ML16197A558: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML16197A558 | | number = ML16197A558 | ||
| issue date = 07/15/2016 | | issue date = 07/15/2016 | ||
| title = | | title = Emergency Planning Changes Report | ||
| author name = Marik S M | | author name = Marik S M | ||
| author affiliation = Omaha Public Power District | | author affiliation = Omaha Public Power District | ||
Line 14: | Line 14: | ||
| page count = 50 | | page count = 50 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:Omaha Public Power District July 15, 2016 LIC-16-0057 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285 | |||
==SUBJECT:== | |||
Emergency Planning Changes 10 CFR 50.54(q) 10 CFR 50.4(b) In accordance with 10 CFR 50.54(q), the Omaha Public Power District submits a report of each such change made including a summary of its analysis. | |||
This change was reviewed and does not constitute a reduction in effectiveness. | |||
No commitments are made in this letter. If you have any questions regarding the enclosed changes , please contact Mr. Eric Plautz at 402-533-7308. 1;L9V/) Shane M. Marik Site Vice President and CNO SMM/mec Enclosure c: M. L. Dapas, NRC Regional Administrator, Region IV C.F. Lyon, NRC Project Manager S. M. Schneider, NRC Senior Resident Inspector Fort Calhoun Station, PO Box 550 Fort Calhoun, NE 68023/9610 Power Lane, Blair, NE 68008 EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 1 of 3 Rev. 9 Radiological Emergency Emergency Plan Emergency Planning Forms D D Implementing Procedures Response Plan (RERP) (EPIP) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION FC-EPF-10 REV 23 ISSUED 4-15-14 FC-EPF-42REV11ISSUED3-1-16 FC-EPF-11 REV 14 ISSUED 4-15-14 FC-EPF-12 REV 6 ISSUED 7-13-10 FC-EPF-13REV1 ISSUED 3-31-04 FC-EPF-19 REV 11 ISSUED 6-25-08 FC-EPF-2 REV 6 ISSUED 3-20-12 FC-EPF-20 REV 3 ISSUED 12-14-04 FC-EPF-21 REV 6 ISSUED 10-29-13 FC-EPF-27 REV 7 ISSUED 12-23-14 FC-EPF-3 REV 3 ISSUED 11-5-09 FC-EPF-31 REV 3 ISSUED 3-31-04 Summary of Changes: Please see the enclosed summary of changes. | |||
Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 2 of 3 Rev. 9 Radiological Emergency Emergency Plan Emergency Planning Forms D D Implementing Procedures | |||
[Z] Response Plan (RERP) (EPIP) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION FC-EPF-32 REV 2 ISSUED 4-26-07 FC-EPF-33A REV 3 ISSUED 2-14-13 FC-EPF-35 REV 0 ISSUED 3-7-00 FC-EPF-36 REV 10 ISSUED 6-11-08 FC-EPF-37 REV 1 ISSUED 3-31-04 FC-EPF-44 REV 0 ISSUED 7-29-04 FC-EPF-45 REV 0 ISSUED 10-4-05 FC-EPF-48 REV 2 ISSUED 5-14-15 FC-EPF-49 REV 1 ISSUED 1-20-09 FC-EPF-5 REV 8 ISSUED 7-27-10 FC-EPF-50 REV 6 ISSUED 10-22-15 FC-EPF-51 REV 1 ISSUED 1-22-15 Summary of Changes: Please see the enclosed summary of changes. Manager -Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 3 of 3 Rev. 9 Radiological Emergency Emergency Plan Emergency Planning Forms D D Implementing Procedures Response Plan (RERP) (EPIP) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION FC-EPF-6REV10 ISSUED 10-22-15 FC-EPF-7 REV 5 ISSUED 10-29-13 FC-EPF-8 REV 14 ISSUED 10-22-15 FC-EPF-9 REV 20 ISSUED 4-15-14 Summary of Changes: Please see the enclosed summary of changes. Manager -Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16th Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 1 of 2 Rev. 9 Radiological Emergency Emergency Plan Emergency Planning Forms D Implementing Procedures D Response Plan (RERP) (EPI P)(EP-FC-110 thru 115) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION RERP REV 19C ISSUED 5-9-13 RERP-APPENDIX A REV 25 ISSUED 6-20-14 RE RP-APPENDIX B REV 5 ISSUED 10-21-08 RERP-APPENDIX C REV 16 ISSUED 11-29-12 RERP-APPENDIX D REV 3 ISSUED 8-11-05 RERP-SECTION A REV 14 ISSUED 5-22-14 RERP-SECTION B REV 32 ISSUED 12-16-14 RERP-SECTION C REV 10 ISSUED 3-3-05 RERP-SECTION D REV 15 ISSUED 8-24-10 RERP-SECTION E REV 30 ISSUED 7-7-15 RERP-SECTION F REV 20 ISSUED 11-24-15 RERP-SECTION G REV 13 ISSUED 5-1-07 Summary of Changes: Please see the enclosed sum ary of charges. Supervifor | |||
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 08/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16th Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient , or has been transferred to another individuals , please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 2 of 2 Rev. 9 Radiological Emergency Emergency Plan Emergency Planning Forms [gJ D Implementing Procedures D Response Plan (RERP) (EPIP)(EP-FC-110 thru 115) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION RERP-SECTION H REV 40 ISSUED 12-4-14 RERP-SECTION I REV 14 ISSUED 6-23-9 RERP-SECTION J REV 24 ISSUED 3-12-15 RERP-SECTION K REV 11A ISSUED 4-30-13 RERP-SECTION L REV 14A ISSUED 5-2-13 RERP-SECTION M REV 15 ISSUED 6-1-05 RERP-SECTION N REV 14A ISSUED 6-15-06 RERP-SECTION 0 REV 14C ISSUED 1-15-13 RERP-SECTION P REV 14 ISSUED 7-7-15 Summary of Changes: Please see the enclosed summary of changes. Supervisor | |||
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 08/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16th Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 1 of 1 3 Rev. 9 D Radiological Emergency | |||
[g] Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115 , 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-110-200-AD-F-03 REV 0 ISSUED 6-16-16 EP-FC-110-200-F-01 REV 0 ISSUED 6-16-16 EP-FC-110-201-F-01 REV 0 ISSUED 6-16-16 EP-FC-111-AD-F-02 REV 1 ISSUED 12-30-14 EP-FC-111-AD-F-02 REV 2 ISSUED 6-16-16 EP-FC-111-F-01 REV 0 ISSUED 6-16-16 EP-FC-113-AD-F-01 REV 0 ISSUED 6-16-16 EP-FC-113-AD-F-02 REV 0 ISSUED 6-16-16 EP-FC-113-F-01REV0 ISSUED 6-16-16 EP-FC-113-F-02 REV 0 ISSUED 6-16-16 EP-FC-113-F-03 REV 0 ISSUED 6-16-16 EP-FC-113-F-04 REV 0 ISSUED 6-16-16 EP-FC-113-F-05 REV 0 ISSUED 6-16-16 EP-FC-113-F-06 REV 0 ISSUED 6-16-16 EP-FC-113-F-07 REV 0 ISSED 6-16-16 Summary of Changes: Please *ee the Superv#or | |||
-Emergency Planning I hereby acknowledge receipt of the above documentS/inforrnation and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient , or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 2 of 13 Rev. 9 D Radiological Emergency | |||
!SJ Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115 , 1001) (EPF) D Emergency Planning Department Manual 0 Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-113-F-11 REVO ISSUED6-16-16 EP-FC-113-F-12 REV 0 ISSUED 6-16-16 EP-FC-113-F-13 REV 0 ISSUED 6-16-16 EP-FC-113-F-23 REV 0 ISSUED 6-16-16 EP-FC-113-F-24 REV 0 ISSUED 6-16-16 EP-FC-113-F-25 REV 0 ISSUED 6-16-16 EP-FC-113-F-26 REV 0 ISSUED 6-16-16 EP-FC-113-F-29 REV 0 ISSUED 6-16-16 EP-FC-113-F-30 REV 0 ISSUED 6-16-16 EP-FC-113-F-31 REV 0 ISSUED 6-16-16 EP-FC-114-1 OO-F-01 REV 0 ISSUED 6-16-16 EP-FC-114-100-F-02 REV 0 ISSUED 6-16-16 EP-FC-114-100-F-03 REV 0 ISSUED 6-16-16 EP-FC-114-AD-F-03 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor | |||
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16'h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient , or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 3 of 1 3 Rev. 9 D Radiological Emergency IX] Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115 , 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-114-F-01 REV 0 ISSUED 6-16-16 EP-FC-115-F-01 REVO ISSUED6-16-16 EP-FC-110 REV 0 ISSUED 6-16-16 EP-FC-110-102 REV 0 ISSUED 6-16-16 EP-FC-110-200 REV 0 ISSUED 6-16-16 EP-FC-110-201 REV 0 ISSUED 6-16-16 EP-FC-110-302 REV 0 ISSUED 6-16-16 EP-FC-111 REV 0 ISSUED 6-16-16 EP-FC-113 REV 0 ISSUED 6-16-16 EP-FC-114 REV 0 ISSUED 6-16-16 EP-FC-114-100 REV 0 ISSUED 6-16-16 EP-FC-115 REV 0 ISSUED 6-16-16 EP-FC-112-100-AD-F-01 REV 0 ISSUED 6-16-16 EP-FC-112-100-F-01REV0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor | |||
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 15th Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 4 of 13 Rev. 9 D Radiological Emergency | |||
[g] Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115, 1001) (EPF) D Emergency Planning Department Manual 0 Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-112-1 OO-F-02 REV 0 ISSUED 06-16-16 EP-FC-112-100-F-03 REV 0 ISSUED 6-16-16 EP-FC-112-100-F-04 REV 0 ISSUED 6-16-16 EP-FC-112-100-F-05 REV 0 ISSUED 6-16-16 EP-FC-112-100-F-06 REV 0 ISSUED 6-16-16 EP-FC-112-1 OO-F-07 REV 0 ISSUED 6-16-16 EP-FC-112-1 OO-F-08 REV 0 ISSUED 6-16-16 EP-FC-112-200-AD-F-01 REV 0 ISSUED 6-16-16 EP-FC-112-200-AD-F-20 REV 0 ISSUED 6-16-16 EP-FC-112-200-F REV 0 ISSUED 6-16-16 EP-FC-112-200-F-02 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-03 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-04 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-05 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor | |||
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 8/1112016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals , please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 5 of 13 Rev. 9 D Radiological Emergency Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115, 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-112-200-F-08 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-09 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-11 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-14 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-17 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-19 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-23 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-24 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-25 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-26 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-28 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-29 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-30 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-31 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor | |||
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station , FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient , or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 6 of 13 Rev. 9 D Radiological Emergency | |||
[g] Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115 , 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-112-200-F-40 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-41 REV 0 ISSUED 6-16-16 EP-FC-112-300-AD-F-01 REV 0 ISSUED 6-16-16 EP-FC-112-300-AD-F-02 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-01 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-02 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-03 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-04 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-07 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-08 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-09 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-10 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-14 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-16 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor | |||
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16'h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient , or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed 0 Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 7 of 13 Rev. 9 D Radiological Emergency | |||
[8J Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115, 1001) (EPF) D Emergency Planning Department Manual 0 Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-112-400-AD-5-06 REV 0 ISSUED 6-16-16 EP-FC-112-400-AD-F-07 REV 0 ISSUED 6-16-16 EP-FC-112-400-AD-F-08 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-03 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-04 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-05 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-07 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-08 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-09 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-16 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-17 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-18 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-19 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-21 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor | |||
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station , FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/Jnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 8of13 Rev. 9 D Radiological Emergency | |||
[8J Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115, 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-112-400-F-28 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-30 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-32 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-39 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-42 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-91 REVO ISSUED6-16-16 EP-FC-112-500-F-01 REV 0 ISSUED 6-16-16 EP-FC-112-500-F-02 REV 0 ISSUED 6-16-16 EP-FC-112-500-F-03 REV 0 ISSUED 6-16-16 EP-FC-112-500-F-04 REV 0 ISSUED 6-16-16 EP-FC-112-500-F-06 REV 0 ISSUED 6-16-16 EP-FC-112-500-F-10 REV 0 ISSUED 6-16-16 EP-FC-112-500-F-11 REV 0 ISSUED 6-16-16 EP-FC-112-500-F-60 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor | |||
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals , please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 9 of 13 Rev. 9 D Radiological Emergency Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP | |||
-FC-110 thru 115 , 1001) (EPF) 0 Emergency Planning Department Manual D Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-112-AD-F-01REV0 ISSUED 6-16-16 EP-FC-112-F-01 REV 0 ISSUED 6-16-16 EP-FC-112-F-02 REV 0 ISSUED 6-16-16 EP-FC-112-F-05 REV 0 ISSUED 6-16-16 EP-FC-112-F-06 REV 0 ISSUED 6-16-16 EP-FC-112-F-07 REV 0 ISSUED 6-16-16 EP-FC-112-F-09 REV 0 ISSUED 6-16-16 EP-FC-112-F-11 REV 0 ISSUED 6-16-16 EP-FC-112-F-12 REV 0 ISSUED 6-16-16 EP-FC-112 REV 0 ISSUED 6-16-16 EP-FC-112-100 REV 0 ISSUED 6-16-16 EP-FC-112-200 REV 0 ISSUED 6-16-16 EP-FC-112-300 REV 0 ISSUED 6-16-16 EP-FC-112-400 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor | |||
-Emergency Planning I hereby acknowledge receipt of the above documentslinformation and have included them In my assigned manuals. Signature: | |||
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 1 s*h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/I nformation Page 10of13 Rev. 9 D Rad i ological Emergency Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP | |||
-FC-110 thru 115 , 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-112-500 REVO ISSUED6-16-16 EP-FC-112-1000 REVO ISSUED6-16-16 EPIP-EOF-1 REV 20 ISSUED 3-8-16 EPIP-EOF-10REV14 ISSUED 10-10-13 EPIP-EOF-11 REV 29 ISSUED 4-02-13 EPIP-EOF-19 REV 11 ISSUED 3-8-16 EPIP-EOF-21 REV SA ISSUED 6-16-16 EPIP-EOF-23 REV 9 ISSUED 2-19-13 EPIP-EOF-24 REV 7 ISSUED 1-28-14 EPIP-EOF-25 REV 1 ISSUED 3-8-16 EPIP-EOF-26 REV 2 ISSUED 3-8-16 EPIP-EOF-3 REV 29 ISSUED 10-30-14 EPIP-EOF-6 REV 50 ISSUED 2-9-16 EPIP-EOF-7 REV 27 ISSUED 3-12-15 Summary of Changes: Please see the enclosed summary of changes. Supervisor | |||
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16'h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 11 of 1 3 Rev. 9 D Radiological Emergency Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115, 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EPIP-OSC-15 REV 32 ISSUED 7-30-15 EPIP-OSC-2 REV63ISSUED11-19-15 EPIP-OSC-21 REV 21 ISSUED 4-17-14 EPIP-OSC-7 REV 5 ISSUED 5-12-15 EPIP-OSC-9 REV 15 ISSUED 9-13-12 EPIP-RR-11REV18 ISSUED 3-8-16 EPIP-RR-13 REV 18 ISSUED 7-31-15 EPIP-RR-17 REV 18 ISSUED 12-8-10 EPIP-RR-17A REV 31 ISSUED 3-8-16 EPIP-RR-19A REV 10 ISSUED 3-8-16 EPIP-RR-21A REV 8 ISSUED 3-8-16 EPIP-RR-22 REV 30 ISSUED 10-22-15 EPIP-RR-22A REV 10 ISSUED 6-8-11 EPIP-RR-25 REV 29 ISSUED 10-22-15 Summary of Changes: Please see the enclosed summary of changes. Supervisor | |||
