ULNRC-05944, Callaway Plant Unit 1 - Foreign Ownership Control or Influence

From kanterella
Jump to navigation Jump to search
Callaway Plant Unit 1 - Foreign Ownership Control or Influence
ML13002A189
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/27/2012
From: Dunbar J M, Maglio S A
Ameren Missouri, AmerenUE, Union Electric Co
To:
Document Control Desk, Office of Nuclear Security and Incident Response
Shared Package
ML130020303 List:
References
ULNRC-05944
Download: ML13002A189 (4)


Text

t. SENSITIVE INFORMATION

-WITHHOLD FROM PUBLIC DISCLOSURE

-.;;::0 V' Am'aran UNDER 10 CFR 2.390 It fI' fI" Callawav Plant MISSOURI ************************** ******************************************************************************************************

  • *** ************************************************************************************************************

.... ...........................................

"""'" .........................................................................................................

,. ............................................................................... . December 27,2012 ULNRC-05944 Document Control Desk Attn: Director, Division of Security Operations Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 11545 Rockville Pike Rockville, MD 20852 Ladies and Gentlemen:

10 CFR 95.17(a)(l)

DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 FOREIGN OWNERSHIP CONTROL OR INFLUENCE (FOCI)

References:

1) NRC Letter dated March 22, 2002 to G. L. Randolph from M. L. Spr.inger
2) NRC Letter dated May 2, 2003 to L. H. Graessle from T. O. Martin Pursuant to the referenced letters and the requirements of 10 CFR 95.17(a)(l), Ameren Corporation

/ Union Electric Company (d/b/a! Ameren Missouri), is providing the enclosed information concerning the extent and nature of FOCI that would affect the company's response to Form SF-328 (FOCI Certificate Pertaining to Foreign Interests).

Enclosures 1,2, 9, and 10 to this letter contain sensitive information.

Withhold from public disclosure under 10 CFR 2.390. Upon removal of Enclosures 1,2,9, and 10, this letter is uncontrolled.

SENSITIVE INFORMA nON -WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 ............................

00... .. .......... , ...........

o ** eo ************************

o ******** * ********************

.................................

.................................................................

................... . .....................................................................................................................

.................................

................................................................

................... . PO Box 620 Fulton, MO 65251 AmerenMissouri.com

.... .... *....................... . ...................................................... ...... ,. . .................. . .................................

................................................................

................... .

ULNRC-05944 December 27,2012 Page 2 As indicated on the previous page, Enclosures 1, 2, 9 and 10 to this letter contain information that is considered sensitive information and should be withheld from public disclosure pursuant to the provision of 10 CFR 2.390. This letter does not contain new commitments.

If there are any questions, please contact Mark Dunbar at 314-225-1718.

CSP/nls

Enclosures:

Ameren Corporation

1. Updated response to question #6. 2. List of Key Management Personnel (KMP). 3. 2011 Proxy Statement of Ameren Corporation.

Sincerely, James M. Dunbar Facility Security Officer Callaway Plant Regulatory Affairs Manager 4. 2011 Annual Report (includes 2011 Form lO-K). 5. 10-K filed Period 1112312011.

6. 10-Q filed Period 3/3112012.
7. lO-Q filed Period 6/30/2012.
8. 10-Q filed Period 9/30/2012.

Union Electric Company (d/b/a! Ameren Missouri)

9. Updated response to questions
  1. 5 and #6. 10. List of Key Management Personnel (KMP). 11. DEFC 14C filed Period 4/2412012.

ULNRC-05944 December 27,2012 Page 3 cc: WITH

Enclosures:

u.s. Department of Energy Security and Emergency Management Attn: Carole HollmanlLCJV P. O. Box 2001 Oak Ridge, TN 37831 Mr. Elmo E. Collins, Jr. Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 WITHOUT

Enclosures:

Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuc1ear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8B1 Washington, DC 20555-2738 U.S. Nuclear Regulatory Commission 11555 Rockville MD 20852 Attn: J. Keith Everly NSIR/DSO Mail Stop: 0-2D-15 U.S. Nuclear Regulatory Commission 11555 Rockville, MD 20852 Attn: Douglas W. Hase NSIR/DSO Mail Stop: 0-2D-15 ULNRC-05944 December 27,2012 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy (without Enclosures):

Certrec Corporation 4150 International Plaza, Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution (without Enclosures):

A. C. Heflin F. M. Diya C. O. Reasoner III L. H. Graessle S. A. Maglio E. C. Olson T. B. Elwood C. S. Petzel C. J. Flinn (MC 1310) 1. M. Dunbar