|
|
Line 2: |
Line 2: |
| | number = ML14162A376 | | | number = ML14162A376 |
| | issue date = 06/10/2014 | | | issue date = 06/10/2014 |
| | title = 2014/06/10 NRR E-mail Capture - Fort Calhoun Request for Additional Information Regarding License Amendment to Revise Method for Controlling Raw Water Intake Cell Level During Floods (MF2591) | | | title = Fort Calhoun Request for Additional Information Regarding License Amendment to Revise Method for Controlling Raw Water Intake Cell Level During Floods (MF2591) |
| | author name = Rankin J | | | author name = Rankin J |
| | author affiliation = NRC/NRR/DORL | | | author affiliation = NRC/NRR/DORL |
Line 13: |
Line 13: |
| | document type = E-Mail | | | document type = E-Mail |
| | page count = 3 | | | page count = 3 |
| | | project = |
| | | stage = RAI |
| }} | | }} |
|
| |
|
Revision as of 18:04, 7 February 2019
|
---|
Category:E-Mail
MONTHYEARML24289A2052024-10-0909 October 2024 E-mail with Responses to Clarification Questions on Response to Request for Additional Information on the Phase 1 Final Status Survey Reports ML24025A1792024-01-23023 January 2024 State Consultation Response e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment– (License No. DPR-40, Docket No. 50-285) ML24024A2242024-01-22022 January 2024 State Consultation e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment- (License No. DPR-40, Docket No. 50-285) ML23311A0862023-11-0505 November 2023 Letter to M Morales Re Ft Calhoun License Termination Section 7 Determination for Ipac 2022-0029456 ML23038A1882023-01-31031 January 2023 Request for Additional Time to Respond to Request for Additional Information on License Amendment Request for Approval of License Termination Plan (License No. DPR-40, Docket No. 50-285) ML22222A1192022-08-0808 August 2022 Email Section 106 NHPA- Ft Calhoun Station License Termination Plan ML21069A2482021-03-10010 March 2021 Umax, 07200054, 05000361, 05000362, FSAR Revision 4 for San Onofre ISFSI ML21335A3352021-01-25025 January 2021 January 25, 2021 e-mail from J. Parrott, NRC to C. Cameron, OPPD Use of Resrad Model to Represent Well Water Concentrations in a Basement Substructure (License No. DPR-40, Docket No. 50-285) ML20204B0782020-07-22022 July 2020 Donna Gilmore Email Holtec Umax Materials (07200054, 05000361, 05000362) ML20113F0622020-04-22022 April 2020 E-mail Results of Acceptance Review of OPPD Request for Exemption from 10 CFR 20, App G, Section Iii.E (License No. DPR-40, Docket No. 50-285) ML20100J2272020-03-26026 March 2020 E-mail Notification to the State of Nebraska on the Issuance of the License Amendment for Revised Security Plans to Reflect an ISFSI-only Configuration (License No. DPR-40, Docket Nos. 50-285 and 72-54) ML20100L7232020-03-15015 March 2020 Email: Town of Desoto National Register of Historic Places Eligibility ML19353C3612019-12-11011 December 2019 E-mail to State of Nebraska Informing of the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status (License DPR-40, Docket Nos. 50-285 and 72-054) ML19309F1112019-10-11011 October 2019 ISFSI-Only Tech Specs ML19241A1812019-08-21021 August 2019 Request for Additional Information on Proposed Changes to the FCS Emergency Plan and Emergency Action Level Scheme to Reflect an ISFSI-only Status ML19175A0212019-06-19019 June 2019 Acceptance Review - License Amendment Request to Revise Security and Safeguards Requirements to Reflect ISFSI-Only Configuration ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19126A2802019-05-0101 May 2019 Acceptance Review - License Amendment Request for ISFSI-Only EP and EAL Scheme ML18100A2712018-04-0909 April 2018 04-09-18 OPPD E-Mail (FCS Permanently Defueled Emergency Plan Implementation) ML17236A3462017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Permanently Defueled TS (MF9567) ML17236A3442017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Exemption from 10 CFR 140.11(a)(4), Off-site Primary and Secondary Liability Insurance (MF9664) ML17234A4692017-08-22022 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Removal of Dry Cask Loading Limits (MF9831) ML17194A9732017-07-13013 July 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Ultimate Strength Design for Aux. Bldg LAR (MF8525) ML17191B0212017-07-10010 July 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review of Modification of LC 3.C to Delete Commission-approved CSP ML17184A0042017-06-30030 June 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review of Removal of Dry Cask Loading Limits ML17139C8342017-05-19019 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Partial Exemption from Record Retention Requirements ML17139C5082017-05-19019 May 2017 NRR E-mail Capture - (External_Sender) Need Corrected Page 6 for LIC-17-0043 ML17144A0132017-05-19019 May 2017 NRR E-mail Capture - Fort Calhoun PSDAR - Findings and Concerns ML17142A0202017-05-19019 May 2017 NRR E-mail Capture - (External_Sender) Need Corrected Page 6 to TQ-DC-FC-101 ML17139B6762017-05-18018 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 140.11(a)(4), Off-Site Liability Insurance ML17139B6782017-05-18018 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 50.54(w)(1), On-Site Property Damage Insurance ML17136A1692017-05-16016 May 2017 NRR E-mail Capture - (External_Sender) OPPD FCS Decommissioning Financial Reports ML17115A4722017-04-25025 April 2017 NRR E-mail Capture - (External_Sender) Corrected Page 18 to TQ-DC-FC-201 ML17114A3112017-04-24024 April 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review TS Changes to Align for Decommissioning ML17112A0362017-04-20020 April 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Permanently Defueled EP and EAL Scheme Change LAR ML17090A3942017-03-31031 March 2017 NRR E-mail Capture - Fort Calhoun - Final RAI Regarding Administrative Control TS Change LAR (MF8437) ML17082A0022017-03-22022 