Pages that link to "PNO-II-88-038, on 880603,outage Exceeded 48 H to Repair Leaking Tubes on Condenser B.Reactor Subsequently Tripped from Unrelated Switch Problem During Surveillance Test.Eddy Current Test Determined 30 Tubes Would Not Pass Probe"
Jump to navigation
Jump to search
The following pages link to PNO-II-88-038, on 880603,outage Exceeded 48 H to Repair Leaking Tubes on Condenser B.Reactor Subsequently Tripped from Unrelated Switch Problem During Surveillance Test.Eddy Current Test Determined 30 Tubes Would Not Pass Probe:
Displayed 15 items.
- PNO-II-85-081, on 850820,during Full Power,Reactor Tripped. Caused by Valving Procedure Error by Technician Replacing Reactor Coolant Loop Flow Transmitter.Source Range Channel Being Replaced.Restart Scheduled for 850824 (← links)
- ML20151X988 (← links)
- ML20151X452 (← links)
- ML20155H172 (redirect page) (← links)
- PNO-II-88-038 (redirect page) (← links)
- PNO-II-86-039, on 860531,plant Taken Out of Svc to Repair Damage to non-nuclear Components Caused by Water Hammer in Low Pressure Condensate Sys.Caused by Personnel Error During Restart.Plant Will Be Down for Several Days (← links)
- PNO-II-94-010, on 940225,licensed Reactor Operator Tested Positive During Random Drug Test (← links)
- PNO-II-86-087, on 861107,employee Received Calculated Exposure of 75 Rems to One Hand,Exceeding 10CFR20,18.75 Rems Limit.Cause of Contamination Undetermined.Region II Radiation Specialist Dispatched for Followup (← links)
- ML20249A906 (← links)
- ML20249A812 (← links)
- ML20249A044 (← links)
- PNO-II-89-040, on 890530,rapid RCS Pressure Decreased to Less than 2,000 Psi.Licensee Investigating Incident to Determine Root Cause & Corrective Action.Anticipated That Unit Will Be Down for Approx 2 Wks (← links)
- PNO-II-89-064, on 890907,plant Shut Down for More than 48 H to Determine Cause of Out of Spec Secondary Chemistry.Msiv a Test Circuitry Discovered Energized & Valve Declared Inoperable on 890908.Caused by Water Hammer in Flush Line (← links)
- PNO-II-89-020, on 890214,plant Shut Down Due to Continuing SG Conductivity & Sulphate Problems Associated W/Resin Intrusion Event.During Shutdown Steam Generators Flushed & Mechanically Cleaned Along W/Dearating Tank (← links)
- PNO-II-89-060A, on 890825,reactor Manually Tripped from 97% Power Due to Pressurizer a Safety Valve Lifting.Licensee Plans to Go to Cold Shutdown & Replace Valve.Repairs Expected to Take 1 Wk (← links)