Requests Pending SER Identify That Amend Approval Conditioned on Completion of Confirmatory NSSS Design Review for N-1 Loop Operation,To Provide Westinghouse Necessary Time to Complete Effort
ML20083Q550
Person / Time
Site: Beaver Valley
Issue date: 04/10/1984
From: Carey J
DUQUESNE LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
TAC-10386, NUDOCS 8404230128
Download: ML20083Q550 (2)


Text

a C*

m

'A@

Telephone (412) 3934000 Nuclear Division P.O. Box 4 Shippingport, PA 15077-0004 April 10, 1984 irector of Nuclear Reactor Regulation United States Nuclear Pegulatory Camtission Attn:

Mr. Steven A. Varga, Chief Operating Peactors Branch No.1 Division of Licensing Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 N-1 Icop Operation Gentlemen:

Since the initial technical reviews on N-1 loop operation were initiated during 1978, a number of organizational changes have occurred at the Westinghouse Electric Corporation.

Some of these changes have involved individuals with responsibilities on the N-1 technical and licensing revicws.

We have been advised by Westinghouse that due to this time lapse, the number of personnel involved in this effort and the fact that we are the lead plant on N-1, it is necessary for Westinghouse to confirm the adequacy of the documentation being used to support the pending amendment.

Westinghouse has a high degree of confidence that this effort will reconfirm the adequacy of the NSSS plant design for N-1, and the review will have a positive impact on subsequent licensing issues for N-1 on a generic basis.

Therefore, to provide Westinghouse the necessary time to cmplete this effort, we are requesting that the pending SER identify that the amendment approval is conditioned on cmpletion of a " confirmatory design review".

If there are any questions on this matter, please contact my office.

Very truly s,

r J. J. Carey Vice President, Nuclear 8404230128 840410 PDR ADOCK 0500033 P

g

1 i

1' Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 N-1 Loop Operation Page 2 1

i cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Pegulatory Ccmnission Beaver Valley Power Station Shippingport, PA 15007 i.

i U. S. Nuclear Regulatory Ccmnission c/o Docurrent Management Branch Washington, DC 20555 i

j' Virginia Electric & Power Cocpany Director, Safety Evaluation and Control j

P.O. Box 26666 i

One James River Plaza i

Richttend, VA 23261 i

i t

}