ML18113A134: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18113A134
| number = ML18113A134
| issue date = 04/10/2018
| issue date = 04/10/2018
| title = Turkey Point, Units 3 and 4 - Transmittal of Subsequent License Renewal Application  Revision 1
| title = Transmittal of Subsequent License Renewal Application  Revision 1
| author name = Maher W D
| author name = Maher W D
| author affiliation = Florida Power & Light Co
| author affiliation = Florida Power & Light Co
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:OSM Enclosure 5 contains information requested to be withheld from public disclosure under 10 CFR 2.390
{{#Wiki_filter:OSM Enclosure 5 contains information requested to be withheld from public disclosure under 10 CFR 2.390
* FPL" April 10, 2018 L-2018-082 10 CFR 54.17 10 CFR 2.390 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re: Florida Power & Light Company Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Turkey Point Units 3 and 4 Subsequent License Renewal Application -Revision 1  
* FPL" April 10, 2018 L-2018-082 10 CFR 54.17 10 CFR 2.390 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re: Florida Power & Light Company Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Turkey Point Units 3 and 4 Subsequent License Renewal Application  
-Revision 1  


==References:==
==References:==
: 1. FPL Letter L-2018-004 to NRG dated January 30, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application 2. FPL Letter L-2018-039 to NRG dated February 9, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application -Supplement 1 3. FPL Letter L-2018-053 to NRG dated February 16, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application -Supplement 2 4. FPL Letter L-2018-059 to NRG dated March 1, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application -Supplement 3 Florida Power & Light Company (FPL) submitted a subsequent license renewal application (SLRA) for Turkey Point Units 3 and 4 to the NRG on January 30, 2018 (Reference 1) and supplemented the SLRA by References 2, 3, and 4. FPL committed in FPL Letter L-2018-059 (Reference 4) to provide a revised submittal that includes a complete version of.the SLRA incorporating the changes to the affected SLRA Enclosures identified in SLRA Supplements 1, 2, and 3 prior to the end of the NRG acceptance review period. Revision 1 incorporates the changes identified in References 2, 3, and 4 into the SLRA, addresses inconsistencies found in the Revision O of the application and includes some additional clarifications in several specific areas. These changes are identified by a revision bar in the application and enclosures. Revision 1 of the SLRA consists of 5 Enclosures included on optical storage media (OSM):
: 1. FPL Letter L-2018-004 to NRG dated January 30, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application  
: 2. FPL Letter L-2018-039 to NRG dated February 9, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application  
-Supplement 1 3. FPL Letter L-2018-053 to NRG dated February 16, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application  
-Supplement 2 4. FPL Letter L-2018-059 to NRG dated March 1, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application  
-Supplement 3 Florida Power & Light Company (FPL) submitted a subsequent license renewal application (SLRA) for Turkey Point Units 3 and 4 to the NRG on January 30, 2018 (Reference  
: 1) and supplemented the SLRA by References 2, 3, and 4. FPL committed in FPL Letter L-2018-059 (Reference  
: 4) to provide a revised submittal that includes a complete version of.the SLRA incorporating the changes to the affected SLRA Enclosures identified in SLRA Supplements 1, 2, and 3 prior to the end of the NRG acceptance review period. Revision 1 incorporates the changes identified in References 2, 3, and 4 into the SLRA, addresses inconsistencies found in the Revision O of the application and includes some additional clarifications in several specific areas. These changes are identified by a revision bar in the application and enclosures.
Revision 1 of the SLRA consists of 5 Enclosures included on optical storage media (OSM):
* Enclosure 1: Turkey Point Subsequent License Renewal Application Enclosure Summary
* Enclosure 1: Turkey Point Subsequent License Renewal Application Enclosure Summary
* Enclosure 2: Applications for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390
* Enclosure 2: Applications for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390
* Enclosure 3: Turkey Point Nuclear Plant Units 3 and 4 Subsequent License Renewal Application (Public Version)
* Enclosure 3: Turkey Point Nuclear Plant Units 3 and 4 Subsequent License Renewal Application (Public Version)
* Enclosure 4: Non-proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)
* Enclosure 4: Non-proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)
* Enclosure 5: 10 CFR 2.390 Withheld Proprietary Documents Florida Power & Light Company 700 Universe Boulevard, Juno Beach, FL 33408 OSM Enclosure 5 contains information requested to be withheld from public disclosure under 10 CFR 2.390 Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-082 Page 2 If you have any questions, or need additional information, please contact William Maher, Senior Licensing Director, at 561-691-2294. I declare under penalty of perjury that the foregoing is true and correct. Executed on April 10, 2018. Sincerely, William D. Maher Senior Licensing Director Florida Power & Light Company WDM/SF Enclosed OSM 1. Public Version of the SLRA 2. Nonpublic Version of the SLRA (includes information to be withheld under 10 CFR 2.390) cc: (w/o Enclosed OSM) Regional Administrator, USNRC, Region II Project Manager, USNRC, Turkey Point Nuclear Plant Project Manager, USNRC, SLRA Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant Project Manager, USNRC, SLRA Environment Ms. Cindy Becker, Florida Department of Health}}
* Enclosure 5: 10 CFR 2.390 Withheld Proprietary Documents Florida Power & Light Company 700 Universe Boulevard, Juno Beach, FL 33408 OSM Enclosure 5 contains information requested to be withheld from public disclosure under 10 CFR 2.390 Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-082 Page 2 If you have any questions, or need additional information, please contact William Maher, Senior Licensing Director, at 561-691-2294.
I declare under penalty of perjury that the foregoing is true and correct. Executed on April 10, 2018. Sincerely, William D. Maher Senior Licensing Director Florida Power & Light Company WDM/SF Enclosed OSM 1. Public Version of the SLRA 2. Nonpublic Version of the SLRA (includes information to be withheld under 10 CFR 2.390) cc: (w/o Enclosed OSM) Regional Administrator, USNRC, Region II Project Manager, USNRC, Turkey Point Nuclear Plant Project Manager, USNRC, SLRA Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant Project Manager, USNRC, SLRA Environment Ms. Cindy Becker, Florida Department of Health}}

