U-602813, Monthly Operating Rept for Jul 1997 for Clinton Power Station,Unit 1

From kanterella
(Redirected from U-602813)
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1997 for Clinton Power Station,Unit 1
ML20210J671
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/31/1997
From: Demark W, Sipek J
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
U-602813, NUDOCS 9708180258
Download: ML20210J671 (5)


Text

_ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ - . . . .

in 14 t

lilinois Power Company Chnton Power Stat:on P O Box 678 Chnton,IL 61727 Tel 217 935-8881 hh h- Joseph V, Sipek Director - L censing an m.nov. crean, 8E.100c August 11, 1997 Docket No. 50-461 10CFR50.36 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 l

Subject:

Clinton Power Station, Unit 1 FaciF 7perating License 'NPF-62 Lub, . Monthly Oneratina Report

Dear Madam or Sir:

Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending July 31,1997.

Sincerely yours, bb.bs fr Joseph V. Sipek I Director Licensing , ( (

WED/lar Attachments cc: NRC Region III Regional Administrator NRC Resident Office, V-690 Illinois Department ofNuclear Safety 9708180; 38 970731 PDR ADOCK 05000461 3 ,s

!,h!hh

=ecaca - . ,

I

_ _ _ _ _ _ - _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ - - - _ _ - - - - - - - . = .

Attachment 1 U-602813 Page1of?

CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month July 1997 NONE

Attachment 1 -

U-602813 Page 2 of 4

- AVERAGE DAILY UNIT POWER LEVEL -

DOCKET NO. 50-461 UNIT Clinton 1 DATE 07/31/97 COMPLETED BY W. E. DeMark TELEPHONE (2171935-8881-X3537 MONTH July 1997 1 0 17 0 2 0 18 0 3 0 19 0 j 4 0 20 0

5. 0 21 0 6 0 22 0
7. 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0
11. 0 27 0 12 0 28. 0 13 0 29 0 4 i

'14 ~0 30 0

-15 0 31 0 16 0

e s. ,

Attachment 1 U 602813 Page 3 of 4 O.PERATING DATA REPORT DOCKET NO. 50-461:

UNIT ClintOn 1 DATE 07/31/97 COMPLETED BY W. E. DeMark TELEPHONE (2171935-8881-X3537 OPERATING STATUS -

r-

1. REPORTING PERIOD: July 1997 GROSS HOURS IN REPORT PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt); 2894  ;

MAX. DEPEND. CAPACITY (MDC) (MWe-Net): 930 DESIGN ELECTRICAL RATING (MWe-NET): 933_

- 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) MWe-Net): - Nonc __

4. REASONS FO?. RESTRICTION (IF ANY) N/A Tills MONTH - YRTO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 58.883 8
6. REACTOR RESERVE SHUTDOWN llOURS 0.0 0.0 0.0
7. - HOURS GENERATOR ON LIN5' 0.0 00

. - 57.401.9 -

8. UNIT RESERVE SIIUTDOWN HOURS ' .

- 0.0 00 40

9. OROSS THERMAL ENEROY OENERATED (MWH)_ 0 0.0 154.700.590 '
10. GROSS ELECTRICAL ENEROY OENERATED (MWH). 0 00- 51.120.966
11. ~ NETELECTRICALENEROY GENERATED (MWH)_ - 0 0 48.697.141
12. REACTOR SERVICE FACTOR 0.0%

- 0.0% 69 4 %

13. REACTOR AVAILABILITY FACTOD - 0.0% 0.0% 69.4 %
14. . UNIT SERVICE FACTOR.- 0.0*6 00% 67.6 %

' 13. . UNIT AVAILABILTTY FACTOD 0.0% 00% 67.6%

- 16. UNIT CAPACTlY } ACTOR (Using MDC) 0.0% 00% 61,7%

17. UNIT CAPACITY FACTOR (Using Design MWe) 0.0% 00% 61.5 %
18. ' UNIT FORCED OUTAGE RATE. 0.0% 00% 9.1%
19. - SHUrDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF -

EACH):

None. _

l

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

The unit will remain shut down until the completion of Refueling Outage 6 (RF-6); expected restart date is unknown,

-I

c. :.

Attaciunent 1 -

s IM02813

..PageIcf( -

= UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-461 UNIT Clinton 1 DATE 07/31/97 COMPLETED BY W. ElDeMark REPORT MONTH ' July 1997 MEDIOD OF '

TYPE SHUTTING DOWN F: FORCED DURATION THE REACIOROR CORRECTIVE

- NO. DATE S: SCHEDULED (HOURS) REASON (I) ' REDUCING POWER (2) ACTIONSKOMMENTS RF-6 10/13/96 S-' .744.0 C. Refueling Outage This unit remams in refueling outage.

(1) Reason A - Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D - Regulatory Restrictum E - Operator training & License Examination, F - Administrative, G - Operational Error (explain)'

(2) Method 1 - Manual,2 - Manual Scram, 3 - Automatic Scram,4 - Other (explain)

.- :.