-Emergency Planning I hereby acknowledge receipt of the above documentslinformation and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 811112016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)llnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 12 of 13 Rev. 9 D Radiological Emergency | |||
[8] Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115 , 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EPIP-RR-28 REV 12 ISSUED 3-8-16 EPIP-RR-28A REV 1 ISSUED 1-20-09 EPIP-RR-29 REV 27 ISSUED 3-8-16 EPIP-RR-39 REV 6 ISSUED 2-21-13 EPIP-RR-63 REV 16 ISSUED 7-30-15 EPIP-RR-66 REV 11 ISSUED 6-12-14 EPIP-RR-72 REV 24 ISSUED 3-8-16 EPIP-RR-87 REV 158 ISSUED 12-30-14 EPIP-RR-90 REV 8 ISSUED 3-8-16 EPIP-RR-91 REV 2 ISSUED 7-30-15 EPIP-RR-98 REV 2 ISSUED 5-12-15 EPIP-TSC-1 REV 33 ISSUED 3-18-14 EPIP-TSC-2 REV 18 ISSUED 2-4-16 EPIP-TSC-8 REV 20A ISSUED 4-30-12 Summary of Changes: Please see the enclosed summary of changes. Supervisor | |||
-Emergency Planning I hereby acknowledge receipt of the above documentsfinformation and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 8/11 /2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. 0 Document(s)/lnformation No Longer Requested/Needed 0 Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 1 3of13 Rev. 9 D Radiological Emergency | |||
[gJ Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115 , 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/ | |||
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s) | |||
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EPIP-OSC-1 REV 488 ISSUED 8-12-14 EPIP-RR-21-REV 178 ISSUED 8-14-12 TBD-EPIP-OSC-1A REV 3 ISSUED 3-1-16 T8D-EPIP-OSC-1C REV2ISSUED11-24-10 T8D-EPIP-OSC-1E REV 1A ISSUED 8-6-09 T8D-EPIP-OSC-1FREV1B ISSUED 9-22-09 T8D-EPIP-OSC-1 H REV 3 ISSUED 1-22-15 T8D-EPIP-OSC-1S REV 2 ISSUED 7-20-10 EP-FC-1001 ADDENDUM 3 REV 0 ISSUED 6-16-16 EP-FC-1001 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor | |||
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature: | |||
Date: Please sign above and return by: 8111/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/inforrnation contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s | |||
)/lnforrnation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: | |||
Executive Summary for Integration changes to Radiological Emergency Response Plan (RERP) and Emergency Plan Implementing Procedures (EPIPs). On June 16, 2016, Fort Calhoun Station (FCS) issued the [Exelon Fleet] integrated procedures to replace the previous RERPs and EPIPs. This action fulfilled a commitment made to the NRC by Omaha Public Power District and Exelon as part of the Confirmatory Action Letter associated with our exit from Inspection Manual Chapter 0350. While the majority of changes made were formatting and numbering scheme related, a thorough review of Fleet processes was conducted and these "AA" procedures were converted into "FC" procedures. | |||
In some cases, select methods and practices that were necessary for Fort Calhoun Station were not contained within the Fleet procedures; these components were added as "AD" or "F" documents as supplemental procedures. Converting the AA Fleet documents to FC, AD and F documents allows Fort Calhoun Station to maintain control of processes unique to our License. Each change was vetted through our 10CFR 50.54(q) screening process and in each case, there was no identified Reduction In Effectiveness (RIE) or negative impact on the Planning Standards or commitments. | |||
This screening process also includes disciplinary reviews as well as input from the Fleet and qualified position members. The screening paperwork includes several pages of "Summary of Changes", which will identify each procedure change. Changes were grouped by procedure series in order to organize the revisions in a logical manner. A cross-matrix was also created to ensure that each " old" RERP/EPIP was accounted for in either a new procedure or procedures; was deleted; or was replaced as a User Aid. All tasks performed in the previous format continue to be performed under the new format. | |||
Summary of changes to FCS RERP, Sections and Appendices Page 1of3 RERP: Updated format. Renamed to EP-FC-1001 to align with fleet governance format. Moved Definitions and Acronyms to Appendix E 2.1 Removed reference to Security Department for Fire Brigade. 4.0 Removed reference to Blair Industrial Park COOP. This system is no longer in use. Section A: Updated Format 1. 7 Removed Stone and Webster Engineering Corporation | |||
-service provided by company was temporary in nature and is no longer needed. 1.9 Removed Fremont Fire Department | |||
-contaminated/injured OPPD workers report to Elkhorn Center. 3.1 Changed Emergency Preparedness Test (EPT) Program to Emergency Preparedness recurring tasks. Section B: Updated format 4.5.1 F Added" and making initial notifications to the NRC" to STA duties. This aligns with FCS staffing study. Table B.1 -Aligned Column names and content to align with NUREG 0654. Aligned on shift positions with FCS staffing study. Added note defining STA making initial notifications to the NRG. Section C: Updated format only Section D: Updated format. 2.2 Changed EPIP OSC-1 to EP-FC-1001 Addendum 3. This is for implementation of Rev 6 EAL scheme. Also changed A to R for abnormal Rad Levels and S to M for System Malfunction. | |||
Section E: Updated format only. Section F: Updated Format only 2.19 Added allowable software exceptions for ERMS 2.25 Added Satellite phones Figure F-1 Added Satellite Phone to applicable locations Section G: Updated format 1.2 Changed Emergency Planning Test to recurring task. 4 Changed Emergency Planning Test to recurring task. | |||
Summary of changes to FCS RERP, Sections and Appendices Page 2 of 3 Section H: Updated format 5.1 Changed Emergency Planning Tests to procedures. | |||
====5.2.2 Changed==== | |||
repair/replacement of equipment to be coordinated through Radiation Protection Department 5.4.2 Kits maintained by RP. Section I: Updated format Removed or replaced references to system training manuals. 2.3.3 Changed EPT to station procedures. | |||
Section J: Updated format 1.2.1 Changed Fremont reception and care facility to OPPD Elkhorn Center for worker evacuation point. 1.2.2 Updated times to reflect change to Elkhorn Center. 1.4.2 Changed EPIP EOF -11 to EP-FC-113. | |||
====2.1.2 Changed==== | |||
EPIP EOF-6 to EP-FC-110, Assessment of Emergencies and EPIP EOF-7 to EP-FC-111 , Emergency Classification and Protective Actions. Section K: Updated format 2.1 Changed location of portable equipment from "onsite" to "in the warehouse". 2.3 Removed "to the EOF" as personnel will not be sent to EOF for decontamination. | |||
Section L: Updated format only Section M: Updated format only Section N: Updated format; Replaced "Emergency Planning Tests" with "Emergency Planning Procedures" Section 0: Updated format 1.0 Removed Security from Fire Brigade to align with SO-G-28 Changed CPR retraining frequency to biannually to align with TQ-AA-174 and American Red Cross standards. | |||
Replace Training Administrative Manual with Training Department Procedures. | |||
===2.0 Replaced=== | |||
Fire Brigade TPMP with TQ-AA-173, Emergency Services Training Program. 3.0 No changes 4.0 Changed "The Fort Calhoun Station (FCS) Emergency Response Organization (ERO) Training Program Master Plan (TPMP)" to "TQ-FC-113, ERO Training and Qualification" Summary of changes to FCS RERP, Sections and Appendices Page 3 of 3 5.0 Removed reference to NAl-10. Changed ERO TPMP to TQ-FC-113. | |||
6.0 No Change 7.0 Changed ERO TPMP to FCS training procedures. | |||
Changed Emergency Planning Test to Emergency Planning procedure. | |||
Section P: Updated format 1.5 Added "Site" to title of Manger-Emergency Planning Appendix A: Updated Format 1. 7 Removed Stone and Webster Engineering | |||
===1.8 Added=== | |||
Tierney-Blair LLC 1.9 Removed Fremont Fire Department Appendix B: Updated format Appendix C: Updated format. Changed Plant Review Committee (PRC) to Plant Operating Review Committee (PORC) Updated EPIPS in Cross Reference List to new procedures. | |||
Appendix D: Updated format Appendix E: NEW APPENDIX. | |||
Moved Definitions and Abbreviations from front matter to the appendices. | |||
Added URI/Rascal Summary of Procedures for this Change: EP-FC-1001 Addendum 3 Rev 0 To implement the revised EAL scheme based on NEI 99-01 Rev 6 submitted to the NRC in License Amendment Request (LAR) dated December 26, 2014. The NRC approved the License Amendment Request in a Safety Evaluation Report dated December 15, 2015. Revision 0 of Addendum 3 was intended to represent the approved document. | |||
Revision 1 of Addendum 3 was issued to incorporate changes needed since Revision 0. | |||
Summary of Procedures being assessed for this Change: Summary of Changes Page 1of26 EP-FC-110, ASSESSMENT OF EMERGENCIES-New procedure the provides guidance on how to operate the ERO computer applications used to gather and evaluate data from various tools and processes to effectively assess accident conditions. | |||
This procedure did not supersede any FCS Procedure. | |||
EP-FC-110-102, STATION PRIORITIES LOG (SPL) PROGRAM GUIDANCE-Provide guidance how to log into the SPL program , enter station priorities into the log, view information and/or print the SPL log. This procedure supersedes EPIP-EOF 23. EP-FC-110-200, DOSE ASSESSMENT-This procedure provides the methods and instructions for performing offsite dose assessment using the Unified RASCAL Interface (URI) by the dose assessors in the Control Room, Technical Support Center (TSC) and Emergency Operation Facility (EOF) This procedure supersedes EPIP-EOF-6 EP-FC-110-201 ON-SHIFT DOSE ASSESSMENT-This procedure provides the On Shift Dose Assessors instructions for performing offsite dose assessment using the Unified RASCAL Interface (URI). This procedure did not supersede any FCS Procedure. | |||
EP-FC-110-302, CORE DAMAGE ASSESSEMENT (PWR)-This procedure provides methods for trending Reactor Coolant System (RCS) volume above the active core during Loss of Coolant Accidents (LOCA), methods for estimating the time to core uncovery, and performing core damage assessments. | |||
This procedure supersedes EPIP-TSC-8. | |||
EP-FC-110-200-F-01, DOSE ASSESSMENT INPUT FORM-New form to provide method to capture data used in dose assessment. | |||
EP-FC-110-201-F-01, ON-SHIFT DOSE ASSESSMENT INPUT FORM-New form to provide method to capture data used in dose assessment. | |||
Summary of Procedures for this Change: Summary of Changes Page 2 of 26 EP-FC-111, EMERGENCY CLASSIFICATION AND PROTECTIVE ACTION RECOMMENDATIONS | |||
-New base procedure that provides guidance for classification of emergencies, provides guideline for determining Protective Action Recommendations (PARs), and provides guidance for event termination and entry into recovery. | |||
Definitions and responsibilities are also defined in the procedure. | |||
This procedure supersedes EPIP-EOF-7 and general definitions and responsibilities previously defined in EPIP-OSC-1 (Remaining portions of EPIP-OSC-1 are superseded by EP-FC-1001 Addendum 3). EP-FC-111-F-01, TERMINATION I RECOVERY CHECKLIST | |||
-New checklist that provides guidance on termination and recovery considerations prior to event termination and entry into recovery. | |||
This procedure supersedes EPIP-EOF-19. | |||
EP-FC-111-AD-F-02, FORT CALHOUN PAR FLOWCHART-Clerical change. Change AG1 to RG1 on page 1 of the flowchart to align with revision 6 of the EAL's approved for issue by the NRG. | |||
Summary of Procedures being assessed for this Change: Summary of Changes Page 3 of 26 EP-FC-112 EMERGENCY RESPONSE ORGANIZATION (ERO) EMERGENCY RESPONSE FACILITY (ERF) ACTIVATION AND OPERATION-New procedure that describes the activation and operation of the ERO and ERF and outlines their responsibilities. | |||
This procedure supersedes Sections 1-4, and Attachments 6.1 to 6.3 of EPIP-OSC-2 EP-FC-112-F-01 COMMAND AND CONTROL TURNOVER BRIEFING FORM-A checklist for capturing required data for turnover between Command and Control positions. | |||
This checklist supersedes Attachment 6.7 of EPIP-OSC-2 EP-FC-112-F-02 Facility Briefing Checklist-Provides standardized method for briefing an Emergency Facility on status of an event. This checklist supersedes FC-EPF-36. | |||
EP-FC-112-F-05 DOSE ASSESSMENT TURNOVER FORM-This new checklist provides a formal means to document turnover items for individuals performing Dose Assessment. | |||
This checklist did not supersede any FCS Procedure EP-FC-112-F-06 INFORMATION REQUEST-MESSAGE SHEET-Provides a formalized method for tracking information requests. | |||
This checklist did not supersede any FCS Procedure. | |||
EP-FC-112-F-07 TSC FIELD MONITORING TEAM BRIEFING TRANSFER CHECKLIST-Provides a formal means for conducting a briefing prior to transfer of control of field teams. This checklist did not supersede any FCS Procedure. | |||
EP-FC-112-F-08 is the ERO position log referenced with integrated procedures and will be issued with the EP-FC-112-700 Series, Alternative Facility Operation. | |||
This is a new logs and provides a tool for ERO members to documents important emergency information. | |||
This log maintains the same purpose as the FC-EPF-13, Emergency Response Organization Log Sheet, and will eventually replace it when the Exelon Summary of Changes Page 4 of 26 integration process is complete. | |||
The creation of this log is in no way reduces the effectiveness of the emergency plan implementing procedures already in place. EP-FC-112-F-09 EMERGENCY PUBLIC ADDRESS ANNOUNCEMENTS-New checklist for specifying specific announcements to be made at FCS during Emergencies. | |||
This checklist supersedes Attachments 6.4 and 6.5 of EPIP-OSC-2 EP-FC-112-F-11 EOF STAFFING REQUEST FORM-New form to formalize staffing requests. | |||
This checklist did not supersede any FCS Procedure. | |||
EP-FC-112-F-12 | |||
-STAFFING REQUEST TRACKING FORM-New form to track requests for additional staffing at an Emergency Response Facility. | |||
This checklist did not supersede any FCS Procedure. | |||
EP-FC-112-AD-F-01 | |||
-Operations Liaison Out of Service Equipment List-New form that replaces FC-EPF-37 in its entirety. | |||
Change to procedure number only. This procedure supersedes FC-EPF-37 EP-FC-112-1000 | |||
-CATASTROPHIC FLOODING PREPARATIONS-New procedure that replaces EPIP-TSC-2, Catastrophic Flooding Preparations. | |||
EPIP-TSC-2 was brought over in its entirety with the exception of the procedure number. This procedure supersedes EPIP-TSC-2 Summary of Procedures being assessed for this Change: Summary of Changes Page 5 of 26 FC-EPF-12 | |||
-JIC 24-Hour Staffing Schedule -JIG Staffing schedule is incorporated in the OPPD Crisis Communication Plan therefore FC-EPF-12 is being deleted. FC-EPF-19, PROCESS AND AREA MONITOR LOCATIONS -This form is an aid that lists process and area monitor locations. | |||
The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid FC-EPF-20, SITE BOUNDARY/OWNER CONTROL AREA -This form is an aid that provides a map of the site boundary/owner control area. The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid FC-EPF-21, FORT CALHOUN STATION SECTOR MAP -This form is an aid that provides a map of sectors. The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid FC-EPF-32, AREA MONITOR TRENDING -This form is an aid that provides a location for trending area monitors. | |||
The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid FC-EPF-33A, ERFCS FUNCTION KEY MAPPING -This form is an aid providing ERFCS Function Key Mapping. 01-ERFCS-1 is the procedure that governs this process and is still in effect. The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid FC-EPF-35, IOWA EOC ROUTE MAP -This form is an aid that provides a map to the State of Iowa EOG. The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid Summary of Changes Page 6 of 26 FC-EPF-44, Process Radiation Monitor Power Supplies -This form is an aid that lists process radiation monitor Power supplies. | |||
