Pages that link to "ULNRC-06754, Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications"
Jump to navigation
Jump to search
The following pages link to ULNRC-06754, Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications:
Displayed 50 items.
- ML17138A213 (← links)
- ML18036A676 (← links)
- ML18036A674 (← links)
- ML18036A673 (← links)
- ML18036A672 (← links)
- ML18036A671 (← links)
- ML18036A669 (← links)
- ULNRC-06441, SR 2018-02-00 for Callaway Plant, Unit 1, Non-Functionality of an Accident Monitoring Instrument for Greater than 30 Days (← links)
- ULNRC-06410, Callaway Plant, Unit 1 - Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (Ldcn 16-0001) (← links)
- ULNRC-06406, Special Report 2017-03 for Callaway Plant, Unit 1 Regarding Inoperability of a Post Accident Monitoring (PAM) Instrument (← links)
- ULNRC-06280, Submittal of Callaway Unit 1 Fitness for Duty Program Performance Data for 2015 (← links)
- ULNRC-06142, SR-14-002 Callaway, Unit 1 - Special Report 2014-02-PAM Report Inoperability of Post Accident Monitoring (PAM) Instrument (← links)
- ULNRC-06003, Callaway Plant Unit 1 - Core Operating Limits Report, Cover Letter (← links)
- ULNRC-05991, Special Report 13-001-00 for Callaway, Unit 1, Inoperability of a Seismic Instrument for Greater than 30 Days (← links)
- ULNRC-05987, Callaway Nuclear Plant, Unit 1, 2012 Annual Radiological Environmental Operating Report (← links)
- ULNRC-05976, Callaway Plant Unit 1, Status of Decommissioning Funding (← links)
- ULNRC-05967, Transmittal of Ameren Missouri Flooding Hazard Reevaluation Report in Response to NRC Request for Information Regarding Recommendation 2.1, Flooding, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident (← links)
- ULNRC-05946, ULNRC-05946: Response to RAI 2.3.4.2-1a and Amendment 19 to the Callaway LRA (← links)
- ULNRC-05944, Callaway Plant Unit 1 - Foreign Ownership Control or Influence (← links)
- ULNRC-05938, Callaway Plant Unit 1 - Responses to RAI Set 17 and Amendment 17 to the Callaway LRA (← links)
- ULNRC-05934, Ameren Missouri 180-Day Flooding Walkdown Response to NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(T) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of (← links)
- ULNRC-05931, Fitness for Duty Program Performance Data for Ameren Missouri Callaway Energy Center (← links)
- ULNRC-05893, Callaway, Unit 1, Enclosure 42 to ULNRC-05893 - Terracon 2010. Groundwater Monitoring, Fuel Groundwater Wells. February (← links)
- ULNRC-05893, Callaway, Unit 1, Enclosure 39 to ULNRC-05893 - Burns & Mcdonnell (Burns and Mcdonnell Engineering Company) 2008. Phase Ii Hydrogeologic Investigation Report Collector Well Siting Study, Callaway Unit 2. June (Part 1 of 3) (← links)
- ULNRC-05893, Callaway, Unit 1, Enclosure 24 to ULNRC-05893 - Callaway 2011 Air Emission Report (← links)
- ULNRC-05893, Callaway, Unit 1, Enclosure 23 to ULNRC-05893 - Callaway 2010 Air Emission Report (← links)
- ULNRC-05893, Callaway, Unit 1, Enclosure 22 to ULNRC-05893 - Callaway 2009 Air Emission Report (← links)
- ULNRC-05893, Callaway, Unit 1, Enclosure 21 to ULNRC-05893 - Callaway 2008 Air Emission Report (← links)
- ULNRC-05893, Callaway, Unit 1, Enclosure 9 to ULNRC-05893 - Discharge Monitoring Report - 2nd Quarter 2012 (← links)
- ULNRC-05893, Callaway, Unit 1, Enclosure 8 to ULNRC-05893 - Discharge Monitoring Report - 1st Quarter 2012 (← links)
- ULNRC-05893, Callaway, Unit 1, Enclosure 7 to ULNRC-05893 - Discharge Monitoring Report - 4th Quarter 2011 (← links)
- ULNRC-05893, Callaway, Unit 1, Enclosure 6 to ULNRC-05893 - Discharge Monitoring Report - 3rd Quarter 2011 (← links)
- ULNRC-05893, Callaway, Unit 1, Enclosure 20 to ULNRC-05893 - Callaway 2007 Air Emission Report (← links)
- ULNRC-05902, Callaway, Unit 1 - Enclosure 1: Responses to Environmental RAI Set 2 (← links)
- ULNRC-05901, Request for NRC Enforcement Discretion Regarding Requirements of Technical Specification 3.8.7, Inverters-Operating, ULNRC-05901 (← links)
- ULNRC-05892, Callaway Plant, Unit 1, Responses to RAI Set 5 and Amendment 7 to the Callaway LRA (with Updates to Previous RAI Responses) (← links)
- ULNRC-05874, ULNRC-05874: Amendment 3 to Application for Renewed Operating License (← links)
- ULNRC-05852, Callaway, Unit 1, Operating Quality Assurance Manual (Oqam) Revision 29 (← links)
- ULNRC-05855, Callaway, Unit 1, Response to NRC Request for Information 10 CFR 50.55a Request: Proposed Alternative to ASME OM Code Replacement Interval for Main Steam Isolation Valve Actuator Rupture Disks (← links)
- ULNRC-05824, Special Report 2011-01 for Callway, Unit 1 Regarding Inoperability of a Seismic Instrument for Greater than 30 Days (← links)
- ULNRC-05774, Callaway Plant Unit 1, (Ldcn 11-0010) New Technical Specification 3.7.20 (← links)
- ULNRC-05802, Union Electric Company, Request for Approval of Secure Voice Communications Ccore Module by Cellcrypt Limited (← links)
- ULNRC-05781, Callaway Plant, Unit 1 - Request for License Amendment to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (License Amendment Request Ldcn 11-0012) (← links)
- ULNRC-05803, Callway Plant, Unit 1, Facility Operating License NPF-030, 2010 Annual Radiological Effluent Release Report (← links)
- ULNRC-05796, Callaway Plant - Response to Request for Additional Information - 2011 Decommissioning Funding Status Report (← links)
- ULNRC-05769, Callaway Plant - 10 CFR 50.46 Annual Report, ECCS Evaluation Model Revisions (← links)
- ULNRC-05615, Callaway, Unit 1 - Operating Quality Assurance Manual (Oqam), Revision 27 (← links)
- ULNRC-05411, Transmittal of Callaway, Cycle 16, Core Operating Limits Report, Revision 0 (← links)
- ULNRC-05310, Supplemental Information for the 60-Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. (← links)
- ULNRC-05924, ULNRC-05924: Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events (Order Number EA-12-049) (← links)