TAC:10386
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
MONTHYEARML20063L5341982-09-0202 September 1982
[table view]Lists Control Room Instrumentation & Annunciators Affected During Operation W/Reactor Coolant Loop Removed from Svc,Per NRC Request at 820819 Site Visit ML20069H7941982-10-0808 October 1982 Forwards Addl Info Re two-loop Operation,Per NRC 820817 Request.Westinghouse Reviewing Question 7 Against Analysis ML20090H8921983-06-30030 June 1983 Revised Downcomer Annulus Thermal Shock Study for Beaver Valley Power Station ML20072M8661983-07-0606 July 1983 Confirms Info Exchanged During 830627 Conference Call Re N-1 Loop Operations.Isolation Valves Not Needed on 3-inch DHR Lines on Secondary Side ML20081A8771983-10-21021 October 1983 Forwards Response to 830828 Request for Addl Info Re N-1 Loop Operation.Any Asymmetries Existing Due to N-1 Loop Operation Have Little or No Impact on Power Distribution,Dnb Limits & Fuel Integrity ML20083Q5501984-04-10010 April 1984 Requests Pending SER Identify That Amend Approval Conditioned on Completion of Confirmatory NSSS Design Review for N-1 Loop Operation,To Provide Westinghouse Necessary Time to Complete Effort 1983-10-21 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:10386&oldid=3459016"