The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid FC-EPF-48, Employee Information Telephone Line Instructions | |||
-This form provides and aid for ERO personnel to contact Human Resources to update the OPPD Employee Information Line. The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid Summary of Procedures for this Change: Summary of Changes Page 7 of 26 EP-FC-112-100, CONTROL ROOM OPERATIONS. | |||
New procedure; This procedure provides a base for an Emergency Response in the Control room, to include position responsibilities, overall initial Command & Control, Notification and Augmentation, and Dose Assessment. | |||
This procedure superseded the notification portions of EPIP-OSC-2 Attachment 6.1 , 6.2, & 6.3. EP-FC-112-1 OO-F-01, COMMAND AND CONTROL. This new procedure provides guidance to documents required for the initial, ongoing, and termination/recovery stages of an Emergency Response, to include; Notification and Augmentation, NRG Notification, On-Shift Dose Assessment, Emergency Exposure, Potassium Iodide (Kl) authorization, and Transfer of Command and Control. This procedure superseded the notification portions of EPIP-OSC-2 Attachment 6.1 , 6.2, & 6.3. EP-FC-112-100-F-02, SHIFT DOSE ASSESSOR CHECKLIST. | |||
This new procedure is an enhancement which provides formal method for position specific actions and references documents needed for performing Dose Assessment. | |||
EP-FC-112-100-F-03, OPERATIONS LIAISON (CR) CHECKLIST. | |||
Specific actions from previous procedure EPIP-RR-19A Operations Liaison Position, have been incorporated any wording changes do not alter the intent and are editorial or enhancing. | |||
Commitment AR 11390 has been carried over. EP-FC-112-100-F-04, CR DOSE ASSESSMENT SPECIALIST CHECKLIST. | |||
This new procedure is an enhancement which provides formal method for position specific actions and references documents needed for performing Dose Assessment. | |||
EP-FC-112-100-F-05, SHIFT COMMUNICATOR (CR) CHECKLIST. | |||
This new procedure is an enhancement which provides a method for the communicator to document and track information and references appropriate documents for Offsite communications. | |||
EP-FC-112-100-F-06, ERO NOTIFICATION OR AUGMENTATION. | |||
This new procedure supersedes Attachments 4, 5, 6, 9, 10, 11, 12, 13, & 15 of EPIP-OSC-15, Communicator Actions and provides method for the communicator to document and track information and references appropriate documents for Notification or Augmentation communications. | |||
Commitment | |||
[AR 13301] is carried over. | |||
Summary of Changes Page 8 of 26 EP-FC-112-100-F-07, HABITIBILITY technician Checklist (AR 11809). | |||
New form provides formal method for position specific actions and references documents needed for performing Habitability Technician actions. EP-FC-112-1 OO-AD-F-01, CRITICAL PARAMETER CHECKLIST. | |||
Specific actions from FC-EPF-49 were carried over fully intact. Editorial change due to the numeric title change only. | |||
Summary of Procedures for this Change: Summary of Changes Page 9 of 26 EP-FC-112-200, TSC ACTIVATION AND OPERATION. | |||
New procedure; This procedure provides a base for an Emergency Response in TSC, to include position activities responsibilities in the TSC, overall initial Command & Control, Reactor Safety, Logistics, Dose Assessment, and Security. | |||
EP-FC-112-200-F-01, TSC Site Director Checklist. | |||
This new procedure provides guidance to documents required for the initial, ongoing, and termination/recovery stages of an Emergency Response, to include; Notification and Augmentation, NRC Notification, On-Shift Dose Assessment, Emergency Exposure, Potassium Iodide (Kl) authorization, and Transfer of Command and Control. This procedure superseded the notification portions of EPIP-OSC-2 Attachment 6.1 , 6.2, & 6.3. EP-FC-112-200-F-02, TSC DIRECTOR CHECKLIST. This new procedure is designed to assist the TSC Director in activating the TSC, with ERO Position Log, with Off-Site notifications, priorities, release determination, PA announcements, accountability, and termination and recovery. | |||
This procedure supersedes EPIP-RR-11 and attachments 1, 2, 3, and 4 of EPIP-TSC-1 EP-FC-112-200-F-03, LOGISTICS COORDINATOR CHECKLIST. | |||
This new procedure provides definition and overall description of the Emergency Response Organization. Specific actions from previous procedure have been incorporated any wording changes do not alter the intent and are editorial or enhancing. | |||
This procedure supersedes EPIP-RR-17 A. EP-FC-112-200-F-04, SECURITY COORDINATOR CHECKLIST. This procedure provides definitions and overall descriptions of the Emergency Response Organization. | |||
Specific actions from previous procedure have been incorporated any wording changes do not alter the intent and are editorial or enhancing. | |||
This procedure supersedes EPIP-RR-17. | |||
EP-FC-112-200-F-05, STATE LOCAL COMMUNICATOR CHECKLIST. New checklist provides method for communicator to document and track information and references appropriate documents for Offsite communications. | |||
Summary of Changes Page 10 of 26 EP-FC-112-200-F-08, TSC OPS Liaison Checklist. | |||
Specific actions from previous procedure have been incorporated any wording changes do not alter the intent and are editorial or enhancing. | |||
This procedure supersedes EPIP-RR-19A. | |||
EP-FC-112-200-F-09, REACTOR SAFETY COORDINATOR. | |||
This new procedure ensures supervision and replacement part evaluation of Technical Support Group activities based on station priorities established by the Emergency Director. | |||
Specific actions from previous procedure have been incorporated any wording changes do not alter the intent and are editorial or enhancing. | |||
This procedure supersedes EPIP-RR-13. | |||
EP-FC-112-200-F-11, REACTOR ENGINEER CHECKLIST. | |||
This new checklist is an enhancement, new checklist provides Reactor Engineer information not previously available and provides a chronological order for initial, on-going, and closeout position expectations. | |||
EP-FC-112-200-F-14, Protective Measure Coordinator Checklist | |||
.. All portions of EPIP-RR-22 are incorporated , any wording changes do not alter the intent and are editorial or enhancing. | |||
This procedure supersedes EPIP-RR-22. | |||
EP-FC-112-200-F-17, CHP COMMUNICATOR (TSC) CHECKLIST. | |||
Specific actions from previous procedure have been incorporated any wording changes do not alter the intent and are editorial or enhancing. | |||
This procedure supersedes EPl-RR-90. | |||
EP-FC-112-200-F-19, EMERGENCY SPECIAL PROCEDURE FORM. Enhancement for Command and Control, new form documents special required purpose, prerequisites, precautions, required equipment and procedural steps for emergencies up to and including invoking 1 OCFR50.54(X)/(Y). | |||
EP-FC-112-200-F-23, SHIFT ASSIGNMENT GUIDANCE. | |||
This new document assists the Admin Logistics Coordinator (TSC)/Manager (EOF), in an extended event, staff the ERO. This document is new and is an enhancement. | |||
Summary of Changes Page 11 of 26 EP-FC-112-200-F-24, SHIFT ASSIGNMENT WORKSHEET | |||
.. This new document assists the Admin Logistics Coordinator, in an extended event, staff the TSC. This document is new and is an enhancement. | |||
EP-FC-112-200-F-25, CHP COMMUNICATOR WORKSHEET. | |||
This new document assists the CHP Communicator, in documenting In-Plant Radiological Data and Environmental Data. This document is new and is an enhancement. | |||
EP-FC-112-200-F-26, Health Physics Networks. | |||
-New checklist that provides the TSC CHP Communicator guidance on initial, ongoing, and closeout actions. The checklist also directs the TSC CHP Communicator to other procedures and process that may be required during an emergency situation. | |||
EP-FC-112-200-F-28, Primary Systems Engineer Checklist. | |||
Enhancement, this information was not previously available to the Primary System Engineer. | |||
This new checklist provides a chronological order for initial, on-going, and closeout position expectations. | |||
EP-FC-112-200-F-29, ELECTRICAL l&C SYSTEMS ENGINEER CHECKLIST. | |||
Enhancement, this information was not previously available to the Electrical l&C System Engineer. | |||
This checklist provides a chronological order for initial, on-going, and closeout position expectations. | |||
EP-FC-112-200-F-30, SECONDARY SYSTEMS ENGINEER CHECKLIST. Enhancement, this information was not previously available to the Secondary System Engineer. | |||
This checklist provides a chronological order for initial, on-going, and closeout position expectations. | |||
EP-FC-112-200-F-31, TSC SECURITY COORDINATOR HOSTILE ACTION EVENT CHECKLIST. | |||
Enhancement, this information was not available in the TSC for post event staffing, or if the Security Coordinator is located in the TSC during an actual Hostile Action Event (H1 Series). This checklist provides a chronological order for initial, on-going, and closeout position expectations. | |||
EP-FC-112-200-F-40, SECURITY DATA SHEET. This new data sheet is an enhancement to the Security Coordinator, in providing quick pertinent information during H1 Series classifications. | |||
Summary of Changes Page 12 of 26 EP-FC-112-200-F-41, SECURITY SUPPLAMENTAL SUPPORT WORKSHEET. | |||
This is a new worksheet that quickly helps the Security Coordinator identify contacted LLEA, during H1 Series classifications. | |||
EP-FC-112-200-AD-F-020, FCS TSC VENTILATION LINEUP. This information has been relocated from EPIP-TSC-1 attachments 3 & 4. AR 30816, LIC-01-0109 is ongoing, the only change to attachments 3&4 is the title. EP-FC-112-200-AD-01, CR-TSC 24 Hour Staffing Schedule. | |||
This form supersedes FC-EPF-10, the information was transferred in whole with only a title change. | |||
Summary of Procedures being assessed for this Change: Summary of Changes Page 13 of 26 EP-FC-112-300, Rev 0, OPERATIONS SUPPORT CENTER ACTIVATION AND OPERATION-This procedure provides an overview of the Operations Support Center (OSC) activities associated with an emergency condition. | |||
This procedure did not supersede any FCS Procedure. | |||
EP-FC-112-300-AD-F-01, Rev 0, FORT CALHOUN OSC SUGGESTED CONFIGURATION-This procedure provides a checklist to activate the OSC as well as the physical layout of the facility. | |||
This procedure supersedes EPIP-OSC-21 , except Attachment 4, Checklist for Deactivation of OSC, which can be found in the 115 Series. EP-FC-112-300-AD-F-02, Rev 0, OSC 24-HOUR STAFFING SCHEDULE-This procedure is a cut and paste of FC-EPF-9 and tracks OSC staffing by position and shift. This procedure supersedes FC-EPF-9 EP-FC-112-300-F-01, Rev 0, OSC DIRECTOR CHECKLIST-This procedure provides guidance to the OSC Director and incorporates facility activation actions found in OSC-21 as well as OSC Director Actions in EPIP-RR-21. | |||
This procedure supersedes EPIP-RR-21 and Attachment 1 of EPIP-OSC-21 EP-FC-112-300-F-02, Rev 0, Maintenance Coordinator CHECKLIST-This procedure provides guidance to the OSC Maintenance Coordinator. | |||
This procedure supersedes EPIP-RR-21A. | |||
EP-FC-112-300-F-03, Rev 0, OSC Coordinators CHECKLIST-This procedure incorporates the tasks of the RP Coordinator and Chemistry Coordinator and includes actions team briefings and for evacuation/relocation. | |||
This procedure supersedes EPIP-RR-22A, EPIP-RR-87 and EPIP-OSC-9 EP-FC-112-300-F-04, Rev 0, OSC MEDICAL COORDINATOR-This procedure provides guidance to the OSC Medical Coordinator. This procedure supersedes EPIP-RR-39. | |||
Summary of Changes Page 14 of 26 EP-FC-112-300-F-07, Rev 0, OSC Dosimetry Technician Checklist-This procedure provides instruction and guidance to the OSC Dosimetry Technician. | |||
This procedure supersedes EPIP-RR-28A. | |||
EP-FC-112-300-F-08, Rev 0, DOSIMETRY ISSUE TO EMERGENCY RESPONSE PERSONNEL-This procedure documents dosimetry issue device information and recipient information. | |||
This procedure supersedes FC-EPF-51 EP-FC-112-300-F-09, Rev 0, Airborne Activity Log -This is a new form which documents exposure information for personnel, as well as documentation of airborne sampling. | |||
This does not supersede any procedure EP-FC-112-300-F-10, Rev 0, OPERATIONS LIAISON (OSC) CHECKLIST-This procedure provides guidance for the OSC Operations Liaison. This procedure supersedes EPIP-RR-19a, Attachment 6.4 -OSC Operations Liaison Checklist EP-FC-112-300-F-014, Rev 0, OSC TEAM BRIEFING -DEBRIEFING FORM -This procedure provides guidance to the Command and Control position or designees for briefing and dispatching emergency teams into potentially radioactive areas. This procedure supersedes EPIP-OSC-9. | |||
EP-FC-112-300-F-016, Rev 0, OSC STAFF GUIDELINES-This procedure provides guidance on the formation of emergency teams. This procedure supersedes steps 6.1.1, 6.1.2 and 6.1.6 of EPIP-OSC-9 EPIP-RR-28 OSC ACCOUNTABILITY CLERK ACTIONS will be superseded and will be added as an USER AID. | |||
Summary of Procedures for this Change: Summary of Changes Page 15 of 26 EP-FC-112-400, EMERGENCY OPERATIONS FACILITY OPERATION | |||
-New base procedure that describes EOF activities and responsibilities associated with an emergency. | |||
This is a new procedure. | |||
EP-FC-112-400-F-03, EOF DIRECTOR CHECKLIST-New checklist that provides the Emergency Director guidance on initial, ongoing, situational, and closeout actions. The checklist also directs the EOF Emergency Director to other procedures and process that may be required during an emergency situation. | |||
This procedure supersedes EPIP-OSC-2 Attachment 6.3 EP-FC-112-400-F-04, EOF ADMINISTRATIVE LOGISTICS MANAGER New checklist that provides the EOF Administrative Logistics Manager guidance on initial, ongoing, situational, and closeout actions. The checklist also directs the EOF Administrative Logistics Manager to other procedures and process that may be required during an emergency situation. | |||
This procedure supersedes EPIP-RR-29 EP-FC-112-400-F-05, EOF COP COMMUNICATOR CHECKLIST | |||
-New checklist that provides the EOF COP Communicator guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF COP Communicator to other procedures and process that may be required during an emergency situation. | |||
This procedure supersedes EPIP-OSC-15 Attachment 3 EP-FC-112-400-F-07, CLERICAL ASSIST ANT (EOF) CHECKLIST | |||
-New checklist that provides the EOF Clerical Assistant with guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF Clerical Assistant to other process that may be required during an emergency situation. | |||
This is a new checklist EP-FC-112-400-F-08, CLERICAL ASSISTANT (EOF) CHECKLIST-New checklist that provides the EOF IT Specialist with guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF IT specialist to other procedures and process that may be required during an emergency situation. | |||
This is a new checklist Summary of Changes Page 16 of 26 EP-FC-112-400-F-09, EOF OPERATIONS LIAISON CHECKLIST | |||
-New checklist that provides the EOF Operations Liaison guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF Operation Liaison to other procedures and process that may be required during an emergency situation. | |||
This procedure supersedes EPIP-RR-19A EP-FC-112-400-F-16, PROTECTIVE MEASURES MANAGER CHECKLIST | |||
-New checklist that provides the EOF Protective Measures Manager guidance on initial, ongoing, situational, and closeout actions. The checklist also directs the EOF Protective measures Manager to other procedures and process that may be required during an emergency situation. | |||
This procedure supersedes EPIP-RR-22 EP-FC-112-400-F-17, DOSE ASSESSMENT COORDINATOR CHECKLIST | |||
