Forwards Basic Safety Rept, in Support of Cycle 4 Reload. Affidavit Encl.Rept Withheld (Ref 10CFR2.790) & Available in Central Files Only
ML19290E339
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/06/1980
From: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
To: Reid R
Office of Nuclear Reactor Regulation
Shared Package
ML19290E340 List:
References
TAC-43380, NUDOCS 8003100247
Download: ML19290E339 (3)


Text

.

, hgggj7 "NOT FOR FUELIC DISCLOSURE,10CFR2.790 INF0FMATION IMHtTHI!AST t#TILITII!S P

w men,e s..c ec aw Tv aw P.o. Box 270 a

}

w -.a rac u r r e ***

2 HARTFoAD. CONNECTICUT 06101

,m

, m.r. -.,.

m l

,m-,.-

k L

J,vav,w,, s nu..,,

,4.

.s, %, m 1,.~ms, March 6, 1980 Docket No. 50-336 Director of Nuclear Reactor Regulation Attn:

Mr. R. Reid, Chief Operating Reactors Branch #4 U. S. Nuclear Regulatory Cc::=issicn Washington, D. C.

20555

References:

(1)

W. G. Counsil letter to R. Feid dated February Ik,1980.

(2)

R. A. 'diesemann letter to H. R. Denten dated February 29, 1930.

(3)

R. A. Wiesemann letter to D. G. Eisenhut dated July 27, 1976.

Gentlemen:

Millstone IIuclear Fover Station, Unit :;o. 2 Cycle h Refueline - Easic Safety Retort Attached please find the Basic Safety Report (ESR) submitted in support of the Millstone Unit No. 2, Cycle h relcad.

The ESE is interded to serve as a reference fuel assembly and safety analysis report for the use of 'destinghcuse fuel at Millstone Unit No. 2.

As indicated in previcus correspcndence, this reload vill te the first instance in which ~4estinghouse vill supply the fuel and safety analyses fcr a non-Westinghouse NSSS. As a result, Northeast Nuclear Energy Company (NNECC) is submitting this document on an accelerated schedule to afford the 52C Staff additional review time.

Specifically, the attached docu.ent is being provided approxi ately six months in advance of the scheduled criticality date cf September 1, 1930.

Future submittals supporting the reload effort vill be docketed in accordance with the schedule provided in Reference (1).

It is our intention to discuss the schedular aspects of the revisv prceess as well as other technical concerns during a meeting with the Staff tentatively scheduled for March 18, 1980.

Due to the proprietary nature of pcrtions of the caterial contained in the attached report, NNECC recuests that the proprietary version of the Basic Safety Report be withheld from public disclosure in accordance with the

\\

h,

  1. iruvaggNCT FCR PUBLIC DISCLCSURE,10CFR2 790 INFORMATION

\\#4

  • /

4v

[

SQQ%too2Hg

NOT FOR PUBLIC DISCLOSURE,10CFR2 790 I:iFORMATION 2-provisions of 100FR2.790, and that tnis material be safeguarded.

The reasons for the classification of this caterial as proprietary are delinested in affidavits signed by Westinghouse and previously sut=itted in References (2) and (3).

Very truly yours, IiORTiiEAST :iUCLEAR ENEEGY CCMFA:iY

'/

~

9 U/ W

/

'dG.

Counsil Vice President Attachment

.s V.

& f..

h.L

,.w'v4vL.,

L.. -

  • 6, V
  • l. 1 Av.

1 i

e STATE OF CONNECTICITI )

j

)

ss. Berlin SA d

/ 9 f0 COUNTY OF HARTFORD

)

Then personally appe.tred before me W. G. Counsil, who being duly sworn, did state that he is Vice President of Northeast Nuclear Energy Conpany, a Licensee herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the Licensees herein and that the state:nents contained in said information are true and correct to the best of his knowledge and belief.

J Eff.

O

~

L Notary Public My Corr.is Ma E;pires M:rch 31, 1901