| | number = ML13197A399 | | | number = ML13197A399 |
| | issue date = 06/19/2013 | | | issue date = 06/19/2013 |
| | title = 2013/06/19 NRR E-mail Capture - Prairie Island and Monticello - Draft RAI 2013 Decommissioning Funding Status Reports Submittal | | | title = Prairie Island and Monticello - Draft RAI 2013 Decommissioning Funding Status Reports Submittal |
| | author name = Wengert T J | | | author name = Wengert T J |
| | author affiliation = NRC/NRR/DORL/LPLIII-1 | | | author affiliation = NRC/NRR/DORL/LPLIII-1 |
|
---|
Category:E-Mail
MONTHYEARML24254A3932024-08-26026 August 2024 SLRA - 2nd Round Request for Additional Information ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24185A0912024-07-0101 July 2024 Acceptance of LAR to Revise TS Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumptions in the Accident Analyses ML24131A0802024-05-10010 May 2024 Final RAI for LAR to Revise TS 3.8.6, Battery Parameters, SR 3.8.6.6 ML24116A2532024-04-25025 April 2024 Final Request for Additional Information for LAR to Revise SR 3.8.1.2 Note 3 (EPID: L- 2023-LLA-0135) ML24036A2462024-04-24024 April 2024 NRC to Fws, NRC Issuance of Draft Environmental Impact Statement for Monticello Subsequent License Renewal, Opportunity for Public Comment, and Endangered Species Act Determinations ML24092A2152024-03-27027 March 2024 Email: Requests for Information to Support Deis ML24068A0612024-03-0707 March 2024 Extension of Audit for License Amendment Request to Revise TS 3.8.6, Battery Parameters, SR 3.8.6.6 ML24064A1802024-03-0404 March 2024 Acceptance of Relief Request RR-017, Inservice Inspection (ISI) Impracticality During the Fifth Ten-Year Interval ML24045A1502024-02-15015 February 2024 Verbal Authorization for Alternative Relief Request-09 ML24045A0862024-02-12012 February 2024 Final RAI for Alternative RR-09 ML24036A0932024-02-0202 February 2024 Acceptance of License Amendment Request to Revise TS 5.6.5 and Update PTLR Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data ML24022A0212024-01-20020 January 2024 NRR E-mail Capture - Monticello - Request for Additional Information ISI RR-002 Alternative to Use IWB-2500(f) ML23353A0742023-12-19019 December 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Proposed Alternative VR-09, Modifications to OMN-17 ML23348A3462023-12-14014 December 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of License Amendment Request to Revise TS 3.8.6, Battery Parameters, SR 3.8.6.6 ML23348A3472023-12-12012 December 2023 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Minnesota Regarding a Prairie Island Nuclear Generating Plant, Units 1 & 2, Amendment ML23335A1152023-12-0101 December 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Request for Additional Information LAR to Revise TS 3.7.8 Required Actions ML23312A0882023-11-0808 November 2023 Acceptance of Request to Revise Alternatives 1-RR-5-10 and 2-RR-5-10 ML23268A0292023-09-20020 September 2023 SLRA - Requests for Confirmation of Information - Set 2 - Email from Marieliz Johnson to Shawn Hafen ML23249A2092023-09-0606 September 2023 NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX) ML23248A3462023-09-0505 September 2023 NRR E-mail Capture - Request for Additional Information for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant - Decommissioning Funding Status Reports ML23237A4822023-08-25025 August 2023 SLRA - Request for Additional Information - Set 3 - Email from Marieliz Johnson to Shawn Hafen ML23228A1212023-08-16016 August 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Alternative Request VR-11 for MO-2397 ML23227A2182023-08-15015 August 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Alternative Request RR-002 to Use IWB-2500(f) ML23219A1072023-08-0707 August 2023 SLRA - Requests for Additional Information - Set 2 - Email from Marieliz Johnson to Shawn Hafen ML23207A1962023-07-26026 July 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Acceptance of Requested Licensing Action Request to Revise Technical Specification 3.7.8 Required Actions ML23200A3502023-07-19019 July 2023 SLRA - Requests for Additional Information - Set 1 - Email from Marieliz Johnson to Christopher Domingos ML23172A1122023-06-21021 June 2023 SLRA - Requests for Confirmation of Information - Set 1 - Email from Marieliz Johnson to Christopher Domingos ML23075A2802023-03-16016 March 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Acceptance of Relief Requests 1-RR-5-15 and 2-RR-5-15 to Use Subsequent ASME Code Edition and Addenda ML23065A0592023-02-27027 February 2023 NRR E-mail Capture - (External_Sender) Prairie Island Request for Pre-application Meeting for Proposed LAR to Change TS 3.7.8, Condition B Required Actions ML23054A3322023-02-23023 February 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Relief Request to Use Later Edition of ASME BPV Code, Section XI, for ISI Program Code of Record ML23053A1362023-02-13013 February 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Relief Request to Use Later Edition of ASME BPV Code, Section XI, for Cisi Program ML23018A2952023-01-18018 January 2023 Acceptance of Requested Licensing Action to Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) (EPID L-2022-LLA-0184) (Email) ML23017A2222023-01-13013 January 2023 Verbal Authorization of Proposed Alternative PR-08 Regarding Inservice Testing Requirements of Certain High Pressure Coolant Injection System Components (EPID