-New checklist that provides the EOF Dose Assessment Coordinator guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF Dose Assessment Coordinator to other procedures and process that may be required during an emergency situation. | |||
This procedure supersedes EPIP-RR-25 EP-FC-112-400-F-18, EOF DOSE ASSESSMENT SPECIALIST CHECKLIST | |||
-New checklist that provides the EOF Dose Assessment Specialist guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF Dose Assessment Specialist to other procedures and process that may be required during an emergency situation. | |||
This is a new checklist EP-FC-112-400-F-19, CHP COMMUNICATOR CHECKLIST | |||
-New checklist that provides the EOF CHP Communicator guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF CHP Communicator to other procedures and process that may be required during an emergency situation. | |||
This procedure supersedes EPIP-RR-90 Summary of Changes Page 17 of 26 EP-FC-112-400-F-21, EOF FIELD TEAM SPECILIST CHECKLIST | |||
-New checklist that provides the EOF Field Team Specialist guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF Field Team Specialist to other procedures and process that may be required during an emergency situation. | |||
This procedure supersedes EPIP-RR-72 EP-FC-112-400-F-28, EOF ACTIVATION | |||
-New title for former procedure EPIP-EOF-1 , Activation of the Emergency Operation Facility. | |||
No changes to the process, only numbering and formatting changes. This procedure supersedes EPIP-EOF-1 EP-FC-112-400-F-30, EOF LOSS OF NORMAL ELECTRIC POWER-New procedure that provides guidance on loss of power to the EOF. This is a new procedure EP-FC-112-400-F-32, LIST OF COMMONLY ASKED QUESTIONS AT EOCS -New procedure that provides ERO personnel a list of questions commonly asked at EOCs so they are better prepared to answer questions. | |||
This is a new procedure EP-FC-112-400-F-39, EOF STAFFING -New title for former procedure FC-EPF-11 , EOF 24 Hour Staffing Schedule. | |||
No changes to the process, only numbering and formatting changes. This procedure supersedes FC-EPF-11 EP-FC-112-400-F-42, METOROLOGICAL FORCAST WORKSHEET | |||
-New worksheet that provides ERO personnel a method for capturing meteorological data. This is a new worksheet EP-FC-112-400-F-91, EOF EMERGENCY RESPONSE COORDINATOR CHECKLIST | |||
-New checklist that provides the EOF Emergency Response Coordinator with guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF Emergency Response Coordinator to other procedures and process that may be required during an emergency situation. | |||
This procedure supersedes EPIP-RR-91 Summary of Changes Page 18 of 26 EP-FC-112-400-AD-F-06, WESTINGHOUSE EMERGENCY INFORMATION New title for former procedure EPIP-RR-29 Attachment 1, Westinghouse Electric Emergency Information Sheet. No changes to the process, only numbering and formatting changes. This procedure supersedes EPIP-RR-29 Attachment 1 EP-FC-112-400-AD-F-07, INPO EVENT NOTIFICATION | |||
-New title for former procedure EPIP-RR-29 Attachment 2, INPO Event Notification sheet. No changes to the process, only numbering and formatting changes. This procedure supersedes EPIP-RR-29 Attachment 2 EP-FC-112-400-AD-F-08, OPPD EMPLOYEE HOTLINE MESSAGE -New title for former procedure EPIP-RR-29 Attachment 3, OPPD Employee Hotline Message. No changes to the process, only numbering and formatting changes. This procedure supersedes EPIP-RR-29 Attachment 3 EPIP-RR-63, EOF DOSE ASSESSMANT ASSISTANT ACTIONS -This procedure was turned into an Emergency User Aid due to position not implementing any parts of the Fort Calhoun Emergency Plan. Dose Assessment Assistants provide supporting roles only. Turned into Emergency User Aid EPIP-RR-66, COMMUNICATIONS SPECILISTS ACTIONS -This procedure was turned into an Emergency User Aid due to position not implementing any parts of the Fort Calhoun Emergency Plan. Communications Specialists provide supporting roles only and are essentially preforming their normal daily roles in support of the ERO. Turned into Emergency User Aid EPIP-RR-98, EOF SECURITY OFFICER ACTIONS -This procedure was turned into an Emergency User Aid due to position not implementing any parts of the Fort Calhoun Emergency Plan. EOF Security Officers provide supporting roles only control access in and out of the EOF. Turned into Emergency User Aid Summary of Procedures being assessed for this Change: Summary of Changes Page 19 of 26 EP-FC-112-500 EMERGENCY ENVIRONMENT AL MONITORING-This procedure describes the responsibilities and actions for the coordination of FCS Nuclear Field Monitoring Teams, including the tracking of a radiological release plume. This document supersedes EPIP-EOF-3 EP-FC-112-500-F-01, Field Monitoring Team Checklist-Provides direction and place keeping for actions taken by Field Monitoring Teams during implementation of the FCS Emergency Plan. This document supersedes attachment 1 and 3 of EPIP-EOF-3 EP-FC-112-500-F-02, Protective Equipment and Personnel Dosimetry-This form provides guidance to the Protective Measures with respect to the wearing of protective clothing by Field Monitoring Teams and to specify the dosimetry requirements for those teams. This document supersedes attachment 3 of EPIP-EOF-11. EP-FC-112-500-F-03, Field Survey Data Sheet-New form for documenting radiation survey performed during plume tracking and evaluation. | |||
This document supersedes attachment 3 of EPIP-EOF-3 and radiation survey sampling section of FC-EPF-02. | |||
EP-FC-112-500-F-04, Offsite Airborne Monitoring Log-New form for documenting airborne monitoring performed during plume tracking and evaluation. | |||
This document supersedes airborne sampling section of FC-EPF-02 EP-FC-112-500-F-06, Transfer of Shipment of Radiological Samples to Radiological Laboratories.-This form describes the methods to be used to transfer or ship environmental samples to an analysis laboratory. | |||
This procedure did not supersede any FCS Procedure. | |||
EP-FC-112-500-F-10, Field Monitoring Team Dispatch Log-New document for briefing and dispatching field monitoring teams. | |||
This procedure did not supersede any FCS Procedure. | |||
Summary of Changes Page 20 of 26 EP-FC-112-500-F-11, Field Monitoring Team Turnover Checklist-New document for performing turnover between field monitoring teams. This procedure did not supersede any FCS Procedure. | |||
EP-FC-112-500-F-60, FIELD MONITORING TEAM INSTRUMENT OPERATION-New document that provides instruction on operation of instruments for Field Monitoring Teams. This procedure supersedes attachments 4, 5 and 6 from EPIP-EOF-3 Summary of Procedures being assessed for this Change: Summary of Changes Page 21of26 EP-FC-113, PERSONNEL PROTECTIVE ACTIONS -This procedure provides the necessary guidance used in determining onsite personnel protective actions during an event to include assembly, accountability and evacuation; habitability; emergency exposure limits; and Kl assessment. | |||
This procedure supersedes EPIP-EOF-21 in its entirety. | |||
The Kl Authorization flowchart has been turned into a user aid. EP-FC-113-AD-F-01, HABITABILITY WORKSHEET-This is a cut and paste of EPF-50 This procedure supersedes FC-EPF-50 EP-FC-113-AD-F-02, ESTIMATED EXPOSURE LOG -This is a cut and paste of EPF-7 This procedure supersedes FC-EPF-7 EP-FC-113-F-01, ON-SITE HABITABILITY CHECKLIST This procedure did not supersede any FCS Procedure. | |||
EP-FC-113-F-02, AUTHORIZATION FOR EMERGENCY EXPOSURE-This is a cut and paste of FC-EPF-5. | |||
This procedure supersedes FC-EPF-5 EP-FC-113-F-03, THYROID BLOCKING AGENT AUTHORIZATION -This is a new form This procedure did not supersede any FCS Procedure. | |||
EP-FC-113-F-04, ADMINISTRATION OF POTASSIUM IODIDE TABLETS-This is a cut and paste of FC-EPF-3. | |||
This procedure supersedes FC-EPF-3 Summary of Changes Page 22 of 26 EP-FC-113-F-05, VEHICLE AND EVACUEE CONTROL GROUP LEADER CHECKLIST-This is a new form This procedure did not supersede any FCS Procedure. | |||
EP-FC-113-F-06, VEHICLE AND EVACUEE CONTROL GROUP MEMBER CHECKLIST-This is a new form This procedure did not supersede any FCS Procedure. | |||
EP-FC-113-F-07, SITE ASSEMBLY, ACCOUNTABILITY AND EVACUATION-This is a new form This procedure did not supersede any FCS Procedure. | |||
EP-FC-113-F-11, REMOTE AREA MUSTER LIST-This is a new form This procedure did not supersede any FCS Procedure. | |||
EP-FC-113-F-12, VEHICLE SURVEYAND DECONTAMINATION REPORT-This procedure incorporates Step 5.2 of EPIP-EOF-25 which discusses personnel processing their vehicle through the vehicle portal monitor and issuance of a tag for the vehicle; attachment 6.3 of EPIP-EOF-25, vehicle tags, is also included. | |||
This procedure supersedes step 5.2 and attachment 6.3 of EPIP-EOF-25. | |||
EP-FC-113-F-13, FACILITY ACCOUNTABILITY LIST (WITHIN PROTECTED This is a new form This procedure did not supersede any FCS Procedure. | |||
EP-FC-113-F-23, ASSEMBLY AREA ROSTER-This is a new form This procedure did not supersede any FCS Procedure. | |||
EP-FC-113-F-24, RELOCATION CENTER OPERATIONS CHECKLIST-This procedure incorporates the Step 5 PROCEDURE of EPIP-EOF-25 and provides additional guidance on tasks performed at the Relocation Center. This procedure supersedes Step 5 of EPIP-EOF-25 Summary of Changes Page 23 of 26 EP-FC-113-F-25, RELOCATION CENTER ACCOUNTABILITY LOG -This is a new form This procedure did not supersede any FCS Procedure. | |||
EP-FC-113-F-26, RELOCATION CENTER MONITORING LOG-This is a new form This procedure did not supersede any FCS Procedure. | |||
EP-FC-113-F-29, FORT CALHOUN ASSEMBLY, ACCOUNTABILITY AND EVACUATION GUIDELINES -This is a new form This procedure did not supersede any FCS Procedure. | |||
EP-FC-113-F-30, Setup and Operation of the Portal Monitoring at Decontamination Facility-This procedure provides guidance for the setup, function check, calibration, and use of the Pedestrian and Vehicle Portal Monitors. This procedure supersedes EPIP-EOF-25 and EPIP-EOF-26 in their entirety. | |||
EP-FC-113-F-31, Warehouse Personnel Decontamination Station This procedure provides instruction for activating and operating the Warehouse Personnel Decontamination Station. This procedure supersedes EPIP-EOF-10 in its entirety. | |||
The process used to document exposure to Emergency Responders is governed by RP-AA-210-1001. | |||
This process supersedes FC-1189, DOSIMETRY ISSUE TO EMERGENCY RESPONSE PERSONNEL. | |||
Summary of Procedures for this Change: Summary of Changes Page 24 of 26 EP-FC-114, NOTIFICATIONS | |||
-New procedure that provides a base for making various notifications directed from sub procedures and forms within the EP-FC-114 Series. The procedure includes notification terms and definitions, responsibilities, requirements, and instructions for completing and transmitting NRC Event Notification Worksheets. | |||
This procedure superseded the notification portions of EPIP-OSC-2 Attachment 6.1 , 6.2, & 6.3. EP-FC-114-100, OFF-SITE NOTIFICATION | |||
-New procedure that provides guidance on how to complete prompt and accurate notifications to the local states and counties using the Event Notification Form (EP-FC-114-100-F-01). | |||
This procedure supersedes elements of EPIP-OSC-2 Attachments 6.1 , 6.2 & 6.3 while providing greater detail on how to complete the event notification form. EP-FC-114-1 OO-F-01, FORT CALHOUN STATION -STATE/LOCAL EVENT NOTIFICATION FORM-This procedure provides a format to communicate required emergency information to the affected state and counties during an emergency. | |||
Formatting of this form was preapproved by the affected states and counties and the regulatory required information remains part of the form. This procedure supersedes FC-1188 EP-FC-114-100-F NOTIFICATION/UPDATE OF STATES AND COUNTIES This procedure provides guidance on how to contact the states and counties via normal and backup methods with event notification form information. | |||
This procedure supersedes EPIP-OSC-15 Attachment | |||
: 7. EP-FC-114-1 OO-F-03 -ACCELERATED VERBAL NRC NOTIFICATION This form replaces FC-EPF-45 and is a procedure numbering change only as the form was brought over in its entirety. | |||
This procedure supersedes FC-EPF-45. | |||
EP-FC-114-F-01, RELEASE IN PROGRESS DETERMINATION GUIDANCE-This is a new procedure that enhances the stations ability to determine if a release is in progress based on the emergency event. New Procedure. | |||
Summary of Changes Page 25 of 26 EP-FC-114-AD-F-03, EOF BACKUP ALERT NOTIFICATION SYSTEM ACTIVATION | |||
-This procedure provides guidance on how to sounds the sirens in the event the states and counties specifically request FCS to complete siren system activation. | |||
This procedure supersedes EPIP-EOF-24 Summary of Procedures for this Change: Summary of Changes Page 26 of 26 EP-FC-115, TERMINATION AND RECOVERY -New procedure that provides guidance and instruction for transition to the recovery phase of an event. Terms, definitions and responsibilities are also defined in the procedure. | |||
The procedure walks the command and control positon through transitioning out of a declared event, termination directly form a declared event, preparations to enter recovery, entering recovery, recovery phase actions, and termination from recovery. | |||
This procedures expands on the instructions formally provided in EPIP-EOF-19. This procedure supersedes EPIP-EOF-19 EP-FC-115-F-01, ISSUES I STRATEGIES FORM -This is a new form that was developed for use in the termination and recovery process. The issues and strategies form provides decision makers a strong format for documenting and describing issues and the resources needed to complete recovery tasks. This is a new form. | |||
Summary of Changes, EP-FC-1001 Addendum 3 Rev 1 This change to Addendum 3 is occurring for 4 main reasons: 1. To implement the revised EAL scheme based on NEI 99-01 Rev 6 submitted to the NRC in License Amendment Request (LAR) dated December 26, 2014. The NRC approved the License Amendment Request in a Safety Evaluation Report dated December 15, 2015. The revised EAL scheme was trained on by the Fort Calhoun Station and Corporate personnel during the 1st and 2nct QTR of 2016. The NRC approved EAL scheme based on NEI 99-01 Rev 6 is being implemented as EP-FC-1001 Addendum 3 Revision 1. 2. The EAL scheme originally submitted and approved referenced Appendix R of 1 OCFR50 as the basis for station fire protection and response. | |||
Fort Calhoun fire protection is based on the requirements of NFPA 805. The basis for EAL HU3, FIRE potentially degrading the level of safety of the plant, has been modified to reflect this difference. | |||
: 3. The EAL scheme originally submitted used the currently installed plant seismic instrumentation as the primary indication for declaration of a seismic event. Upon review, it was determined that this indication is not consistent with the stations defined levels for an Operating Basis Earthquake (QBE). EAL HU4, Seismic event greater than QBE levels, has been modified to align with standard industry symptoms for an QBE not based on available instrumentation. | |||
: 4. Some minor administrative and formatting discrepancies were identified during training conducted with emergency directors and licensed operators. | |||
These discrepancies have been corrected.}} |
Latest revision as of 13:23, 16 March 2019
ML16197A558 | |
Person / Time | |
---|---|
Site: | Fort Calhoun |
Issue date: | 07/15/2016 |
From: | Marik S M Omaha Public Power District |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
LIC-16-0057 | |
Download: ML16197A558 (50) | |
Text
Omaha Public Power District July 15, 2016 LIC-16-0057 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285
SUBJECT:
Emergency Planning Changes 10 CFR 50.54(q) 10 CFR 50.4(b) In accordance with 10 CFR 50.54(q), the Omaha Public Power District submits a report of each such change made including a summary of its analysis.
