ML090200091: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Attachment 6  OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Rev 0  Facility: RB First Exam Date:11/21/2008 Written Exam Outline (Date) Comment Resolution 1 Put revision number on all forms. Done. 2 Add "RO" to title of written exam outline Done.
3 Tier 3 - RO:  K/A's 2.2.12 and 2.3.11 were on both the 2004 and 2007 NRC exams. Randomly select different K/A's.
Done. Re-selected KA 2.2.3 and 2.3.7.
4 For the K3's that were oversampled, add "in T2G1" for clarification. "K3's were oversampled in T2G1 while K5 -"
Done. 5 The bottom entry of ES-401-4 has the E/APE designator of 295022. This should be 295002.
Done. 6 Reword the reason for rejection of T3 G.2.2.5. RBS surely considers knowledge of the process for making design or operating changes to the
 
facility important - maybe not for RO's?
Done.      Administrative JPM Outline (9/3/08) Comment Resolution 1 Use "A" designators (A1, A2, etc) Done.
2 Is SRO Conduct of Ops "Determine Alt. DHR method" a repeat from 2004 NRC
 
exam? Yes. For resolution, see comment #3 below.
3 SRO - K/A 2.1.25 has been used on last two NRC exams. Select another K/A.
This exam will be the second time it has been used on the RO exam (don't select it for the next NRC exam).
Done. Selected KA 2.1.20. Completion of GOP-0004 calculations when entering Single Loop Operation for SRO exam.
No change to RO exam. Will not use it next
 
exam.
Attachment 6  OBDI 202 - IOLE Process Control Room / In-Plant System JPM Outline (Date) Comment Resolution 1 Use "C" "S" and "P" designators (C for Control Room, S for Simulator, and P for
 
In-Plant JPMs)
Done. 2 Reduce CR JPMs from 4 to 2 Done. Eliminated the following control room JPMs  Shedding of DC Loads during a SBO  Resetting APRM power supplies.
Replaced with the following simulator JPMs:  Aligning Fuel Bldg Ventilation into Fuel Handling Lineup  Resetting a scram per AOP-0001. 3 Simplify JPM titles Done.
4 Have a backup "N" and "A" control room system JPM (minimum is 2)
Disregarded per chief examiner.
5 Have a backup "RCA" JPM (minimum is
: 1) Disregarded per chief examiner.
6 Have a backup "L" control room system JPM (minimum is 1) (SROU)
Disregarded per chief examiner. 7 What is HVK? (see JPM "d") Control Room Ventilation & Chilled Water 8 What is "IAS" and "SVV" (see JPM "i") Instrument Air System and Air supply to Safety Relief Valves Simulator Scenario Outline Comments (Date) Comment Resolution 1 Was facility-specific or industry-generic operating experience used in development of the scenarios? Not specifically during development, however many of the events have occurred in the
 
industry and at RBS  Single Rod scram (RBS)  Turbine failure due to MSRs not balanced (Nine Mile Point)  ATWS (Browns Ferry) 2 Was PRA used to identify risk-important operator actions? Loss of offsite power (Scenario 2) is highest contributor to core damage frequency.
Important Operator actions in PSA include:  Recovery of Offsite Power (Scenario 2)  Recovery of Feedwater (Scenario 1)  Start of suppression pool cooling (Scenario 1)
Also reviewed PRA prior to rejecting KAs with IR <2.5 to ensure those tasks were not considered important operator actions.
Attachment 6  OBDI 202 - IOLE Process 3 Simplify ES-301-5 form (we'll discuss) Re-submitting Rev 1 to ES-301-5 forms. Candidate names are removed. A separate form is completed for each combination of candidates for a total of 3 forms.
4 Scenario 2 - what is major event?  Also, convert to low power (<5%) scenario Outline was not annotated correctly major event is the Loss of offsite power.
 
The backup scenario outline has been changed to a low power scenario.
5 Scenario 3 - Event 2: APRM "F" upscale failure and Event 3: Single rod scram were a combined event on 2004 NRC exam and was a Tech Spec call. The APRM failure was also on the 2007 NRC exam - replace this event with another
 
TS event. Records indicate that the APRM F/Single rods scram failure was on the 2004 backup scenario which was not used. Per chief examiner, it is acceptable to use this malfunction on the 2008 exam.
 
6 Scenarios 1 no Tech Specs identified Done. 7 For each scenario, complete Target Quantitative Attributes from ES-301-4 (see D-1's from 2007 NRC exam) Originally misunderstood the comment. TQA are included on Revision 1 submission of
 
outline. 8 Scenario 2 - contains CRD pump trip.
The SRO written exam contains a question dealing with EOP mitigation strategies for this event. Select a different event or different KA on the written exam.
Done. Selected a different KA 295034 G 2.4.6.
"Knowledge of EOP mitigation strategies
 