Latest revision as of 09:56, 15 March 2019

Transmittal of Subsequent License Renewal Application Revision 1
ML18113A134
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/10/2018
From: Maher W D
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18113A132 List:
References
L-2018-082
Download: ML18113A134 (2)


Text

OSM Enclosure 5 contains information requested to be withheld from public disclosure under 10 CFR 2.390

-Revision 1

References:

1. FPL Letter L-2018-004 to NRG dated January 30, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application
2. FPL Letter L-2018-039 to NRG dated February 9, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application

-Supplement 1 3. FPL Letter L-2018-053 to NRG dated February 16, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application

-Supplement 2 4. FPL Letter L-2018-059 to NRG dated March 1, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application

-Supplement 3 Florida Power & Light Company (FPL) submitted a subsequent license renewal application (SLRA) for Turkey Point Units 3 and 4 to the NRG on January 30, 2018 (Reference

1) and supplemented the SLRA by References 2, 3, and 4. FPL committed in FPL Letter L-2018-059 (Reference
4) to provide a revised submittal that includes a complete version of.the SLRA incorporating the changes to the affected SLRA Enclosures identified in SLRA Supplements 1, 2, and 3 prior to the end of the NRG acceptance review period. Revision 1 incorporates the changes identified in References 2, 3, and 4 into the SLRA, addresses inconsistencies found in the Revision O of the application and includes some additional clarifications in several specific areas. These changes are identified by a revision bar in the application and enclosures.

Revision 1 of the SLRA consists of 5 Enclosures included on optical storage media (OSM):

  • Enclosure 2: Applications for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390
  • Enclosure 4: Non-proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)
  • Enclosure 5: 10 CFR 2.390 Withheld Proprietary Documents Florida Power & Light Company 700 Universe Boulevard, Juno Beach, FL 33408 OSM Enclosure 5 contains information requested to be withheld from public disclosure under 10 CFR 2.390 Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-082 Page 2 If you have any questions, or need additional information, please contact William Maher, Senior Licensing Director, at 561-691-2294.

I declare under penalty of perjury that the foregoing is true and correct. Executed on April 10, 2018. Sincerely, William D. Maher Senior Licensing Director Florida Power & Light Company WDM/SF Enclosed OSM 1. Public Version of the SLRA 2. Nonpublic Version of the SLRA (includes information to be withheld under 10 CFR 2.390) cc: (w/o Enclosed OSM) Regional Administrator, USNRC, Region II Project Manager, USNRC, Turkey Point Nuclear Plant Project Manager, USNRC, SLRA Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant Project Manager, USNRC, SLRA Environment Ms. Cindy Becker, Florida Department of Health