This change was reviewed and does not constitute a reduction in effectiveness.
No commitments are made in this letter. If you have any questions regarding the enclosed changes , please contact Mr. Eric Plautz at 402-533-7308. 1;L9V/) Shane M. Marik Site Vice President and CNO SMM/mec Enclosure c: M. L. Dapas, NRC Regional Administrator, Region IV C.F. Lyon, NRC Project Manager S. M. Schneider, NRC Senior Resident Inspector Fort Calhoun Station, PO Box 550 Fort Calhoun, NE 68023/9610 Power Lane, Blair, NE 68008 EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 1 of 3 Rev. 9 Radiological Emergency Emergency Plan Emergency Planning Forms D D Implementing Procedures Response Plan (RERP) (EPIP) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION FC-EPF-10 REV 23 ISSUED 4-15-14 FC-EPF-42REV11ISSUED3-1-16 FC-EPF-11 REV 14 ISSUED 4-15-14 FC-EPF-12 REV 6 ISSUED 7-13-10 FC-EPF-13REV1 ISSUED 3-31-04 FC-EPF-19 REV 11 ISSUED 6-25-08 FC-EPF-2 REV 6 ISSUED 3-20-12 FC-EPF-20 REV 3 ISSUED 12-14-04 FC-EPF-21 REV 6 ISSUED 10-29-13 FC-EPF-27 REV 7 ISSUED 12-23-14 FC-EPF-3 REV 3 ISSUED 11-5-09 FC-EPF-31 REV 3 ISSUED 3-31-04 Summary of Changes: Please see the enclosed summary of changes.
Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 2 of 3 Rev. 9 Radiological Emergency Emergency Plan Emergency Planning Forms D D Implementing Procedures
[Z] Response Plan (RERP) (EPIP) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION FC-EPF-32 REV 2 ISSUED 4-26-07 FC-EPF-33A REV 3 ISSUED 2-14-13 FC-EPF-35 REV 0 ISSUED 3-7-00 FC-EPF-36 REV 10 ISSUED 6-11-08 FC-EPF-37 REV 1 ISSUED 3-31-04 FC-EPF-44 REV 0 ISSUED 7-29-04 FC-EPF-45 REV 0 ISSUED 10-4-05 FC-EPF-48 REV 2 ISSUED 5-14-15 FC-EPF-49 REV 1 ISSUED 1-20-09 FC-EPF-5 REV 8 ISSUED 7-27-10 FC-EPF-50 REV 6 ISSUED 10-22-15 FC-EPF-51 REV 1 ISSUED 1-22-15 Summary of Changes: Please see the enclosed summary of changes. Manager -Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 3 of 3 Rev. 9 Radiological Emergency Emergency Plan Emergency Planning Forms D D Implementing Procedures Response Plan (RERP) (EPIP) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION FC-EPF-6REV10 ISSUED 10-22-15 FC-EPF-7 REV 5 ISSUED 10-29-13 FC-EPF-8 REV 14 ISSUED 10-22-15 FC-EPF-9 REV 20 ISSUED 4-15-14 Summary of Changes: Please see the enclosed summary of changes. Manager -Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16th Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 1 of 2 Rev. 9 Radiological Emergency Emergency Plan Emergency Planning Forms D Implementing Procedures D Response Plan (RERP) (EPI P)(EP-FC-110 thru 115) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION RERP REV 19C ISSUED 5-9-13 RERP-APPENDIX A REV 25 ISSUED 6-20-14 RE RP-APPENDIX B REV 5 ISSUED 10-21-08 RERP-APPENDIX C REV 16 ISSUED 11-29-12 RERP-APPENDIX D REV 3 ISSUED 8-11-05 RERP-SECTION A REV 14 ISSUED 5-22-14 RERP-SECTION B REV 32 ISSUED 12-16-14 RERP-SECTION C REV 10 ISSUED 3-3-05 RERP-SECTION D REV 15 ISSUED 8-24-10 RERP-SECTION E REV 30 ISSUED 7-7-15 RERP-SECTION F REV 20 ISSUED 11-24-15 RERP-SECTION G REV 13 ISSUED 5-1-07 Summary of Changes: Please see the enclosed sum ary of charges. Supervifor
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 08/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16th Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient , or has been transferred to another individuals , please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 2 of 2 Rev. 9 Radiological Emergency Emergency Plan Emergency Planning Forms [gJ D Implementing Procedures D Response Plan (RERP) (EPIP)(EP-FC-110 thru 115) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION RERP-SECTION H REV 40 ISSUED 12-4-14 RERP-SECTION I REV 14 ISSUED 6-23-9 RERP-SECTION J REV 24 ISSUED 3-12-15 RERP-SECTION K REV 11A ISSUED 4-30-13 RERP-SECTION L REV 14A ISSUED 5-2-13 RERP-SECTION M REV 15 ISSUED 6-1-05 RERP-SECTION N REV 14A ISSUED 6-15-06 RERP-SECTION 0 REV 14C ISSUED 1-15-13 RERP-SECTION P REV 14 ISSUED 7-7-15 Summary of Changes: Please see the enclosed summary of changes. Supervisor
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 08/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16th Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 1 of 1 3 Rev. 9 D Radiological Emergency
[g] Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115 , 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-110-200-AD-F-03 REV 0 ISSUED 6-16-16 EP-FC-110-200-F-01 REV 0 ISSUED 6-16-16 EP-FC-110-201-F-01 REV 0 ISSUED 6-16-16 EP-FC-111-AD-F-02 REV 1 ISSUED 12-30-14 EP-FC-111-AD-F-02 REV 2 ISSUED 6-16-16 EP-FC-111-F-01 REV 0 ISSUED 6-16-16 EP-FC-113-AD-F-01 REV 0 ISSUED 6-16-16 EP-FC-113-AD-F-02 REV 0 ISSUED 6-16-16 EP-FC-113-F-01REV0 ISSUED 6-16-16 EP-FC-113-F-02 REV 0 ISSUED 6-16-16 EP-FC-113-F-03 REV 0 ISSUED 6-16-16 EP-FC-113-F-04 REV 0 ISSUED 6-16-16 EP-FC-113-F-05 REV 0 ISSUED 6-16-16 EP-FC-113-F-06 REV 0 ISSUED 6-16-16 EP-FC-113-F-07 REV 0 ISSED 6-16-16 Summary of Changes: Please *ee the Superv#or
-Emergency Planning I hereby acknowledge receipt of the above documentS/inforrnation and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient , or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 2 of 13 Rev. 9 D Radiological Emergency
!SJ Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115 , 1001) (EPF) D Emergency Planning Department Manual 0 Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-113-F-11 REVO ISSUED6-16-16 EP-FC-113-F-12 REV 0 ISSUED 6-16-16 EP-FC-113-F-13 REV 0 ISSUED 6-16-16 EP-FC-113-F-23 REV 0 ISSUED 6-16-16 EP-FC-113-F-24 REV 0 ISSUED 6-16-16 EP-FC-113-F-25 REV 0 ISSUED 6-16-16 EP-FC-113-F-26 REV 0 ISSUED 6-16-16 EP-FC-113-F-29 REV 0 ISSUED 6-16-16 EP-FC-113-F-30 REV 0 ISSUED 6-16-16 EP-FC-113-F-31 REV 0 ISSUED 6-16-16 EP-FC-114-1 OO-F-01 REV 0 ISSUED 6-16-16 EP-FC-114-100-F-02 REV 0 ISSUED 6-16-16 EP-FC-114-100-F-03 REV 0 ISSUED 6-16-16 EP-FC-114-AD-F-03 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16'h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient , or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 3 of 1 3 Rev. 9 D Radiological Emergency IX] Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115 , 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-114-F-01 REV 0 ISSUED 6-16-16 EP-FC-115-F-01 REVO ISSUED6-16-16 EP-FC-110 REV 0 ISSUED 6-16-16 EP-FC-110-102 REV 0 ISSUED 6-16-16 EP-FC-110-200 REV 0 ISSUED 6-16-16 EP-FC-110-201 REV 0 ISSUED 6-16-16 EP-FC-110-302 REV 0 ISSUED 6-16-16 EP-FC-111 REV 0 ISSUED 6-16-16 EP-FC-113 REV 0 ISSUED 6-16-16 EP-FC-114 REV 0 ISSUED 6-16-16 EP-FC-114-100 REV 0 ISSUED 6-16-16 EP-FC-115 REV 0 ISSUED 6-16-16 EP-FC-112-100-AD-F-01 REV 0 ISSUED 6-16-16 EP-FC-112-100-F-01REV0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 15th Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 4 of 13 Rev. 9 D Radiological Emergency
[g] Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115, 1001) (EPF) D Emergency Planning Department Manual 0 Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-112-1 OO-F-02 REV 0 ISSUED 06-16-16 EP-FC-112-100-F-03 REV 0 ISSUED 6-16-16 EP-FC-112-100-F-04 REV 0 ISSUED 6-16-16 EP-FC-112-100-F-05 REV 0 ISSUED 6-16-16 EP-FC-112-100-F-06 REV 0 ISSUED 6-16-16 EP-FC-112-1 OO-F-07 REV 0 ISSUED 6-16-16 EP-FC-112-1 OO-F-08 REV 0 ISSUED 6-16-16 EP-FC-112-200-AD-F-01 REV 0 ISSUED 6-16-16 EP-FC-112-200-AD-F-20 REV 0 ISSUED 6-16-16 EP-FC-112-200-F REV 0 ISSUED 6-16-16 EP-FC-112-200-F-02 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-03 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-04 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-05 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 8/1112016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals , please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 5 of 13 Rev. 9 D Radiological Emergency Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115, 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-112-200-F-08 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-09 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-11 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-14 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-17 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-19 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-23 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-24 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-25 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-26 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-28 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-29 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-30 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-31 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station , FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient , or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 6 of 13 Rev. 9 D Radiological Emergency
[g] Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115 , 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-112-200-F-40 REV 0 ISSUED 6-16-16 EP-FC-112-200-F-41 REV 0 ISSUED 6-16-16 EP-FC-112-300-AD-F-01 REV 0 ISSUED 6-16-16 EP-FC-112-300-AD-F-02 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-01 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-02 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-03 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-04 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-07 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-08 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-09 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-10 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-14 REV 0 ISSUED 6-16-16 EP-FC-112-300-F-16 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16'h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient , or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed 0 Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 7 of 13 Rev. 9 D Radiological Emergency
[8J Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115, 1001) (EPF) D Emergency Planning Department Manual 0 Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-112-400-AD-5-06 REV 0 ISSUED 6-16-16 EP-FC-112-400-AD-F-07 REV 0 ISSUED 6-16-16 EP-FC-112-400-AD-F-08 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-03 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-04 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-05 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-07 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-08 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-09 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-16 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-17 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-18 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-19 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-21 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station , FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/Jnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 8of13 Rev. 9 D Radiological Emergency
[8J Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115, 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-112-400-F-28 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-30 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-32 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-39 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-42 REV 0 ISSUED 6-16-16 EP-FC-112-400-F-91 REVO ISSUED6-16-16 EP-FC-112-500-F-01 REV 0 ISSUED 6-16-16 EP-FC-112-500-F-02 REV 0 ISSUED 6-16-16 EP-FC-112-500-F-03 REV 0 ISSUED 6-16-16 EP-FC-112-500-F-04 REV 0 ISSUED 6-16-16 EP-FC-112-500-F-06 REV 0 ISSUED 6-16-16 EP-FC-112-500-F-10 REV 0 ISSUED 6-16-16 EP-FC-112-500-F-11 REV 0 ISSUED 6-16-16 EP-FC-112-500-F-60 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals , please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 9 of 13 Rev. 9 D Radiological Emergency Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP
-FC-110 thru 115 , 1001) (EPF) 0 Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-112-AD-F-01REV0 ISSUED 6-16-16 EP-FC-112-F-01 REV 0 ISSUED 6-16-16 EP-FC-112-F-02 REV 0 ISSUED 6-16-16 EP-FC-112-F-05 REV 0 ISSUED 6-16-16 EP-FC-112-F-06 REV 0 ISSUED 6-16-16 EP-FC-112-F-07 REV 0 ISSUED 6-16-16 EP-FC-112-F-09 REV 0 ISSUED 6-16-16 EP-FC-112-F-11 REV 0 ISSUED 6-16-16 EP-FC-112-F-12 REV 0 ISSUED 6-16-16 EP-FC-112 REV 0 ISSUED 6-16-16 EP-FC-112-100 REV 0 ISSUED 6-16-16 EP-FC-112-200 REV 0 ISSUED 6-16-16 EP-FC-112-300 REV 0 ISSUED 6-16-16 EP-FC-112-400 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor
-Emergency Planning I hereby acknowledge receipt of the above documentslinformation and have included them In my assigned manuals. Signature:
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 1 s*h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/I nformation Page 10of13 Rev. 9 D Rad i ological Emergency Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP
-FC-110 thru 115 , 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-112-500 REVO ISSUED6-16-16 EP-FC-112-1000 REVO ISSUED6-16-16 EPIP-EOF-1 REV 20 ISSUED 3-8-16 EPIP-EOF-10REV14 ISSUED 10-10-13 EPIP-EOF-11 REV 29 ISSUED 4-02-13 EPIP-EOF-19 REV 11 ISSUED 3-8-16 EPIP-EOF-21 REV SA ISSUED 6-16-16 EPIP-EOF-23 REV 9 ISSUED 2-19-13 EPIP-EOF-24 REV 7 ISSUED 1-28-14 EPIP-EOF-25 REV 1 ISSUED 3-8-16 EPIP-EOF-26 REV 2 ISSUED 3-8-16 EPIP-EOF-3 REV 29 ISSUED 10-30-14 EPIP-EOF-6 REV 50 ISSUED 2-9-16 EPIP-EOF-7 REV 27 ISSUED 3-12-15 Summary of Changes: Please see the enclosed summary of changes. Supervisor
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 8/11/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16'h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 11 of 1 3 Rev. 9 D Radiological Emergency Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115, 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EPIP-OSC-15 REV 32 ISSUED 7-30-15 EPIP-OSC-2 REV63ISSUED11-19-15 EPIP-OSC-21 REV 21 ISSUED 4-17-14 EPIP-OSC-7 REV 5 ISSUED 5-12-15 EPIP-OSC-9 REV 15 ISSUED 9-13-12 EPIP-RR-11REV18 ISSUED 3-8-16 EPIP-RR-13 REV 18 ISSUED 7-31-15 EPIP-RR-17 REV 18 ISSUED 12-8-10 EPIP-RR-17A REV 31 ISSUED 3-8-16 EPIP-RR-19A REV 10 ISSUED 3-8-16 EPIP-RR-21A REV 8 ISSUED 3-8-16 EPIP-RR-22 REV 30 ISSUED 10-22-15 EPIP-RR-22A REV 10 ISSUED 6-8-11 EPIP-RR-25 REV 29 ISSUED 10-22-15 Summary of Changes: Please see the enclosed summary of changes. Supervisor
-Emergency Planning I hereby acknowledge receipt of the above documentslinformation and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 811112016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)llnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 12 of 13 Rev. 9 D Radiological Emergency
[8] Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115 , 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EPIP-RR-28 REV 12 ISSUED 3-8-16 EPIP-RR-28A REV 1 ISSUED 1-20-09 EPIP-RR-29 REV 27 ISSUED 3-8-16 EPIP-RR-39 REV 6 ISSUED 2-21-13 EPIP-RR-63 REV 16 ISSUED 7-30-15 EPIP-RR-66 REV 11 ISSUED 6-12-14 EPIP-RR-72 REV 24 ISSUED 3-8-16 EPIP-RR-87 REV 158 ISSUED 12-30-14 EPIP-RR-90 REV 8 ISSUED 3-8-16 EPIP-RR-91 REV 2 ISSUED 7-30-15 EPIP-RR-98 REV 2 ISSUED 5-12-15 EPIP-TSC-1 REV 33 ISSUED 3-18-14 EPIP-TSC-2 REV 18 ISSUED 2-4-16 EPIP-TSC-8 REV 20A ISSUED 4-30-12 Summary of Changes: Please see the enclosed summary of changes. Supervisor
-Emergency Planning I hereby acknowledge receipt of the above documentsfinformation and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 8/11 /2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. 0 Document(s)/lnformation No Longer Requested/Needed 0 Document(s)/lnformation Transferred to: Name: Mailing Address:
EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 1 3of13 Rev. 9 D Radiological Emergency
[gJ Emergency Plan D Emergency Planning Forms Implementing Procedures Response Plan (RERP) (EPIP)/(EP-FC-110 thru 115 , 1001) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
I information are forwarded for your manual: REMOVE SECTION INSERT SECTION EPIP-OSC-1 REV 488 ISSUED 8-12-14 EPIP-RR-21-REV 178 ISSUED 8-14-12 TBD-EPIP-OSC-1A REV 3 ISSUED 3-1-16 T8D-EPIP-OSC-1C REV2ISSUED11-24-10 T8D-EPIP-OSC-1E REV 1A ISSUED 8-6-09 T8D-EPIP-OSC-1FREV1B ISSUED 9-22-09 T8D-EPIP-OSC-1 H REV 3 ISSUED 1-22-15 T8D-EPIP-OSC-1S REV 2 ISSUED 7-20-10 EP-FC-1001 ADDENDUM 3 REV 0 ISSUED 6-16-16 EP-FC-1001 REV 0 ISSUED 6-16-16 Summary of Changes: Please see the enclosed summary of changes. Supervisor
-Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals. Signature:
Date: Please sign above and return by: 8111/2016 Tammy Collinson Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16 1 h Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/inforrnation contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s
)/lnforrnation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:
Executive Summary for Integration changes to Radiological Emergency Response Plan (RERP) and Emergency Plan Implementing Procedures (EPIPs). On June 16, 2016, Fort Calhoun Station (FCS) issued the [Exelon Fleet] integrated procedures to replace the previous RERPs and EPIPs. This action fulfilled a commitment made to the NRC by Omaha Public Power District and Exelon as part of the Confirmatory Action Letter associated with our exit from Inspection Manual Chapter 0350. While the majority of changes made were formatting and numbering scheme related, a thorough review of Fleet processes was conducted and these "AA" procedures were converted into "FC" procedures.
