W3F1-2005-0051, Status of the Real Time Contingency Monitoring Program

From kanterella
(Redirected from W3F1-2005-0051)
Jump to navigation Jump to search
Status of the Real Time Contingency Monitoring Program
ML052780194
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/28/2005
From: Harris A
Entergy Nuclear South, Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2005-0051
Download: ML052780194 (3)


Text

Entergy Nuclear South Entergy Operations, Inc.

AM 17265 River Road Killona, LA 70057-3093

__y God Tel 504-739-6475 1ntffgy(Fax 504-739-6698 aharris~entergy.com Alan J. Harris Director. Nuclear Safety Assurance W3Fl-2005-0051 Waterford 3 September 28, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Status of the Real Time Contingency Monitoring Program Waterford Steam Electric Station, Unit 3 Docket No. 50-382 License No. NPF-38

REFERENCE:

1. Entergy Letter dated February 5, 2005, 'Supplement to Amendment Request NPF-38-249 Extended Power Uprate" (W3Fl-2005-0007)

Dear Sir or Madam:

By letter (Reference 1), Entergy Operations, Inc. (Entergy) committed to update the NRC staff regarding the status/capabilities of the real time contingency monitoring program by 30 September 2005 following testing planned for the summer of 2005. This letter provides the required update.

Programming changes to the existing real-time analysis software to perform nuclear post-trip analysis and other single contingency evaluations have been completed. The developmental and testing phases for evaluating real time and projected voltage requirements for Waterford Steam Electric Station, Unit 3 (Waterford 3) are substantially complete. Testing completed to date has indicated that there are no major issues outstanding with the software.

Entergy had planned to complete all testing to verify the adequacy of the programming changes to the software by September 2005. However, the damage to the transmission and distribution system infrastructure caused by hurricanes Katrina and Rita has required Entergy to reallocate available resources to storm recovery activities. This reallocation of resources is impacting the completion of formal testing as well as procedural development and the implementation stage of the real time contingency monitoring program at Waterford 3.

Entergy anticipates full implementation of the 'on line monitoring' capability at Waterford 3 prior to Summer 2006 peak load conditions on the grid.

As committed in Reference 1, until the real time contingency monitoring program is placed in service, Entergy will continue to perform Daily Model Load Flow studies for the next day using daily cases representing that day of the month. If any transmission contingencies with respect to an element directly interconnected with the Waterford 230 kV switchyard occur during the day, the analyses will be updated.

o0 c

W3Fl -2005-0051 Page 2 of 3 There are no new commitments contained in this letter.

If you have any questions or require additional information, please contact D. Bryan Miller at 504-739-6692.

Sincerely, AJH/DBM/cbh

,-Z W3Fl -2005-0051 Page 3 of 3 cc: Dr. Bruce S. Mallett U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector Waterford 3 P.O. Box 822 Killona, LA 70066-0751 U.S. Nuclear Regulatory Commission Attn: Mr. Nageswaran Kalyanam MS O-7D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway Attn: J. Smith P.O. Box 651 Jackson, MS 39205