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning Exemption ML17081A0192017-03-21021 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Proposed Emergency Planning Exemption ML17052A0272017-02-15015 February 2017 NRR E-mail Capture - Fort Calhoun Station, Unit No. 1 - Acceptance of Requested Amendment Revise Permanently Defueled Emergency Plan and EAL Scheme ML17033A9692017-02-0202 February 2017 NRR E-mail Capture - Fort Calhoun Station - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment ML16351A0432016-12-15015 December 2016 NRR E-mail Capture - (External_Sender) Fort Calhoun Station Offsite Response Organizations ML16350A0392016-12-15015 December 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8858) Fort Calhoun, Unit 1 - License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program ML16334A3002016-11-29029 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8525) Fort Calhoun, Unit 1 - License Amendment Request LAR-16-04 to Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements ML16333A2312016-11-28028 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8843)Fort Calhoun, Unit 1, Request for Rescission of Interim Compensatory Measure B.1.a from EA-02-026, Order for Interim Safeguards and Security Compensatory Measures. ML16333A0992016-11-28028 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8452), Fort Calhoun, Unit 1 - Request for Exemption from Specific Provisions in 10 CFR 73.55 ML16286A0812016-10-12012 October 2016 NRR E-mail Capture - Acceptance Review Fort Calhoun Station, Unit 1, License Amendment Request 16-03, Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning ML16278A0292016-10-0303 October 2016 NRR E-mail Capture - Acceptance Review Fort Calhoun Station Radiological Emergency Response Plan (RERP) for Decommissioning ML16257A0262016-09-12012 September 2016 NRR E-mail Capture - (External_Sender) OPPD Slides for 9/13/16 Pre-Application Meeting on Class 1 Structures ML16207A0182016-07-22022 July 2016 NRR E-mail Capture - Acceptance Review ML16137A0092016-05-16016 May 2016 NRR E-mail Capture - Acceptance Review CAC No. MF7574 2024-10-09
[Table view] |
Text
1 NRR-PMDAPEm Resource From: Rankin, Jennivine Sent: Tuesday, June 10, 2014 3:55 PM To: medwards@oppd.com; BHansher@oppd.com Cc: Sebrosky, Joseph
Subject:
Fort Calhoun request for additional information regarding license amendment to revise method for controlling raw water intake cell level during floods (MF2591)Mr. Hansher and Mr. Edwards, By letter dated August 13, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13231A178) Omaha Public Power District (OPPD) submitted a license amendment application to revise the method for controlling raw water intake cell level during floods. The U.S. NRC staff
has reviewed the information provided in your August 13, 2013, license amendment request and determined that additional information is required in order to complete its review. These requests for additional information (RAIs) can be found below.
A draft RAI was transmitted on June 5 and 6, 2014, and it was determined by OPPD that a clarification call was not needed.
Please provide a response to these RAIs by July 11, 2014. Should the NRC determine that the RAIs found below are no longer necessary prior to the dates found above, the request will be withdrawn. Please contact me if circumstances result in the need to revise the requested response date. Please treat this e-mail as
formal transmittal of the RAIs.
Sincerely, Jennie Rankin Project Manager Nuclear Regulatory Commission Division of Operating Reactor Licensing jennivine.rankin@nrc.gov 301-415-1530 REQUEST FOR ADDITIONAL INFORMATION ON LICENSE AMENDMENT FOR REVISING THE METHOD FOR CONTROLLING RAW WATER INTAKE CELL LEVEL FORT CALHOUN STATION OMAHA PUBLIC POWER DISTRICT DOCKET NO. 50-285 (Balance of Plant Branch) SBPB RAI 6 The new intake cell flood water inlet valves are classified as Safety Class 3. As stated in Appendix N of the Updated Safety Analysis Report (USAR), Safety Class 3 corresponds to the USA Standard B31.7 Class III or American Society of Mechanical EngineersSection III Class 3 equipment design codes. The design conditions for Class 3 piping contained in these codes include a requirement to consider the effects of seismic events. Additionally, USAR Appendix N states that Safety Class 1, 2, and 3 equipment is considered to be Seismic Category I. Section 3.6 of the License Amendment Request (LAR) states that the intake cell flood water inlet valves are not required to be seismically qualified or seismically supported. Provide justification for the discrepancy between the equipment code requirements and the intake cell flood water inlet valve design.
2PRA Operations and Human Factors Branch (APHB) RAI 1 List and describe the procedure revisions required to support the LAR.
APHB RAI 2 Describe the training that will be provided to support the LAR and the audience for the training.
APHB RAI 3 Describe the alarms, displays, and controls that operators will use to accomplish the proposed actions.
APHB RAI 4 Describe the method(s) that will be used to validate that the actions are feasible, reliable, and can be completed in the time available.
Hearing Identifier: NRR_PMDA Email Number: 1354 Mail Envelope Properties (Jennivine.Rankin@nrc.gov20140610155500)
Subject:
Fort Calhoun request for additional information regarding license amendment to revise method for controlling raw water intake cell level during floods (MF2591) Sent Date: 6/10/2014 3:55:02 PM Received Date: 6/10/2014 3:55:00 PM From: Rankin, Jennivine Created By: Jennivine.Rankin@nrc.gov Recipients: "Sebrosky, Joseph" <Joseph.Sebrosky@nrc.gov> Tracking Status: None "medwards@oppd.com" <medwards@oppd.com> Tracking Status: None "BHansher@oppd.com" <BHansher@oppd.com>
Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2993 6/10/2014 3:55:00 PM
Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: