U-601445, Monthly Operating Rept for Apr 1989 for Clinton Power Station,Unit 1

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1989 for Clinton Power Station,Unit 1
ML20247A929
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/30/1989
From: Holtzscher D
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
U-601445, NUDOCS 8905230331
Download: ML20247A929 (5)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _

.i -. . .

Paga 1 of 4

, , , Attachmsnt to U- 601445 CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month April 1989 None  ;

i 8905230331 890430 PDR R

ADOCK 05000461 PDC T'd

/

I i

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _. - - _ - _ 0

, ; ,;... t
  • i

'Paga 2 of 4~-

...- .. Attachmsnt to U- 601445 AVERAGE DAILY-UNIT POWER LEVEL DOCKET NO. '50-461-UNIT Clinton 1 DATE 04/30/89-COMPLETED BY D. L. Holtzscher TELEPHONE (217) 935-8881 .X3400 MONTH April 1989 DAY AVERAGE DAILY POWER LEVEL- DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

'l 0 17 0-2 0 18 0 3 0- 19' 0 4 0 ,

20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0-12 0 28 0

-13 0 29 0 14- 0 30 0 15- 0 31 N/A 16 0

' INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day 4 in the reporting month. Compute to the nearest whole m'egawatt.

These figures will be used to plot e L.aph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of

~ the unit, there may be occasions when the daily average power level exceeds

- the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

i j

Page-3 of 4

- *. Attachmsnt to U 601445. 1 OPERATING DATA REPORT DOCKET NO. 50-461  ;

I UNIT Clinton 1 i DATE 04/30/80 1 t

COMPLETED BY D. L. Holtzscher l TELEPHONE (217) 935-8881 X3400 OPERATING STATUS

.1. REPORTING' PERIOD: April 1989 GROSS HOURS IN REPORTING PERIOD: 719

2. CURRENTLY AUTHORIZED. POWER LEVEL (MWt): 2894 MAX. DEPEND. CAPACITY (MDC)

(MWe-Net): 930 DESIGN ELECTRICAL RATING (MWe-Net): 933'

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH .YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR WAS CRITICAL...- 0 50.9 8348.6 6.. REACTOR . RESERVE SHUTDOWN: HOURS . . . . . . . . . . 0 0 0 7.. HOURS GENERATOR ON LINE................ 0 46.4 8190.9'
8. UNIT RESERVE SHUTDOWN HOURS............ 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH)... 0 54,689 20,848,772 10.

~

GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 17,156 6,894,215

11. NET ELECTRICAL ENERGY GENERATED (MWH).. 0 7,195 6,552,040
12. REACTOR SERVICE FACTOR................. N/A 1.8% 66.5%
13. REACTOR AVAILABILITY FACTOR............ 0% 1.8% 66.5%
14. UNIT SERVICE FACT 0R.................... 0% 1.6% 65.2%

.15. UNIT AVAILABILITY FACTOR............... 0% 1.6% 65.2%

16. UNIT CAPACITY FACTOR (Using MDC)....... 0% 0.3% 56.1%
17. . UNIT' CAPACITY FACTOR.(Using Design MWe) 0% 0.3% 55.9%
18. UNIT FORCED OUTAGE RATE................ 0% 0% 5.8%
19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH): NONE 2 0.' IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

Due to emergent concerns regarding Equipment Qualification issues, the remaining work scope for the current outage is uncertain. Therefore, the date for startup of the plant has not yet been estimated.

21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 2/27/87 INITIAL ELECTRICITY (Synchronization) 4/24/87 COMPLETION OF WARRANTY RUN 10/09/87

4h1 c1 / e e i gi r c0 s8 S r T rnt o se6 z8 N u t i a r gt t8 O l r snner et - 1 l - I i o eiivE PAU 9 o5 T a R ami m n8H3 C F e ratl a 1 o/ 9 A t) ngr c yT xaa E rn) rm cad 6 t 0 .

4 n3L) E nnanor t on S re

- i/ 7 V einit oesii c u 0l4 .1 I mael at sit a llS n 5C0D2 T pl t el annal r -

aa i

( C nipnuurei rpe d uuot E ouxif gecmexh o nnt n R s q e a e e pi d pet h aauo

.TEYE R aE( MRROLAO( O t MMAC OI TBN O e - - - - - - - - e - - - -

NNA O C RA BCDE FG H M 1 234 UDDH T EP E TE K EL C LE O PT R D M NOR O W E C FORW ODOO TP DGC d ONAG e HIEN u S TTRI n N ET C i O MUEU t I HHD n T STE o C R C U 9 D 8 .

E 9 4 R 1 R l E i W

O r

p e P A g a

D t N u A H O T g S N N O n W M i O N l D T O e T R S u U O A f H P E e S E R R R

T  :

I C N

U N

O)

I S TR AU RO 9 UH 1 D( 7 D

E DL EU CD ERE POH YFC T S F  :

S S 2

0 E 1 T 0 A 9 D 8 O

N 1 l

(

, ; e + n . ;- >

U- 601445

.. .+

- L30-89(05 12)_Lp

.' 8E.100c ILLINOIS POWER COMPANY v; [f CLINTON POWER STATION, P.O. BOX 678, CLINTON, ILLINOIS 61727 '

May 12, 1989

- 1'0CFR50.36 RG 1.16

~

nocket No. 50-46'1.

Document Cont'rol Desk U.S._ Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Clinton Power Station, Unit 1 April 1989 Monthly Operating Report NPF-62

Dear Sir:

'Please find in Attachment 1 the Monthly Operating Report fore Clinton' Power Station, Unit 1. for the period ending April 30, 1989.

Sincerely yours, p- -J -

D. L. Holtzscher Acting Manager -

Licensing and Safety GSL/krm Attachment ec: . Regional Administrator, Region III, USNRC

\