In some cases, select methods and practices that were necessary for Fort Calhoun Station were not contained within the Fleet procedures; these components were added as "AD" or "F" documents as supplemental procedures. Converting the AA Fleet documents to FC, AD and F documents allows Fort Calhoun Station to maintain control of processes unique to our License. Each change was vetted through our 10CFR 50.54(q) screening process and in each case, there was no identified Reduction In Effectiveness (RIE) or negative impact on the Planning Standards or commitments.
This screening process also includes disciplinary reviews as well as input from the Fleet and qualified position members. The screening paperwork includes several pages of "Summary of Changes", which will identify each procedure change. Changes were grouped by procedure series in order to organize the revisions in a logical manner. A cross-matrix was also created to ensure that each " old" RERP/EPIP was accounted for in either a new procedure or procedures; was deleted; or was replaced as a User Aid. All tasks performed in the previous format continue to be performed under the new format.
Summary of changes to FCS RERP, Sections and Appendices Page 1of3 RERP: Updated format. Renamed to EP-FC-1001 to align with fleet governance format. Moved Definitions and Acronyms to Appendix E 2.1 Removed reference to Security Department for Fire Brigade. 4.0 Removed reference to Blair Industrial Park COOP. This system is no longer in use. Section A: Updated Format 1. 7 Removed Stone and Webster Engineering Corporation
-service provided by company was temporary in nature and is no longer needed. 1.9 Removed Fremont Fire Department
-contaminated/injured OPPD workers report to Elkhorn Center. 3.1 Changed Emergency Preparedness Test (EPT) Program to Emergency Preparedness recurring tasks. Section B: Updated format 4.5.1 F Added" and making initial notifications to the NRC" to STA duties. This aligns with FCS staffing study. Table B.1 -Aligned Column names and content to align with NUREG 0654. Aligned on shift positions with FCS staffing study. Added note defining STA making initial notifications to the NRG. Section C: Updated format only Section D: Updated format. 2.2 Changed EPIP OSC-1 to EP-FC-1001 Addendum 3. This is for implementation of Rev 6 EAL scheme. Also changed A to R for abnormal Rad Levels and S to M for System Malfunction.
Section E: Updated format only. Section F: Updated Format only 2.19 Added allowable software exceptions for ERMS 2.25 Added Satellite phones Figure F-1 Added Satellite Phone to applicable locations Section G: Updated format 1.2 Changed Emergency Planning Test to recurring task. 4 Changed Emergency Planning Test to recurring task.
Summary of changes to FCS RERP, Sections and Appendices Page 2 of 3 Section H: Updated format 5.1 Changed Emergency Planning Tests to procedures.
5.2.2 Changed
repair/replacement of equipment to be coordinated through Radiation Protection Department 5.4.2 Kits maintained by RP. Section I: Updated format Removed or replaced references to system training manuals. 2.3.3 Changed EPT to station procedures.
Section J: Updated format 1.2.1 Changed Fremont reception and care facility to OPPD Elkhorn Center for worker evacuation point. 1.2.2 Updated times to reflect change to Elkhorn Center. 1.4.2 Changed EPIP EOF -11 to EP-FC-113.
2.1.2 Changed
EPIP EOF-6 to EP-FC-110, Assessment of Emergencies and EPIP EOF-7 to EP-FC-111 , Emergency Classification and Protective Actions. Section K: Updated format 2.1 Changed location of portable equipment from "onsite" to "in the warehouse". 2.3 Removed "to the EOF" as personnel will not be sent to EOF for decontamination.
Section L: Updated format only Section M: Updated format only Section N: Updated format; Replaced "Emergency Planning Tests" with "Emergency Planning Procedures" Section 0: Updated format 1.0 Removed Security from Fire Brigade to align with SO-G-28 Changed CPR retraining frequency to biannually to align with TQ-AA-174 and American Red Cross standards.
Replace Training Administrative Manual with Training Department Procedures.
2.0 Replaced
Fire Brigade TPMP with TQ-AA-173, Emergency Services Training Program. 3.0 No changes 4.0 Changed "The Fort Calhoun Station (FCS) Emergency Response Organization (ERO) Training Program Master Plan (TPMP)" to "TQ-FC-113, ERO Training and Qualification" Summary of changes to FCS RERP, Sections and Appendices Page 3 of 3 5.0 Removed reference to NAl-10. Changed ERO TPMP to TQ-FC-113.
6.0 No Change 7.0 Changed ERO TPMP to FCS training procedures.
Changed Emergency Planning Test to Emergency Planning procedure.
Section P: Updated format 1.5 Added "Site" to title of Manger-Emergency Planning Appendix A: Updated Format 1. 7 Removed Stone and Webster Engineering
1.8 Added
Tierney-Blair LLC 1.9 Removed Fremont Fire Department Appendix B: Updated format Appendix C: Updated format. Changed Plant Review Committee (PRC) to Plant Operating Review Committee (PORC) Updated EPIPS in Cross Reference List to new procedures.
Appendix D: Updated format Appendix E: NEW APPENDIX.
Moved Definitions and Abbreviations from front matter to the appendices.
Added URI/Rascal Summary of Procedures for this Change: EP-FC-1001 Addendum 3 Rev 0 To implement the revised EAL scheme based on NEI 99-01 Rev 6 submitted to the NRC in License Amendment Request (LAR) dated December 26, 2014. The NRC approved the License Amendment Request in a Safety Evaluation Report dated December 15, 2015. Revision 0 of Addendum 3 was intended to represent the approved document.
Revision 1 of Addendum 3 was issued to incorporate changes needed since Revision 0.
Summary of Procedures being assessed for this Change: Summary of Changes Page 1of26 EP-FC-110, ASSESSMENT OF EMERGENCIES-New procedure the provides guidance on how to operate the ERO computer applications used to gather and evaluate data from various tools and processes to effectively assess accident conditions.
This procedure did not supersede any FCS Procedure.
EP-FC-110-102, STATION PRIORITIES LOG (SPL) PROGRAM GUIDANCE-Provide guidance how to log into the SPL program , enter station priorities into the log, view information and/or print the SPL log. This procedure supersedes EPIP-EOF 23. EP-FC-110-200, DOSE ASSESSMENT-This procedure provides the methods and instructions for performing offsite dose assessment using the Unified RASCAL Interface (URI) by the dose assessors in the Control Room, Technical Support Center (TSC) and Emergency Operation Facility (EOF) This procedure supersedes EPIP-EOF-6 EP-FC-110-201 ON-SHIFT DOSE ASSESSMENT-This procedure provides the On Shift Dose Assessors instructions for performing offsite dose assessment using the Unified RASCAL Interface (URI). This procedure did not supersede any FCS Procedure.
EP-FC-110-302, CORE DAMAGE ASSESSEMENT (PWR)-This procedure provides methods for trending Reactor Coolant System (RCS) volume above the active core during Loss of Coolant Accidents (LOCA), methods for estimating the time to core uncovery, and performing core damage assessments.
This procedure supersedes EPIP-TSC-8.
EP-FC-110-200-F-01, DOSE ASSESSMENT INPUT FORM-New form to provide method to capture data used in dose assessment.
EP-FC-110-201-F-01, ON-SHIFT DOSE ASSESSMENT INPUT FORM-New form to provide method to capture data used in dose assessment.
Summary of Procedures for this Change: Summary of Changes Page 2 of 26 EP-FC-111, EMERGENCY CLASSIFICATION AND PROTECTIVE ACTION RECOMMENDATIONS
-New base procedure that provides guidance for classification of emergencies, provides guideline for determining Protective Action Recommendations (PARs), and provides guidance for event termination and entry into recovery.
Definitions and responsibilities are also defined in the procedure.
This procedure supersedes EPIP-EOF-7 and general definitions and responsibilities previously defined in EPIP-OSC-1 (Remaining portions of EPIP-OSC-1 are superseded by EP-FC-1001 Addendum 3). EP-FC-111-F-01, TERMINATION I RECOVERY CHECKLIST
-New checklist that provides guidance on termination and recovery considerations prior to event termination and entry into recovery.
This procedure supersedes EPIP-EOF-19.
EP-FC-111-AD-F-02, FORT CALHOUN PAR FLOWCHART-Clerical change. Change AG1 to RG1 on page 1 of the flowchart to align with revision 6 of the EAL's approved for issue by the NRG.
Summary of Procedures being assessed for this Change: Summary of Changes Page 3 of 26 EP-FC-112 EMERGENCY RESPONSE ORGANIZATION (ERO) EMERGENCY RESPONSE FACILITY (ERF) ACTIVATION AND OPERATION-New procedure that describes the activation and operation of the ERO and ERF and outlines their responsibilities.
This procedure supersedes Sections 1-4, and Attachments 6.1 to 6.3 of EPIP-OSC-2 EP-FC-112-F-01 COMMAND AND CONTROL TURNOVER BRIEFING FORM-A checklist for capturing required data for turnover between Command and Control positions.
This checklist supersedes Attachment 6.7 of EPIP-OSC-2 EP-FC-112-F-02 Facility Briefing Checklist-Provides standardized method for briefing an Emergency Facility on status of an event. This checklist supersedes FC-EPF-36.
EP-FC-112-F-05 DOSE ASSESSMENT TURNOVER FORM-This new checklist provides a formal means to document turnover items for individuals performing Dose Assessment.
This checklist did not supersede any FCS Procedure EP-FC-112-F-06 INFORMATION REQUEST-MESSAGE SHEET-Provides a formalized method for tracking information requests.
This checklist did not supersede any FCS Procedure.
EP-FC-112-F-07 TSC FIELD MONITORING TEAM BRIEFING TRANSFER CHECKLIST-Provides a formal means for conducting a briefing prior to transfer of control of field teams. This checklist did not supersede any FCS Procedure.
EP-FC-112-F-08 is the ERO position log referenced with integrated procedures and will be issued with the EP-FC-112-700 Series, Alternative Facility Operation.
This is a new logs and provides a tool for ERO members to documents important emergency information.
This log maintains the same purpose as the FC-EPF-13, Emergency Response Organization Log Sheet, and will eventually replace it when the Exelon Summary of Changes Page 4 of 26 integration process is complete.
The creation of this log is in no way reduces the effectiveness of the emergency plan implementing procedures already in place. EP-FC-112-F-09 EMERGENCY PUBLIC ADDRESS ANNOUNCEMENTS-New checklist for specifying specific announcements to be made at FCS during Emergencies.
This checklist supersedes Attachments 6.4 and 6.5 of EPIP-OSC-2 EP-FC-112-F-11 EOF STAFFING REQUEST FORM-New form to formalize staffing requests.
This checklist did not supersede any FCS Procedure.
EP-FC-112-F-12
-STAFFING REQUEST TRACKING FORM-New form to track requests for additional staffing at an Emergency Response Facility.
This checklist did not supersede any FCS Procedure.
EP-FC-112-AD-F-01
-Operations Liaison Out of Service Equipment List-New form that replaces FC-EPF-37 in its entirety.
Change to procedure number only. This procedure supersedes FC-EPF-37 EP-FC-112-1000
-CATASTROPHIC FLOODING PREPARATIONS-New procedure that replaces EPIP-TSC-2, Catastrophic Flooding Preparations.
EPIP-TSC-2 was brought over in its entirety with the exception of the procedure number. This procedure supersedes EPIP-TSC-2 Summary of Procedures being assessed for this Change: Summary of Changes Page 5 of 26 FC-EPF-12
-JIC 24-Hour Staffing Schedule -JIG Staffing schedule is incorporated in the OPPD Crisis Communication Plan therefore FC-EPF-12 is being deleted. FC-EPF-19, PROCESS AND AREA MONITOR LOCATIONS -This form is an aid that lists process and area monitor locations.