regarding Secondary Containment Ventilation
 
High Radiation".
9 Backup scenario - event 8 has "UO" in the Event Type column - what is "UO?"
Done. UO = BOP Outline adjusted for consistency.
10 Both scenarios 1 and the backup have steam leaks as the Major Transient.
Explain the differences (operator actions, procedure usage, etc) to preclude repetitive scenarios. Scenario 1 is a leak in the drywell resulting in elevated containment parameters (EOP-2).
Backup scenariois a leak (failure to isolate) in the RCIC room which is in Secondary Containment (EOP-0003). Different strategies
 
used to combat the events.
11 When preparing Draft Op Test, identify all Tech Specs and action statement(s) in the D-2 for each TS call N/A 12 When preparing Draft Op Test, Critical Tasks must be carefully defined, including time limits where applicable.
N/A 13 When preparing Draft Op Test, identify all procedure transitions in the D-2's.
N/A Exam Outline Revision 1 Summary of Changes Written Exam Outlines
 
RO  Updated Revision Number (Comment #1)  Added "RO" to outline title (Comment #2)  Re-selected KA 2.2.3 & 2.3.7 (Comment #3)  Added "T2G1" for clarification on oversampled K3's (Comment #4)  Corrected E/APE designator from 295022 to 295002 (Comment #5)  Reworded reason for rejection of KA T3 G 2.2.5 (Comment #6)
SRO  Rejected 295022 G2.4.6 due to overlap w ith Operating Test. Re-selected 295034 G 2.4.6 (Comment #8 on Scenario Outline Comments)
 
Admin JPM Outlines Added "A" designators (Comment #1)  SRO Exam - Selected alternate KA for 2.1.25 due to use on previous 2 exams. New KA is 2.1.20 (Comment #2 & #3)
 
Control Room / In-Plant Systems Outlines Added "C, S, and P" designators (Comment #1)  Reduced Control Room JPMs from 4 to 2 (Comment #2)  Simplified JPM titles (Comment #3)
 
Simulator Scenario Outlines Identified Tech Spec events on each scenario outlin e (Comment #6)  Added Target Quantitative Attributes to each scenario (Comment #7)  Backup scenario contain reference to "
UO". Changed to "BOP" for consistency (Comment #9)  Scenario 2 did not have a Major event identified. Major event is Loss of Offsite Power. It is now annotated correctly. (Comment #4)  Changed backup scenario to a low power scenario (Comment #4)  Scenario 3 - Changed MSS-MOV111/112 failures. As originally submitted, these failures brought in no alarms and did not change plant conditions enough to be noticed by the crew. Remove these failures and replaced with Isophase Bus Duct Cooling Fan 1 & 2 failures. This change does not affect the Transient and Event Checklist.}}

Revision as of 05:39, 20 September 2018

River Bend-2008-12-Draft Outline Comments
ML090200091
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/21/2008
From:
- No Known Affiliation
To:
NRC Region 4
References
Download: ML090200091 (4)


Text

Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Rev 0 Facility: RB First Exam Date:11/21/2008 Written Exam Outline (Date) Comment Resolution 1 Put revision number on all forms. Done. 2 Add "RO" to title of written exam outline Done.

3 Tier 3 - RO: K/A's 2.2.12 and 2.3.11 were on both the 2004 and 2007 NRC exams. Randomly select different K/A's.

Done. Re-selected KA 2.2.3 and 2.3.7.

4 For the K3's that were oversampled, add "in T2G1" for clarification. "K3's were oversampled in T2G1 while K5 -"

Done. 5 The bottom entry of ES-401-4 has the E/APE designator of 295022. This should be 295002.

Done. 6 Reword the reason for rejection of T3 G.2.2.5. RBS surely considers knowledge of the process for making design or operating changes to the

facility important - maybe not for RO's?

Done. Administrative JPM Outline (9/3/08) Comment Resolution 1 Use "A" designators (A1, A2, etc) Done.

2 Is SRO Conduct of Ops "Determine Alt. DHR method" a repeat from 2004 NRC

exam? Yes. For resolution, see comment #3 below.

3 SRO - K/A 2.1.25 has been used on last two NRC exams. Select another K/A.

This exam will be the second time it has been used on the RO exam (don't select it for the next NRC exam).

Done. Selected KA 2.1.20. Completion of GOP-0004 calculations when entering Single Loop Operation for SRO exam.

No change to RO exam. Will not use it next

exam.

Attachment 6 OBDI 202 - IOLE Process Control Room / In-Plant System JPM Outline (Date) Comment Resolution 1 Use "C" "S" and "P" designators (C for Control Room, S for Simulator, and P for

In-Plant JPMs)

Done. 2 Reduce CR JPMs from 4 to 2 Done. Eliminated the following control room JPMs Shedding of DC Loads during a SBO Resetting APRM power supplies.

Replaced with the following simulator JPMs: Aligning Fuel Bldg Ventilation into Fuel Handling Lineup Resetting a scram per AOP-0001. 3 Simplify JPM titles Done.

4 Have a backup "N" and "A" control room system JPM (minimum is 2)

Disregarded per chief examiner.

5 Have a backup "RCA" JPM (minimum is

1) Disregarded per chief examiner.

