MONTHYEARWO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations WO 23-0009, Financial Protection Levels2023-03-31031 March 2023 Financial Protection Levels WO 22-0056, Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082022-12-19019 December 2022 Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 22-0021, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2022-08-29029 August 2022 Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report WO 22-0015, Generation Station - Guarantee of Payment of Deferred Premiums2022-05-0606 May 2022 Generation Station - Guarantee of Payment of Deferred Premiums WO 22-0011, Operating Corp., Financial Protection Levels2022-03-29029 March 2022 Operating Corp., Financial Protection Levels WO 22-0007, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-0909 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations WO 21-0064, Operating Corporation, Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082021-12-29029 December 2021 Operating Corporation, Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 21-0031, (Wcgs), Supplement to One-Time Request for Exemption from the Biennial Emergency Preparedness2021-08-12012 August 2021 (Wcgs), Supplement to One-Time Request for Exemption from the Biennial Emergency Preparedness WO 21-0027, One-Time Request for Exemption from the Biennial Emergency Preparedness2021-07-29029 July 2021 One-Time Request for Exemption from the Biennial Emergency Preparedness WO 21-0015, License Amendment Request (LAR) for Revision to the Emergency Plan2021-05-25025 May 2021 License Amendment Request (LAR) for Revision to the Emergency Plan WO 21-0020, Operating Corp - Guarantee of Payment of Deferred Premiums2021-05-0707 May 2021 Operating Corp - Guarantee of Payment of Deferred Premiums WO 21-0019, Operating Corp Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-14014 April 2021 Operating Corp Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations WO 21-0014, Financial Protection Levels2021-03-30030 March 2021 Financial Protection Levels WO 21-0010, Submittal of Revision 34 to Updated Safety Analysis Report2021-03-11011 March 2021 Submittal of Revision 34 to Updated Safety Analysis Report WO 21-0002, Notification of Readiness for Supplemental Inspection 927232021-01-28028 January 2021 Notification of Readiness for Supplemental Inspection 92723 WO 20-0058, Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082020-12-23023 December 2020 Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange2020-11-10010 November 2020 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange WO 20-0040, Corrected Revision 33 of the Wolf Creek Generating Station Updated Safety Analysis Report2020-07-23023 July 2020 Corrected Revision 33 of the Wolf Creek Generating Station Updated Safety Analysis Report WO 20-0048, Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating2020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating WO 20-0047, Guarantee of Payment of Deferred Premiums2020-05-0707 May 2020 Guarantee of Payment of Deferred Premiums WO 20-0029, License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2020-04-20020 April 2020 License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies WO 20-0024, Financial Protection Levels2020-03-31031 March 2020 Financial Protection Levels WO 19-0059, Docket No. 50-482: Wolf Creek Nuclear Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082019-12-23023 December 2019 Docket No. 50-482: Wolf Creek Nuclear Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 19-0033, License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System2019-08-29029 August 2019 License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System WO 19-0031, Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-08-0808 August 2019 Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 WO 19-0011, Financial Protection Levels2019-03-27027 March 2019 Financial Protection Levels WO 19-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-03-11011 March 2019 Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 WO 18-0045, Submittal of Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Revision to the Emergency Plan2018-11-19019 November 2018 Submittal of Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Revision to the Emergency Plan WO 18-0047, Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0036, Operating Corporation (WCNOC) - Notification of Readiness for Supplemental Inspection2018-08-15015 August 2018 Operating Corporation (WCNOC) - Notification of Readiness for Supplemental Inspection WO 18-0034, Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-08-0909 August 2018 Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0031, Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 12018-07-23023 July 2018 Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 WO 18-0016, License Amendment Request for Revision to the Emergency Plan2018-05-0909 May 2018 License Amendment Request for Revision to the Emergency Plan WO 18-0014, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-16016 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations WO 18-0015, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2018-04-0505 April 2018 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ...2018-01-15015 January 2018 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... WO 17-0093, License Amendment Request (LAR) for Revision to the Emergency Plan2017-12-19019 December 2017 License Amendment Request (LAR) for Revision to the Emergency Plan WO 17-0092, Request for Regulatory Conference (EA-17-149)2017-11-0808 November 2017 Request for Regulatory Conference (EA-17-149) WO 17-0065, Submittal of LER 17-S01-00 for Wolf Creek Nuclear Operating Corp., Regarding Contraband Introduced Into the Protected Area Boundary2017-10-10010 October 2017 Submittal of LER 17-S01-00 for Wolf Creek Nuclear Operating Corp., Regarding Contraband Introduced Into the Protected Area Boundary WO 17-0042, Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme2017-04-26026 April 2017 Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme WO 17-0041, Supplement to Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2017-04-20020 April 2017 Supplement to Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report WO 17-0033, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations.2017-04-17017 April 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations. WO 17-0023, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2017-03-27027 March 2017 Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report WO 17-0026, Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses2017-03-22022 March 2017 Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses WO 17-0013, Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme2017-03-16016 March 2017 Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme WO 17-0009, Revision 30 to Updated Safety Analysis Report2017-03-0909 March 2017 Revision 30 to Updated Safety Analysis Report WO 16-0068, Docket No. 50-482: Request for Regulatory Conference2016-12-21021 December 2016 Docket No. 50-482: Request for Regulatory Conference 2023-05-17
[Table view] |
Text
W0..LF CREEK 'NUCLEAR OPERATING CORPORATION June 6, 2012 Stephen E. Hedges Site Vice President WO 12-0049 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
- 1) Letter dated March 12, 2012 from E. J. Leeds and M. R. Johnson, USNRC, to M. W. Sunseri, WCNOC, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(0 Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident"
- 2) Letter WO 12-0044, dated May 9, 2012, from S. E. Hedges, WCNOC, to USNRC, "Wolf Creek Nuclear Operating Corporation's 60-day Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident"
Subject:
Docket No. 50-482: Wolf Creek Nuclear Operating Corporation 90-day Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident Gentlemen:
On March 12, 2012, the Nuclear Regulatory Commission (NRC) staff issued a 10 CFR 50.54(f) letter to Wolf Creek Nuclear Operating Corporation (WCNOC) (Reference 1). Enclosure 5 of Reference 1 contains specific Requested Actions and Requested Information associated with Recommendation 9.3, Emergency Preparedness. In accordance with 10 CFR 50.54(f),
addressees were requested to submit a written response to the information requests. of Reference 1 also provided requested due dates for written responses.