The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid FC-EPF-20, SITE BOUNDARY/OWNER CONTROL AREA -This form is an aid that provides a map of the site boundary/owner control area. The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid FC-EPF-21, FORT CALHOUN STATION SECTOR MAP -This form is an aid that provides a map of sectors. The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid FC-EPF-32, AREA MONITOR TRENDING -This form is an aid that provides a location for trending area monitors.
The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid FC-EPF-33A, ERFCS FUNCTION KEY MAPPING -This form is an aid providing ERFCS Function Key Mapping. 01-ERFCS-1 is the procedure that governs this process and is still in effect. The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid FC-EPF-35, IOWA EOC ROUTE MAP -This form is an aid that provides a map to the State of Iowa EOG. The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid Summary of Changes Page 6 of 26 FC-EPF-44, Process Radiation Monitor Power Supplies -This form is an aid that lists process radiation monitor Power supplies.
The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid FC-EPF-48, Employee Information Telephone Line Instructions
-This form provides and aid for ERO personnel to contact Human Resources to update the OPPD Employee Information Line. The form is not used to implement any parts of the Fort Calhoun Emergency Plan. Turned into Emergency User Aid Summary of Procedures for this Change: Summary of Changes Page 7 of 26 EP-FC-112-100, CONTROL ROOM OPERATIONS.
New procedure; This procedure provides a base for an Emergency Response in the Control room, to include position responsibilities, overall initial Command & Control, Notification and Augmentation, and Dose Assessment.
This procedure superseded the notification portions of EPIP-OSC-2 Attachment 6.1 , 6.2, & 6.3. EP-FC-112-1 OO-F-01, COMMAND AND CONTROL. This new procedure provides guidance to documents required for the initial, ongoing, and termination/recovery stages of an Emergency Response, to include; Notification and Augmentation, NRG Notification, On-Shift Dose Assessment, Emergency Exposure, Potassium Iodide (Kl) authorization, and Transfer of Command and Control. This procedure superseded the notification portions of EPIP-OSC-2 Attachment 6.1 , 6.2, & 6.3. EP-FC-112-100-F-02, SHIFT DOSE ASSESSOR CHECKLIST.
This new procedure is an enhancement which provides formal method for position specific actions and references documents needed for performing Dose Assessment.
EP-FC-112-100-F-03, OPERATIONS LIAISON (CR) CHECKLIST.
Specific actions from previous procedure EPIP-RR-19A Operations Liaison Position, have been incorporated any wording changes do not alter the intent and are editorial or enhancing.
Commitment AR 11390 has been carried over. EP-FC-112-100-F-04, CR DOSE ASSESSMENT SPECIALIST CHECKLIST.
This new procedure is an enhancement which provides formal method for position specific actions and references documents needed for performing Dose Assessment.
EP-FC-112-100-F-05, SHIFT COMMUNICATOR (CR) CHECKLIST.
This new procedure is an enhancement which provides a method for the communicator to document and track information and references appropriate documents for Offsite communications.
EP-FC-112-100-F-06, ERO NOTIFICATION OR AUGMENTATION.
This new procedure supersedes Attachments 4, 5, 6, 9, 10, 11, 12, 13, & 15 of EPIP-OSC-15, Communicator Actions and provides method for the communicator to document and track information and references appropriate documents for Notification or Augmentation communications.
Commitment
[AR 13301] is carried over.
Summary of Changes Page 8 of 26 EP-FC-112-100-F-07, HABITIBILITY technician Checklist (AR 11809).
New form provides formal method for position specific actions and references documents needed for performing Habitability Technician actions. EP-FC-112-1 OO-AD-F-01, CRITICAL PARAMETER CHECKLIST.
Specific actions from FC-EPF-49 were carried over fully intact. Editorial change due to the numeric title change only.
Summary of Procedures for this Change: Summary of Changes Page 9 of 26 EP-FC-112-200, TSC ACTIVATION AND OPERATION.
New procedure; This procedure provides a base for an Emergency Response in TSC, to include position activities responsibilities in the TSC, overall initial Command & Control, Reactor Safety, Logistics, Dose Assessment, and Security.
EP-FC-112-200-F-01, TSC Site Director Checklist.
This new procedure provides guidance to documents required for the initial, ongoing, and termination/recovery stages of an Emergency Response, to include; Notification and Augmentation, NRC Notification, On-Shift Dose Assessment, Emergency Exposure, Potassium Iodide (Kl) authorization, and Transfer of Command and Control. This procedure superseded the notification portions of EPIP-OSC-2 Attachment 6.1 , 6.2, & 6.3. EP-FC-112-200-F-02, TSC DIRECTOR CHECKLIST. This new procedure is designed to assist the TSC Director in activating the TSC, with ERO Position Log, with Off-Site notifications, priorities, release determination, PA announcements, accountability, and termination and recovery.
This procedure supersedes EPIP-RR-11 and attachments 1, 2, 3, and 4 of EPIP-TSC-1 EP-FC-112-200-F-03, LOGISTICS COORDINATOR CHECKLIST.
This new procedure provides definition and overall description of the Emergency Response Organization. Specific actions from previous procedure have been incorporated any wording changes do not alter the intent and are editorial or enhancing.
This procedure supersedes EPIP-RR-17 A. EP-FC-112-200-F-04, SECURITY COORDINATOR CHECKLIST. This procedure provides definitions and overall descriptions of the Emergency Response Organization.
Specific actions from previous procedure have been incorporated any wording changes do not alter the intent and are editorial or enhancing.
This procedure supersedes EPIP-RR-17.
EP-FC-112-200-F-05, STATE LOCAL COMMUNICATOR CHECKLIST. New checklist provides method for communicator to document and track information and references appropriate documents for Offsite communications.
Summary of Changes Page 10 of 26 EP-FC-112-200-F-08, TSC OPS Liaison Checklist.
Specific actions from previous procedure have been incorporated any wording changes do not alter the intent and are editorial or enhancing.
This procedure supersedes EPIP-RR-19A.
EP-FC-112-200-F-09, REACTOR SAFETY COORDINATOR.
This new procedure ensures supervision and replacement part evaluation of Technical Support Group activities based on station priorities established by the Emergency Director.
Specific actions from previous procedure have been incorporated any wording changes do not alter the intent and are editorial or enhancing.
This procedure supersedes EPIP-RR-13.
EP-FC-112-200-F-11, REACTOR ENGINEER CHECKLIST.
This new checklist is an enhancement, new checklist provides Reactor Engineer information not previously available and provides a chronological order for initial, on-going, and closeout position expectations.
EP-FC-112-200-F-14, Protective Measure Coordinator Checklist
.. All portions of EPIP-RR-22 are incorporated , any wording changes do not alter the intent and are editorial or enhancing.
This procedure supersedes EPIP-RR-22.
EP-FC-112-200-F-17, CHP COMMUNICATOR (TSC) CHECKLIST.
Specific actions from previous procedure have been incorporated any wording changes do not alter the intent and are editorial or enhancing.
This procedure supersedes EPl-RR-90.
EP-FC-112-200-F-19, EMERGENCY SPECIAL PROCEDURE FORM. Enhancement for Command and Control, new form documents special required purpose, prerequisites, precautions, required equipment and procedural steps for emergencies up to and including invoking 1 OCFR50.54(X)/(Y).
EP-FC-112-200-F-23, SHIFT ASSIGNMENT GUIDANCE.
This new document assists the Admin Logistics Coordinator (TSC)/Manager (EOF), in an extended event, staff the ERO. This document is new and is an enhancement.
Summary of Changes Page 11 of 26 EP-FC-112-200-F-24, SHIFT ASSIGNMENT WORKSHEET
.. This new document assists the Admin Logistics Coordinator, in an extended event, staff the TSC. This document is new and is an enhancement.
EP-FC-112-200-F-25, CHP COMMUNICATOR WORKSHEET.
This new document assists the CHP Communicator, in documenting In-Plant Radiological Data and Environmental Data. This document is new and is an enhancement.
EP-FC-112-200-F-26, Health Physics Networks.
-New checklist that provides the TSC CHP Communicator guidance on initial, ongoing, and closeout actions. The checklist also directs the TSC CHP Communicator to other procedures and process that may be required during an emergency situation.
EP-FC-112-200-F-28, Primary Systems Engineer Checklist.
Enhancement, this information was not previously available to the Primary System Engineer.
This new checklist provides a chronological order for initial, on-going, and closeout position expectations.
EP-FC-112-200-F-29, ELECTRICAL l&C SYSTEMS ENGINEER CHECKLIST.
Enhancement, this information was not previously available to the Electrical l&C System Engineer.
This checklist provides a chronological order for initial, on-going, and closeout position expectations.
EP-FC-112-200-F-30, SECONDARY SYSTEMS ENGINEER CHECKLIST. Enhancement, this information was not previously available to the Secondary System Engineer.
This checklist provides a chronological order for initial, on-going, and closeout position expectations.
EP-FC-112-200-F-31, TSC SECURITY COORDINATOR HOSTILE ACTION EVENT CHECKLIST.
Enhancement, this information was not available in the TSC for post event staffing, or if the Security Coordinator is located in the TSC during an actual Hostile Action Event (H1 Series). This checklist provides a chronological order for initial, on-going, and closeout position expectations.
EP-FC-112-200-F-40, SECURITY DATA SHEET. This new data sheet is an enhancement to the Security Coordinator, in providing quick pertinent information during H1 Series classifications.
Summary of Changes Page 12 of 26 EP-FC-112-200-F-41, SECURITY SUPPLAMENTAL SUPPORT WORKSHEET.
This is a new worksheet that quickly helps the Security Coordinator identify contacted LLEA, during H1 Series classifications.
EP-FC-112-200-AD-F-020, FCS TSC VENTILATION LINEUP. This information has been relocated from EPIP-TSC-1 attachments 3 & 4. AR 30816, LIC-01-0109 is ongoing, the only change to attachments 3&4 is the title. EP-FC-112-200-AD-01, CR-TSC 24 Hour Staffing Schedule.
This form supersedes FC-EPF-10, the information was transferred in whole with only a title change.
Summary of Procedures being assessed for this Change: Summary of Changes Page 13 of 26 EP-FC-112-300, Rev 0, OPERATIONS SUPPORT CENTER ACTIVATION AND OPERATION-This procedure provides an overview of the Operations Support Center (OSC) activities associated with an emergency condition.
This procedure did not supersede any FCS Procedure.
EP-FC-112-300-AD-F-01, Rev 0, FORT CALHOUN OSC SUGGESTED CONFIGURATION-This procedure provides a checklist to activate the OSC as well as the physical layout of the facility.
This procedure supersedes EPIP-OSC-21 , except Attachment 4, Checklist for Deactivation of OSC, which can be found in the 115 Series. EP-FC-112-300-AD-F-02, Rev 0, OSC 24-HOUR STAFFING SCHEDULE-This procedure is a cut and paste of FC-EPF-9 and tracks OSC staffing by position and shift. This procedure supersedes FC-EPF-9 EP-FC-112-300-F-01, Rev 0, OSC DIRECTOR CHECKLIST-This procedure provides guidance to the OSC Director and incorporates facility activation actions found in OSC-21 as well as OSC Director Actions in EPIP-RR-21.
This procedure supersedes EPIP-RR-21 and Attachment 1 of EPIP-OSC-21 EP-FC-112-300-F-02, Rev 0, Maintenance Coordinator CHECKLIST-This procedure provides guidance to the OSC Maintenance Coordinator.
This procedure supersedes EPIP-RR-21A.
EP-FC-112-300-F-03, Rev 0, OSC Coordinators CHECKLIST-This procedure incorporates the tasks of the RP Coordinator and Chemistry Coordinator and includes actions team briefings and for evacuation/relocation.
This procedure supersedes EPIP-RR-22A, EPIP-RR-87 and EPIP-OSC-9 EP-FC-112-300-F-04, Rev 0, OSC MEDICAL COORDINATOR-This procedure provides guidance to the OSC Medical Coordinator. This procedure supersedes EPIP-RR-39.
Summary of Changes Page 14 of 26 EP-FC-112-300-F-07, Rev 0, OSC Dosimetry Technician Checklist-This procedure provides instruction and guidance to the OSC Dosimetry Technician.
This procedure supersedes EPIP-RR-28A.
EP-FC-112-300-F-08, Rev 0, DOSIMETRY ISSUE TO EMERGENCY RESPONSE PERSONNEL-This procedure documents dosimetry issue device information and recipient information.
This procedure supersedes FC-EPF-51 EP-FC-112-300-F-09, Rev 0, Airborne Activity Log -This is a new form which documents exposure information for personnel, as well as documentation of airborne sampling.
This does not supersede any procedure EP-FC-112-300-F-10, Rev 0, OPERATIONS LIAISON (OSC) CHECKLIST-This procedure provides guidance for the OSC Operations Liaison. This procedure supersedes EPIP-RR-19a, Attachment 6.4 -OSC Operations Liaison Checklist EP-FC-112-300-F-014, Rev 0, OSC TEAM BRIEFING -DEBRIEFING FORM -This procedure provides guidance to the Command and Control position or designees for briefing and dispatching emergency teams into potentially radioactive areas. This procedure supersedes EPIP-OSC-9.
EP-FC-112-300-F-016, Rev 0, OSC STAFF GUIDELINES-This procedure provides guidance on the formation of emergency teams. This procedure supersedes steps 6.1.1, 6.1.2 and 6.1.6 of EPIP-OSC-9 EPIP-RR-28 OSC ACCOUNTABILITY CLERK ACTIONS will be superseded and will be added as an USER AID.
Summary of Procedures for this Change: Summary of Changes Page 15 of 26 EP-FC-112-400, EMERGENCY OPERATIONS FACILITY OPERATION
-New base procedure that describes EOF activities and responsibilities associated with an emergency.
This is a new procedure.
EP-FC-112-400-F-03, EOF DIRECTOR CHECKLIST-New checklist that provides the Emergency Director guidance on initial, ongoing, situational, and closeout actions. The checklist also directs the EOF Emergency Director to other procedures and process that may be required during an emergency situation.
This procedure supersedes EPIP-OSC-2 Attachment 6.3 EP-FC-112-400-F-04, EOF ADMINISTRATIVE LOGISTICS MANAGER New checklist that provides the EOF Administrative Logistics Manager guidance on initial, ongoing, situational, and closeout actions. The checklist also directs the EOF Administrative Logistics Manager to other procedures and process that may be required during an emergency situation.
This procedure supersedes EPIP-RR-29 EP-FC-112-400-F-05, EOF COP COMMUNICATOR CHECKLIST
-New checklist that provides the EOF COP Communicator guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF COP Communicator to other procedures and process that may be required during an emergency situation.
This procedure supersedes EPIP-OSC-15 Attachment 3 EP-FC-112-400-F-07, CLERICAL ASSIST ANT (EOF) CHECKLIST
-New checklist that provides the EOF Clerical Assistant with guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF Clerical Assistant to other process that may be required during an emergency situation.
This is a new checklist EP-FC-112-400-F-08, CLERICAL ASSISTANT (EOF) CHECKLIST-New checklist that provides the EOF IT Specialist with guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF IT specialist to other procedures and process that may be required during an emergency situation.
This is a new checklist Summary of Changes Page 16 of 26 EP-FC-112-400-F-09, EOF OPERATIONS LIAISON CHECKLIST
-New checklist that provides the EOF Operations Liaison guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF Operation Liaison to other procedures and process that may be required during an emergency situation.
This procedure supersedes EPIP-RR-19A EP-FC-112-400-F-16, PROTECTIVE MEASURES MANAGER CHECKLIST
-New checklist that provides the EOF Protective Measures Manager guidance on initial, ongoing, situational, and closeout actions. The checklist also directs the EOF Protective measures Manager to other procedures and process that may be required during an emergency situation.
This procedure supersedes EPIP-RR-22 EP-FC-112-400-F-17, DOSE ASSESSMENT COORDINATOR CHECKLIST
-New checklist that provides the EOF Dose Assessment Coordinator guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF Dose Assessment Coordinator to other procedures and process that may be required during an emergency situation.
This procedure supersedes EPIP-RR-25 EP-FC-112-400-F-18, EOF DOSE ASSESSMENT SPECIALIST CHECKLIST
-New checklist that provides the EOF Dose Assessment Specialist guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF Dose Assessment Specialist to other procedures and process that may be required during an emergency situation.
This is a new checklist EP-FC-112-400-F-19, CHP COMMUNICATOR CHECKLIST
-New checklist that provides the EOF CHP Communicator guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF CHP Communicator to other procedures and process that may be required during an emergency situation.
This procedure supersedes EPIP-RR-90 Summary of Changes Page 17 of 26 EP-FC-112-400-F-21, EOF FIELD TEAM SPECILIST CHECKLIST
-New checklist that provides the EOF Field Team Specialist guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF Field Team Specialist to other procedures and process that may be required during an emergency situation.
This procedure supersedes EPIP-RR-72 EP-FC-112-400-F-28, EOF ACTIVATION
-New title for former procedure EPIP-EOF-1 , Activation of the Emergency Operation Facility.
No changes to the process, only numbering and formatting changes. This procedure supersedes EPIP-EOF-1 EP-FC-112-400-F-30, EOF LOSS OF NORMAL ELECTRIC POWER-New procedure that provides guidance on loss of power to the EOF. This is a new procedure EP-FC-112-400-F-32, LIST OF COMMONLY ASKED QUESTIONS AT EOCS -New procedure that provides ERO personnel a list of questions commonly asked at EOCs so they are better prepared to answer questions.
This is a new procedure EP-FC-112-400-F-39, EOF STAFFING -New title for former procedure FC-EPF-11 , EOF 24 Hour Staffing Schedule.
No changes to the process, only numbering and formatting changes. This procedure supersedes FC-EPF-11 EP-FC-112-400-F-42, METOROLOGICAL FORCAST WORKSHEET
-New worksheet that provides ERO personnel a method for capturing meteorological data. This is a new worksheet EP-FC-112-400-F-91, EOF EMERGENCY RESPONSE COORDINATOR CHECKLIST
-New checklist that provides the EOF Emergency Response Coordinator with guidance on initial, ongoing, and closeout actions. The checklist also directs the EOF Emergency Response Coordinator to other procedures and process that may be required during an emergency situation.
This procedure supersedes EPIP-RR-91 Summary of Changes Page 18 of 26 EP-FC-112-400-AD-F-06, WESTINGHOUSE EMERGENCY INFORMATION New title for former procedure EPIP-RR-29 Attachment 1, Westinghouse Electric Emergency Information Sheet. No changes to the process, only numbering and formatting changes. This procedure supersedes EPIP-RR-29 Attachment 1 EP-FC-112-400-AD-F-07, INPO EVENT NOTIFICATION
-New title for former procedure EPIP-RR-29 Attachment 2, INPO Event Notification sheet. No changes to the process, only numbering and formatting changes. This procedure supersedes EPIP-RR-29 Attachment 2 EP-FC-112-400-AD-F-08, OPPD EMPLOYEE HOTLINE MESSAGE -New title for former procedure EPIP-RR-29 Attachment 3, OPPD Employee Hotline Message. No changes to the process, only numbering and formatting changes. This procedure supersedes EPIP-RR-29 Attachment 3 EPIP-RR-63, EOF DOSE ASSESSMANT ASSISTANT ACTIONS -This procedure was turned into an Emergency User Aid due to position not implementing any parts of the Fort Calhoun Emergency Plan. Dose Assessment Assistants provide supporting roles only. Turned into Emergency User Aid EPIP-RR-66, COMMUNICATIONS SPECILISTS ACTIONS -This procedure was turned into an Emergency User Aid due to position not implementing any parts of the Fort Calhoun Emergency Plan. Communications Specialists provide supporting roles only and are essentially preforming their normal daily roles in support of the ERO. Turned into Emergency User Aid EPIP-RR-98, EOF SECURITY OFFICER ACTIONS -This procedure was turned into an Emergency User Aid due to position not implementing any parts of the Fort Calhoun Emergency Plan. EOF Security Officers provide supporting roles only control access in and out of the EOF. Turned into Emergency User Aid Summary of Procedures being assessed for this Change: Summary of Changes Page 19 of 26 EP-FC-112-500 EMERGENCY ENVIRONMENT AL MONITORING-This procedure describes the responsibilities and actions for the coordination of FCS Nuclear Field Monitoring Teams, including the tracking of a radiological release plume. This document supersedes EPIP-EOF-3 EP-FC-112-500-F-01, Field Monitoring Team Checklist-Provides direction and place keeping for actions taken by Field Monitoring Teams during implementation of the FCS Emergency Plan. This document supersedes attachment 1 and 3 of EPIP-EOF-3 EP-FC-112-500-F-02, Protective Equipment and Personnel Dosimetry-This form provides guidance to the Protective Measures with respect to the wearing of protective clothing by Field Monitoring Teams and to specify the dosimetry requirements for those teams. This document supersedes attachment 3 of EPIP-EOF-11. EP-FC-112-500-F-03, Field Survey Data Sheet-New form for documenting radiation survey performed during plume tracking and evaluation.
This document supersedes attachment 3 of EPIP-EOF-3 and radiation survey sampling section of FC-EPF-02.
EP-FC-112-500-F-04, Offsite Airborne Monitoring Log-New form for documenting airborne monitoring performed during plume tracking and evaluation.
This document supersedes airborne sampling section of FC-EPF-02 EP-FC-112-500-F-06, Transfer of Shipment of Radiological Samples to Radiological Laboratories.-This form describes the methods to be used to transfer or ship environmental samples to an analysis laboratory.
This procedure did not supersede any FCS Procedure.
EP-FC-112-500-F-10, Field Monitoring Team Dispatch Log-New document for briefing and dispatching field monitoring teams.
This procedure did not supersede any FCS Procedure.
Summary of Changes Page 20 of 26 EP-FC-112-500-F-11, Field Monitoring Team Turnover Checklist-New document for performing turnover between field monitoring teams. This procedure did not supersede any FCS Procedure.
EP-FC-112-500-F-60, FIELD MONITORING TEAM INSTRUMENT OPERATION-New document that provides instruction on operation of instruments for Field Monitoring Teams. This procedure supersedes attachments 4, 5 and 6 from EPIP-EOF-3 Summary of Procedures being assessed for this Change: Summary of Changes Page 21of26 EP-FC-113, PERSONNEL PROTECTIVE ACTIONS -This procedure provides the necessary guidance used in determining onsite personnel protective actions during an event to include assembly, accountability and evacuation; habitability; emergency exposure limits; and Kl assessment.
This procedure supersedes EPIP-EOF-21 in its entirety.
The Kl Authorization flowchart has been turned into a user aid. EP-FC-113-AD-F-01, HABITABILITY WORKSHEET-This is a cut and paste of EPF-50 This procedure supersedes FC-EPF-50 EP-FC-113-AD-F-02, ESTIMATED EXPOSURE LOG -This is a cut and paste of EPF-7 This procedure supersedes FC-EPF-7 EP-FC-113-F-01, ON-SITE HABITABILITY CHECKLIST This procedure did not supersede any FCS Procedure.
EP-FC-113-F-02, AUTHORIZATION FOR EMERGENCY EXPOSURE-This is a cut and paste of FC-EPF-5.
This procedure supersedes FC-EPF-5 EP-FC-113-F-03, THYROID BLOCKING AGENT AUTHORIZATION -This is a new form This procedure did not supersede any FCS Procedure.
EP-FC-113-F-04, ADMINISTRATION OF POTASSIUM IODIDE TABLETS-This is a cut and paste of FC-EPF-3.
This procedure supersedes FC-EPF-3 Summary of Changes Page 22 of 26 EP-FC-113-F-05, VEHICLE AND EVACUEE CONTROL GROUP LEADER CHECKLIST-This is a new form This procedure did not supersede any FCS Procedure.
EP-FC-113-F-06, VEHICLE AND EVACUEE CONTROL GROUP MEMBER CHECKLIST-This is a new form This procedure did not supersede any FCS Procedure.
EP-FC-113-F-07, SITE ASSEMBLY, ACCOUNTABILITY AND EVACUATION-This is a new form This procedure did not supersede any FCS Procedure.
EP-FC-113-F-11, REMOTE AREA MUSTER LIST-This is a new form This procedure did not supersede any FCS Procedure.
EP-FC-113-F-12, VEHICLE SURVEYAND DECONTAMINATION REPORT-This procedure incorporates Step 5.2 of EPIP-EOF-25 which discusses personnel processing their vehicle through the vehicle portal monitor and issuance of a tag for the vehicle; attachment 6.3 of EPIP-EOF-25, vehicle tags, is also included.
This procedure supersedes step 5.2 and attachment 6.3 of EPIP-EOF-25.
EP-FC-113-F-13, FACILITY ACCOUNTABILITY LIST (WITHIN PROTECTED This is a new form This procedure did not supersede any FCS Procedure.
EP-FC-113-F-23, ASSEMBLY AREA ROSTER-This is a new form This procedure did not supersede any FCS Procedure.
EP-FC-113-F-24, RELOCATION CENTER OPERATIONS CHECKLIST-This procedure incorporates the Step 5 PROCEDURE of EPIP-EOF-25 and provides additional guidance on tasks performed at the Relocation Center. This procedure supersedes Step 5 of EPIP-EOF-25 Summary of Changes Page 23 of 26 EP-FC-113-F-25, RELOCATION CENTER ACCOUNTABILITY LOG -This is a new form This procedure did not supersede any FCS Procedure.
EP-FC-113-F-26, RELOCATION CENTER MONITORING LOG-This is a new form This procedure did not supersede any FCS Procedure.
EP-FC-113-F-29, FORT CALHOUN ASSEMBLY, ACCOUNTABILITY AND EVACUATION GUIDELINES -This is a new form This procedure did not supersede any FCS Procedure.
EP-FC-113-F-30, Setup and Operation of the Portal Monitoring at Decontamination Facility-This procedure provides guidance for the setup, function check, calibration, and use of the Pedestrian and Vehicle Portal Monitors. This procedure supersedes EPIP-EOF-25 and EPIP-EOF-26 in their entirety.
EP-FC-113-F-31, Warehouse Personnel Decontamination Station This procedure provides instruction for activating and operating the Warehouse Personnel Decontamination Station. This procedure supersedes EPIP-EOF-10 in its entirety.
The process used to document exposure to Emergency Responders is governed by RP-AA-210-1001.
This process supersedes FC-1189, DOSIMETRY ISSUE TO EMERGENCY RESPONSE PERSONNEL.
Summary of Procedures for this Change: Summary of Changes Page 24 of 26 EP-FC-114, NOTIFICATIONS
-New procedure that provides a base for making various notifications directed from sub procedures and forms within the EP-FC-114 Series. The procedure includes notification terms and definitions, responsibilities, requirements, and instructions for completing and transmitting NRC Event Notification Worksheets.
This procedure superseded the notification portions of EPIP-OSC-2 Attachment 6.1 , 6.2, & 6.3. EP-FC-114-100, OFF-SITE NOTIFICATION
-New procedure that provides guidance on how to complete prompt and accurate notifications to the local states and counties using the Event Notification Form (EP-FC-114-100-F-01).
This procedure supersedes elements of EPIP-OSC-2 Attachments 6.1 , 6.2 & 6.3 while providing greater detail on how to complete the event notification form. EP-FC-114-1 OO-F-01, FORT CALHOUN STATION -STATE/LOCAL EVENT NOTIFICATION FORM-This procedure provides a format to communicate required emergency information to the affected state and counties during an emergency.
Formatting of this form was preapproved by the affected states and counties and the regulatory required information remains part of the form. This procedure supersedes FC-1188 EP-FC-114-100-F NOTIFICATION/UPDATE OF STATES AND COUNTIES This procedure provides guidance on how to contact the states and counties via normal and backup methods with event notification form information.
This procedure supersedes EPIP-OSC-15 Attachment
- 7. EP-FC-114-1 OO-F-03 -ACCELERATED VERBAL NRC NOTIFICATION This form replaces FC-EPF-45 and is a procedure numbering change only as the form was brought over in its entirety.
This procedure supersedes FC-EPF-45.
EP-FC-114-F-01, RELEASE IN PROGRESS DETERMINATION GUIDANCE-This is a new procedure that enhances the stations ability to determine if a release is in progress based on the emergency event. New Procedure.
Summary of Changes Page 25 of 26 EP-FC-114-AD-F-03, EOF BACKUP ALERT NOTIFICATION SYSTEM ACTIVATION
-This procedure provides guidance on how to sounds the sirens in the event the states and counties specifically request FCS to complete siren system activation.
This procedure supersedes EPIP-EOF-24 Summary of Procedures for this Change: Summary of Changes Page 26 of 26 EP-FC-115, TERMINATION AND RECOVERY -New procedure that provides guidance and instruction for transition to the recovery phase of an event. Terms, definitions and responsibilities are also defined in the procedure.
The procedure walks the command and control positon through transitioning out of a declared event, termination directly form a declared event, preparations to enter recovery, entering recovery, recovery phase actions, and termination from recovery.
This procedures expands on the instructions formally provided in EPIP-EOF-19. This procedure supersedes EPIP-EOF-19 EP-FC-115-F-01, ISSUES I STRATEGIES FORM -This is a new form that was developed for use in the termination and recovery process. The issues and strategies form provides decision makers a strong format for documenting and describing issues and the resources needed to complete recovery tasks. This is a new form.
Summary of Changes, EP-FC-1001 Addendum 3 Rev 1 This change to Addendum 3 is occurring for 4 main reasons: 1. To implement the revised EAL scheme based on NEI 99-01 Rev 6 submitted to the NRC in License Amendment Request (LAR) dated December 26, 2014. The NRC approved the License Amendment Request in a Safety Evaluation Report dated December 15, 2015. The revised EAL scheme was trained on by the Fort Calhoun Station and Corporate personnel during the 1st and 2nct QTR of 2016. The NRC approved EAL scheme based on NEI 99-01 Rev 6 is being implemented as EP-FC-1001 Addendum 3 Revision 1. 2. The EAL scheme originally submitted and approved referenced Appendix R of 1 OCFR50 as the basis for station fire protection and response.
Fort Calhoun fire protection is based on the requirements of NFPA 805. The basis for EAL HU3, FIRE potentially degrading the level of safety of the plant, has been modified to reflect this difference.
- 3. The EAL scheme originally submitted used the currently installed plant seismic instrumentation as the primary indication for declaration of a seismic event. Upon review, it was determined that this indication is not consistent with the stations defined levels for an Operating Basis Earthquake (QBE). EAL HU4, Seismic event greater than QBE levels, has been modified to align with standard industry symptoms for an QBE not based on available instrumentation.
- 4. Some minor administrative and formatting discrepancies were identified during training conducted with emergency directors and licensed operators.
These discrepancies have been corrected.