6 Have a backup "L" control room system JPM (minimum is 1) (SROU)

Disregarded per chief examiner. 7 What is HVK? (see JPM "d") Control Room Ventilation & Chilled Water 8 What is "IAS" and "SVV" (see JPM "i") Instrument Air System and Air supply to Safety Relief Valves Simulator Scenario Outline Comments (Date) Comment Resolution 1 Was facility-specific or industry-generic operating experience used in development of the scenarios? Not specifically during development, however many of the events have occurred in the

industry and at RBS Single Rod scram (RBS) Turbine failure due to MSRs not balanced (Nine Mile Point) ATWS (Browns Ferry) 2 Was PRA used to identify risk-important operator actions? Loss of offsite power (Scenario 2) is highest contributor to core damage frequency.

Important Operator actions in PSA include: Recovery of Offsite Power (Scenario 2) Recovery of Feedwater (Scenario 1) Start of suppression pool cooling (Scenario 1)

Also reviewed PRA prior to rejecting KAs with IR <2.5 to ensure those tasks were not considered important operator actions.

Attachment 6 OBDI 202 - IOLE Process 3 Simplify ES-301-5 form (we'll discuss) Re-submitting Rev 1 to ES-301-5 forms. Candidate names are removed. A separate form is completed for each combination of candidates for a total of 3 forms.

4 Scenario 2 - what is major event? Also, convert to low power (<5%) scenario Outline was not annotated correctly major event is the Loss of offsite power.

The backup scenario outline has been changed to a low power scenario.

5 Scenario 3 - Event 2: APRM "F" upscale failure and Event 3: Single rod scram were a combined event on 2004 NRC exam and was a Tech Spec call. The APRM failure was also on the 2007 NRC exam - replace this event with another

TS event. Records indicate that the APRM F/Single rods scram failure was on the 2004 backup scenario which was not used. Per chief examiner, it is acceptable to use this malfunction on the 2008 exam.

6 Scenarios 1 no Tech Specs identified Done. 7 For each scenario, complete Target Quantitative Attributes from ES-301-4 (see D-1's from 2007 NRC exam) Originally misunderstood the comment. TQA are included on Revision 1 submission of

outline. 8 Scenario 2 - contains CRD pump trip.

The SRO written exam contains a question dealing with EOP mitigation strategies for this event. Select a different event or different KA on the written exam.

Done. Selected a different KA 295034 G 2.4.6.

"Knowledge of EOP mitigation strategies

regarding Secondary Containment Ventilation

High Radiation".

9 Backup scenario - event 8 has "UO" in the Event Type column - what is "UO?"

Done. UO = BOP Outline adjusted for consistency.

10 Both scenarios 1 and the backup have steam leaks as the Major Transient.

Explain the differences (operator actions, procedure usage, etc) to preclude repetitive scenarios. Scenario 1 is a leak in the drywell resulting in elevated containment parameters (EOP-2).

Backup scenariois a leak (failure to isolate) in the RCIC room which is in Secondary Containment (EOP-0003). Different strategies

used to combat the events.

11 When preparing Draft Op Test, identify all Tech Specs and action statement(s) in the D-2 for each TS call N/A 12 When preparing Draft Op Test, Critical Tasks must be carefully defined, including time limits where applicable.

N/A 13 When preparing Draft Op Test, identify all procedure transitions in the D-2's.

N/A Exam Outline Revision 1 Summary of Changes Written Exam Outlines

RO Updated Revision Number (Comment #1) Added "RO" to outline title (Comment #2) Re-selected KA 2.2.3 & 2.3.7 (Comment #3) Added "T2G1" for clarification on oversampled K3's (Comment #4) Corrected E/APE designator from 295022 to 295002 (Comment #5) Reworded reason for rejection of KA T3 G 2.2.5 (Comment #6)

SRO Rejected 295022 G2.4.6 due to overlap w ith Operating Test. Re-selected 295034 G 2.4.6 (Comment #8 on Scenario Outline Comments)

Admin JPM Outlines Added "A" designators (Comment #1) SRO Exam - Selected alternate KA for 2.1.25 due to use on previous 2 exams. New KA is 2.1.20 (Comment #2 & #3)

Control Room / In-Plant Systems Outlines Added "C, S, and P" designators (Comment #1) Reduced Control Room JPMs from 4 to 2 (Comment #2) Simplified JPM titles (Comment #3)

Simulator Scenario Outlines Identified Tech Spec events on each scenario outlin e (Comment #6) Added Target Quantitative Attributes to each scenario (Comment #7) Backup scenario contain reference to "

UO". Changed to "BOP" for consistency (Comment #9) Scenario 2 did not have a Major event identified. Major event is Loss of Offsite Power. It is now annotated correctly. (Comment #4) Changed backup scenario to a low power scenario (Comment #4) Scenario 3 - Changed MSS-MOV111/112 failures. As originally submitted, these failures brought in no alarms and did not change plant conditions enough to be noticed by the crew. Remove these failures and replaced with Isophase Bus Duct Cooling Fan 1 & 2 failures. This change does not affect the Transient and Event Checklist.