P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HC/VET JAOOvI oak-,
WO 12-0049 Page 2 of 3 In accordance with Enclosure 5 of Reference 1, on May 9, 2012, WCNOC submitted an alternative course of action for providing the requested information (Reference 2). The alternative course of action included revised information, due dates and the basis for those dates. As described in our alternative course of action, this letter transmits the responses to the following information requests from Reference 1.
" Enclosure 5, Communications request #2
" Enclosure 5, Staffing request #3
" Enclosure 5, Staffing request #4
- Enclosure 5, Staffing request #5 WCNOC's 90-day response required in Enclosure 5 of Reference 1 is included in Attachment I to this letter. The topics contained in Attachment I reflect the alternative course of action presented in Reference 2.
Regulatory commitments made by WCNOC in this response are identified in Attachment II to this letter. If you have any questions concerning this matter, please contact me at (620) 364-4190, or Mr. Gautam Sen at (620) 364-4175.
Sincerely, Step n E. Hedges SEH/rlt Attachments: I- Wolf Creek Nuclear Operating Corporation's 90-day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident II- List of Regulatory Commitments cc: E. E. Collins (NRC), w/a J. R. Hall (NRC), w/a E. J. Leeds (NRC), w/a N. F. O'Keefe (NRC), w/a Senior Resident Inspector (NRC), w/a
WO 12-0049 Page 3 of 3 STATE OF KANSAS )
SS COUNTY OF COFFEY )
Stephen E. Hedges, of lawful age, being first duly sworn upon oath says that he is Site Vice President of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
Stephen . e ges Site VicXPe ident SUBSCRIBED and sworn to before me this '"i/day of "0J- e ,2012.
Notary Public
- 4. 77;~)Th~,9 RHONDOA L.TIEMEVER
!OFFIC :McosMiSSION EXIRES,
,zmy Expiration Date ~4A2LtOi2~/ /4 ~2z2/V
-Attachment I to WO 12-0049 Page 1 of 2 Wolf Creek Nuclear Operating Corporation's 90-day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident Communications Request #2 - Describe any interim actions that have been taken or are planned to be taken to enhance existing communications systems power supplies until the communications assessment and the resultingactions are complete.
Actions Taken or Planned Estimated Completion Date
- 1. A review of on-site power block communications concluded that power Complete block communications issues are addressed by the current site paging system, which has dual power supplies, each supplied from independent safety related sources.
- 2. WCNOC has purchased 14 new satellite phones. The satellite Distribution and phones will be distributed to appropriate locations and prepared for preparation of use during emergency conditions. satellite phones:
9/15/2012 Staffing Request #3 - Identify how the augmented staff would be notified given degraded communications capabilities.
Actions Taken or Planned Estimated Completion Date
- 1. In accordance with current procedures, all Emergency Response Complete Organization (ERO) members will respond to their assigned facilities or a designated staging area when they become aware of a significant natural disaster that has resulted in widespread communication disruption (e.g. by direct observation, media reports or word-of-mouth).
Attachment I to WO 12-0049 Page 2 of 2 3,,
Staffing Request #4 - Identify the methods of access (e.g., roadways, navigable bodies of water and dockage, airlift, etc.) to the site that are expected to be available after a widespread large scale naturalevent.
Actions Taken or Planned Estimated Completion Date No specific actions taken or planned. N/A
- 1. Wolf Creek Generating Station (WCGS) is located in an area characterized by a checkerboard pattern of roads, normally crossing each other at approximately one mile intervals in the North-South and East-West directions. While not all roads follow this pattern, generally each road in the area surrounding WCGS is accessible using multiple alternate routes if a road surface or a bridge is unavailable due to a natural event. For example, the normal access route to WCGS from the West includes a causeway across a portion of the cooling lake. If this causeway were unavailable for use, an alternate route of about six miles would be required to get back to the normal access route. The plant entrance road is the only vehicle traffic access to WCGS. The nearest multiple-access intersection on the plant entrance road is approximately one mile from the plant entrance. If the portion of the plant access road leading to the plant entrance was unavailable to vehicle traffic due to a natural event, personnel responding to the event would be able to walk the approximate one mile distance to the plant.
Staffing Request #5 - Identify any interim actions that have been taken or are planned prior to the completion of the staffing assessment.
Actions Taken or Planned Estimated Completion Date None N/A
Attachment II to WO 12-0049 Page 1 of 1 LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Wolf Creek Nuclear Operating Corporation in this document. Any other statements in this letter are provided for information purposes and are not considered regulatory commitments. Please direct questions regarding these commitments to Mr. Gautam Sen, Manager Regulatory Affairs at Wolf Creek Generating Station, (620) 364-4175.
REGULATORY COMMITMENT DUE DATE Satellite phones will be distributed to appropriate locations and 9/15/2012 prepared for use during emergency conditions.