ML23241A7752023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, Sheet 5, Rev. 112, Condensate System ML23241A7802023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-9, Drawing 441352, Revision 26, Electrical Schematic Diagram 4160V Bus Section F Automatic Transfer, Sheet 1 ML23241A7312023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-14, Drawing 437674, Revision 32, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators Auxiliary Motors ML23241A7772023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 8.3-10, Drawing 437626, Rev. 34, Sheet 1, Electrical Schematic Diagram 4160V Bus G Automatic Transfer ML23241A7442023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 441286, Revision 11, Sheet 1, Electrical Logic Diagram 4160 Volt Bus Section F Automatic Transfer ML23241A7462023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 102023, Rev. 57, Sheet 2 ML23241A7582023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-3, Drawing 500001, Rev. 1, Piping and Mechanical Area Locaiton Plan ML23241A7652023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 437666, Revision 8, Revision 21, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers ML23241A7732023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-5, Drawing 437530, Revision 41, Electrical Single Line Meter & Relay Diagram 12KV Start-Up System, Sheet 1 ML23241A7622023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 496280, Rev. 4, Sheet 1, Electrical Schematic Diagram 4160KV Diesel Generator Control No. 23 ML23241A7342023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 441357, Rev. 44, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 21 & 22 ML23241A7722023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 441297, Revision 14, Electrical Logic Diagram 4160 Volt Bus Section G Automatic Transfer, Sheet 1 ML23241A7572023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-8, Drawing 441239, Sheet 1, Rev. 48, Electrical Single Line Meter & Relay Diagram 480 Volt System Bus Section 2H ML23241A7502023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-20, Drawing 437614, Revision 37, Electrical Schematic Diagram Bus Potential & Synchronizing 4160V System, Sheet 1 2024-07-17
[Table view] Category:Report
MONTHYEARML24305A1872024-10-31031 October 2024 OEDO-24-00083 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Petition Supplement 10-30-2024 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 ML23307A1622023-11-0303 November 2023 OIG-24-A-01 Inspector Generals Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 2024 ML23130A0052023-06-27027 June 2023 Report to Congress Regarding Diablo Canyon ML22108A2892022-05-0303 May 2022 Enclosure - Response to Representative Carbajal Regarding OIG Report on Diablo ML22108A1662022-05-0303 May 2022 Enclosure 1 - Assessment Event Inquiry Into the Nuclear Regulatory Commission Oversight of the Auxiliary Feedwater System at Diablo Canyon Nuclear ML24289A0962022-03-31031 March 2022 Definition of a Probable Maximum Tsunami at the Diablo Canyon Nuclear Power Plant Site: a Historical Perspective L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation DCL-21-071, Federally Listed Species Affects Determination Memorandum2021-10-14014 October 2021 Federally Listed Species Affects Determination Memorandum ML21188A0362021-07-0707 July 2021 Draft PG&E Letter DCL-21-046 - Diablo Canyon Unit 1: Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21076A6142021-03-17017 March 2021 NRC Examination Report 05000275/2021301 and 05000323/2021301 ML20353A3972020-12-18018 December 2020 NRC Response to Public Comment Regarding Spent Fuel Canister Drop from 2019 Regcon DCL-20-102, Nuclear Material Transaction Report for New Fuel2020-12-0909 December 2020 Nuclear Material Transaction Report for New Fuel ML20335A0132020-11-30030 November 2020 NRC Response to Public Watchdogs November 2 ML20328A3012020-11-23023 November 2020 NERC Reliability Standards for the Bulk Electric System of North America Updated July 20, 2020 (Cgnp Public Comments on Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Pre-submittal Meeting of 11/24/2020) ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 DCL-19-054, Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 12019-07-0101 July 2019 Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 ML18254A0402019-01-22022 January 2019 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 22018-09-11011 September 2018 Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 IR 05000275/20180052018-08-31031 August 2018 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018005 and 05000323/2018005) DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-72018-08-0808 August 2018 Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight2018-04-24024 April 2018 Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insights ML17024A2072017-12-18018 December 2017 Staff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation ML17341A0652017-11-30030 November 2017 Technical Evaluation Report Diablo Canyon Nuclear Power Plant Tsunami Hazard Reevaluation Review ML17334A1052017-11-29029 November 2017 Reactor Coolant System Pressure and Temperature Limits Report ML17229B6172017-08-17017 August 2017 Flaw Evaluation of Residual Heat Removal Suction Weld Joint DCL-17-064, Plant Focused Evaluation Report for External Flooding2017-07-19019 July 2017 Plant Focused Evaluation Report for External Flooding DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint2017-05-18018 May 2017 Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint DCL-16-117, Reactor Coolant System Pressure and Temperature Limits Report, Revision 152016-11-10010 November 2016 Reactor Coolant System Pressure and Temperature Limits Report, Revision 15 ML16314B0822016-11-0909 November 2016 Criteria for Protection Against Dynamic Effects Associated with a Postulated Rupture of Piping ML16314C6912016-11-0909 November 2016 Enclosure, Statement of the Problem Concerning PWR Primary Coolant System Pipe Rupture DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 ML16215A1092016-08-0202 August 2016 OEDO-16-00436 - Supplemental Information from Mr. Lochbaum 10 CFR 2.206 Petition on Apparent Violation of 10 CFR 50.9 at Diablo Canyon Nuclear Power Plant ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 ML16146A0952016-04-21021 April 2016 54006-CALC-01, Diablo Canyon Power Plant: Evaluation of Risk Significance of Permanent ILRT Extension. ML16238A1042016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). DCL-16-081, 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm).2016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16019A2242016-02-0101 February 2016 Record of Review, Dispositions to Diablo Canyon Nuclear Plant, Units 1 and 2, Internal Events, Internal Flooding, Seismic, and Fire PRA Facts and Observations ML16061A4682016-01-15015 January 2016 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV ML16061A4642016-01-15015 January 2016 Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report2016-01-14014 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16061A4592016-01-14014 January 2016 Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16048A2152015-12-15015 December 2015 Fleet Vehicle-Asset List ML16048A2072015-12-15015 December 2015 Once Through Cooling 2024-06-14
[Table view] Category:Technical
MONTHYEARML24305A1872024-10-31031 October 2024 OEDO-24-00083 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Petition Supplement 10-30-2024 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML23307A1622023-11-0303 November 2023 OIG-24-A-01 Inspector Generals Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 2024 ML24289A0962022-03-31031 March 2022 Definition of a Probable Maximum Tsunami at the Diablo Canyon Nuclear Power Plant Site: a Historical Perspective L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation ML21076A6142021-03-17017 March 2021 NRC Examination Report 05000275/2021301 and 05000323/2021301 ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 DCL-19-054, Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 12019-07-0101 July 2019 Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 22018-09-11011 September 2018 Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-72018-08-0808 August 2018 Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight2018-04-24024 April 2018 Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insights ML17341A0652017-11-30030 November 2017 Technical Evaluation Report Diablo Canyon Nuclear Power Plant Tsunami Hazard Reevaluation Review ML17334A1052017-11-29029 November 2017 Reactor Coolant System Pressure and Temperature Limits Report ML17229B6172017-08-17017 August 2017 Flaw Evaluation of Residual Heat Removal Suction Weld Joint DCL-17-064, Plant Focused Evaluation Report for External Flooding2017-07-19019 July 2017 Plant Focused Evaluation Report for External Flooding DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint2017-05-18018 May 2017 Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 ML16314C6912016-11-0909 November 2016 Enclosure, Statement of the Problem Concerning PWR Primary Coolant System Pipe Rupture ML16314B0822016-11-0909 November 2016 Criteria for Protection Against Dynamic Effects Associated with a Postulated Rupture of Piping ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 ML16146A0952016-04-21021 April 2016 54006-CALC-01, Diablo Canyon Power Plant: Evaluation of Risk Significance of Permanent ILRT Extension. DCL-16-081, 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm).2016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16238A1042016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16061A4682016-01-15015 January 2016 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV DCL-16-020, Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi ML16061A4642016-01-15015 January 2016 Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi ML16061A4592016-01-14014 January 2016 Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report2016-01-14014 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16004A3542015-12-11011 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Terms Summary of Dose Analysis & Results, Revision 1 DCL-15-134, ISFSI - Submits 2014 Annual Commitment Change Summary Report2015-11-0505 November 2015 ISFSI - Submits 2014 Annual Commitment Change Summary Report DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 82015-05-15015 May 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 ML15176A5282015-05-15015 May 2015 License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report2014-12-12012 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report2014-12-12012 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report ML16061A4712014-12-12012 December 2014 Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report ML16061A4752014-12-12012 December 2014 Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report DCL-16-020, Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report2014-12-12012 December 2014 Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report ML16061A4602014-12-0909 December 2014 Revision 9 to 993754-1-915-NP, Safety Analysis DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis2014-12-0909 December 2014 Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report ML16061A4662014-12-0101 December 2014 Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report ML16061A4692014-12-0101 December 2014 Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report ML16061A4732014-12-0101 December 2014 Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report ML16061A4702014-09-12012 September 2014 Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report ML16061A4742014-09-12012 September 2014 Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report 2024-05-08
[Table view] |