L-2022-LLR-0088) (Email) ML23004A1982023-01-0404 January 2023 NRR E-mail Capture - Draft Request for Additional Information Monticello Nuclear Generating Plant Request Pr 08, HPCI Pump Quarterly Testing ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package ML22175A1602022-06-24024 June 2022 NRR E-mail Capture - RAI Monticello Fuel Oil Storage Tank Inspection ML22181A1962022-06-24024 June 2022 NRR E-mail Capture - Draft RAI Monticello Alternative VR-08 ML22167A0452022-06-16016 June 2022 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Request to Adopt TSTF-277 ML22166A4112022-06-15015 June 2022 NRR E-mail Capture - Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-08, PIV Leakage ML22160A6022022-06-0909 June 2022 NRR E-mail Capture - Draft Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, 24-Month Operating Cycle Amendment ML22131A2652022-05-11011 May 2022 NRR E-mail Capture - Request for Additional Information Xcel Energy Amendment Request to Create a Common Eplan and EOF for Monticello and Prairie Island ML22123A2822022-05-0303 May 2022 NRR E-mail Capture - Request for Additional Information Monticello Alternative VR-10, EFCV Testing Frequency ML22101A0712022-04-11011 April 2022 NRR E-mail Capture - Monticello - Acceptance of Requested Licensing Action License Amendment Request to Revise TS 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency ML22089A1302022-03-30030 March 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Alternative Related Excess Flow Check Valve Testing Frequency ML22082A1812022-03-23023 March 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of VR-08 Alternative to Adopt ASME OM Code Case OMN-28 ML22075A2612022-03-16016 March 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of VR-07 Alternative Related to MOV Testing Per ASME OM Code Case OMN-26 ML22067A2032022-03-0808 March 2022 Audit Plan to Support Review of an Amendment to Transition to Atrium 11 Fuel (Redacted) ML22045A4972022-02-14014 February 2022 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Unit 2 - Acceptance of Alternative Request Alternative Related PIV Leakage Monitoring ML22011A0642022-01-11011 January 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Licensing Action License Amendment Request to Support Diesel Generator Fuel Oil Storage Tank Inspection 2024-08-05
[Table view] |
Text
1 NRR-PMDAPEm Resource From: Wengert, Thomas Sent: Wednesday, June 19, 2013 3:20 PM To: 'Sueper, Leonard L.'
Cc:Beltz, Terry; Turtil, Richard
Subject:
Prairie Island and Monticello - Draft RAI RE
- 2013 Decommissioning Funding Status Reports Submittal Attachments:
NSPM - Draft RAI Concerning 2013 DFS Reports.pdfMr. Sueper, By letter dated March 22, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13126A114), Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) Reports for Montic ello Nuclear Generating Plant (MNGP) and Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) 50.75(f)(1).
Attached is a draft request for additional information (RAI) concerning this submittal. Please review the draft RAI and let me know if NSPM/Xcel Energy would like to have a conference call with the NRC staff to clarify this request. Also, let's discuss the schedule for NSPM's response.
- Regards,
Tom Wengert Project Manager - Prairie Island NRR/DORL/LPL3-1
(301) 415-4037
Hearing Identifier: NRR_PMDA Email Number: 763 Mail Envelope Properties (152162585FEC2544A53A3A2FB234832B5A5CDFDA53)
Subject:
Prairie Island and Monticello - Draft RAI RE: 2013 Decommissioning Funding Status Reports Submittal Sent Date: 6/19/2013 3:20:13 PM Received Date: 6/19/2013 3:20:00 PM From: Wengert, Thomas Created By: Thomas.Wengert@nrc.gov Recipients: "Beltz, Terry" <Terry.Beltz@nrc.gov> Tracking Status: None "Turtil, Richard" <Richard.Turtil@nrc.gov> Tracking Status: None "'Sueper, Leonard L.'" <Leonard.Sueper@xenuclear.com> Tracking Status: None Post Office: HQCLSTR02.nrc.gov
Files Size Date & Time MESSAGE 958 6/19/2013 3:20:00 PM NSPM - Draft RAI Concerning 2013 DFS Reports.pdf 96184 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION (RAI)
CONCERNING 2013 DECOMMISSIONING FUNDING STATUS REPORTS NORTHERN STATES POWER COMPANY - MINNESOTA MONTICELLO NUCLEAR GENERATING PLANT UNIT 1 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 DOCKET NOS. 50-263, 50-282, AND 50-306 By letter dated March 22, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13126A114), Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) Reports for Monticello Nuclear Generating Plant (MNGP) and Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) 50.75(f)(1). The NRC staff has determined that the following information is needed to complete its review:
RAI #1 for PINGP, Units 1 and 2, and Monticello: Amounts accumulated
Confirm that the amount of decommissioning funds identified in the March 22, 2013, submittal represents the after-tax amounts of decommissioning funds accumulated through December 31, 2012. If not, please provide the after-tax amounts of decommissioning funds accumulated through December 31, 2012, for PINGP, Units 1 and 2, and MNGP.
On March 22, 2013, NSPM reported the amounts of decommissioning funds accumulated as of December 31, 2012, for PINGP 1 and 2, and MNGP, but did not indicate whether the amounts stated represent the before or after-tax balances.
The provisions of 10 CFR 50.75(f)(1) and (2) require the licensee to report the amount of funds accumulated to the end of the calendar year preceding the report.